28.12.2014 Views

OHS Performance Measurement in the Construction Industry

OHS Performance Measurement in the Construction Industry

OHS Performance Measurement in the Construction Industry

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Prelim<strong>in</strong>ary outcome performance <strong>in</strong>dicators identified were:<br />

■ Number of <strong>in</strong>juries <strong>in</strong>volv<strong>in</strong>g employees (especially, new employees), subcontractors<br />

or o<strong>the</strong>rs on site, <strong>in</strong>clud<strong>in</strong>g:<br />

■ m<strong>in</strong>or work-related <strong>in</strong>juries. For example, visits to first aid or medical facility;<br />

■ o<strong>the</strong>r work-related <strong>in</strong>juries which resulted <strong>in</strong> <strong>the</strong> worker tak<strong>in</strong>g time off work;<br />

■ any work-related <strong>in</strong>juries that required a worker to undertake alternative work<br />

duties; and<br />

compensable work-related <strong>in</strong>juries.<br />

■ Number of occurrences where <strong>the</strong>re was damage to property (i.e. mach<strong>in</strong>ery,<br />

equipment, structures) or potential <strong>in</strong>jury to employees, sub-contractors or o<strong>the</strong>rs<br />

(i.e. near misses).<br />

On advice from <strong>in</strong>dustry, <strong>the</strong>se performance <strong>in</strong>dicators were categorised by <strong>the</strong> ‘<strong>OHS</strong><br />

phases’ of a construction project. These stages <strong>in</strong>cluded:<br />

(1) establishment of a charter regard<strong>in</strong>g <strong>OHS</strong>;<br />

(2) establishment of a site specific <strong>OHS</strong> management system;<br />

(3) identification of major hazards at <strong>the</strong> site;<br />

(4) self assessment of <strong>the</strong> <strong>OHS</strong> management system;<br />

(5) self assessment of major hazards; and<br />

(6) completion of an <strong>in</strong>dependent audit.<br />

DEVELOPMENT OF POSITIVE PERFORMANCE INDICATORS 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!