30.12.2014 Views

Accelerator and NuMI Upgrades - Fermilab

Accelerator and NuMI Upgrades - Fermilab

Accelerator and NuMI Upgrades - Fermilab

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Risk: Ceramic Beam Tubes<br />

• Need 6 60” coated flanged ceramic beam tubes<br />

– Have 0 (2 coated but not flanged)<br />

– Order from CoorsTek<br />

• Infrastructure problems, expected in February<br />

• Impacts:<br />

– Shutdown end<br />

• Mitigations:<br />

– Fallback to short tubes <strong>and</strong> magnets: Schedule & Cost<br />

• Lattice redesign, additional parts<br />

– Fallback to existing 62” tubes: Schedule & Cost<br />

• Mechanical design <strong>and</strong> parts<br />

• Fragile <strong>and</strong> radioactive<br />

August 9, 2011 DOE Review Paul Derwent, <strong>Accelerator</strong> <strong>and</strong> <strong>NuMI</strong> <strong>Upgrades</strong> 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!