Installation Readiness: Planning<br />

• Series of reviews of Target Hall procedures<br />

– Remove radiation shielding (radioactive)<br />

– Install temporary shielding<br />

– Perform installation work<br />

– Remove temporary shielding<br />

– Install permanent shielding<br />

– NOvA Docs 2621, 3539, 4978<br />

August 9, 2011 DOE Review Paul Derwent, <strong>Accelerator</strong> <strong>and</strong> <strong>NuMI</strong> <strong>Upgrades</strong> 15