CE139 - Energy Saving Trust
CE139 - Energy Saving Trust
CE139 - Energy Saving Trust
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Case study 3: Super E timber frame<br />
(North Bersted)<br />
Super E is a Canadian standard yielding dwellings with high standards of<br />
thermal insulation and airtightness. Kelsey Housing Association decided to<br />
pilot the system on a detached family home within a development of nine<br />
properties. The components for the house structure were supplied to the UK<br />
construction company (Geoffrey Osborne Ltd) by Canadian manufacturer<br />
Alouette Homes, who also sent a team to the UK to train Osborne staff in the<br />
relevant assembly techniques.<br />
High standards of airtightness are achieved by careful detailing of the external<br />
breather paper, ensuring that there are no gaps and sealing all joins. Positive<br />
feedback has been given by the occupier who is very happy with the house in<br />
terms of quality, running costs and air quality. Noise levels from outside are also<br />
reported to be especially good.<br />
Key features<br />
Figure 13<br />
Completed house<br />
(Courtesy of Kelsey Housing Association)<br />
“We used the Super E system because it<br />
offers cost savings to the housing association<br />
combined with improvements in quality of<br />
life for residents and reduced impact on the<br />
environment”<br />
– Andrew Fellows, Chief Executive of Kelsey<br />
Client<br />
Architect<br />
Construction<br />
Ground floor<br />
External walls<br />
Roof<br />
Windows<br />
Air pressure test<br />
Heating<br />
Kelsey Housing Association<br />
Miller Hughes<br />
Concrete beam floor system with power-floated screed.<br />
U-value 0.27W/m 2 K<br />
Super E timber frame system with brick outer leaf.<br />
U-value 0.28W/m 2 K<br />
Pitched roof<br />
U-value 0.14W/m 2 K<br />
U-value 1.8W/m 2 K<br />
1.41 ac/h@50Pa<br />
Gas condensing combination boiler (SEDBUK 90.9 per cent)<br />
with heat recovery ventilation system.<br />
Carbon Index 8.3<br />
Build costs £723 per m 2<br />
Figure 14<br />
Super E house under construction showing careful<br />
detailing of vapour control layer<br />
(Courtesy of Kelsey Housing Association)<br />
12 Building energy efficient buildings using modern methods of construction