31.12.2014 Views

CE139 - Energy Saving Trust

CE139 - Energy Saving Trust

CE139 - Energy Saving Trust

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Case study 3: Super E timber frame<br />

(North Bersted)<br />

Super E is a Canadian standard yielding dwellings with high standards of<br />

thermal insulation and airtightness. Kelsey Housing Association decided to<br />

pilot the system on a detached family home within a development of nine<br />

properties. The components for the house structure were supplied to the UK<br />

construction company (Geoffrey Osborne Ltd) by Canadian manufacturer<br />

Alouette Homes, who also sent a team to the UK to train Osborne staff in the<br />

relevant assembly techniques.<br />

High standards of airtightness are achieved by careful detailing of the external<br />

breather paper, ensuring that there are no gaps and sealing all joins. Positive<br />

feedback has been given by the occupier who is very happy with the house in<br />

terms of quality, running costs and air quality. Noise levels from outside are also<br />

reported to be especially good.<br />

Key features<br />

Figure 13<br />

Completed house<br />

(Courtesy of Kelsey Housing Association)<br />

“We used the Super E system because it<br />

offers cost savings to the housing association<br />

combined with improvements in quality of<br />

life for residents and reduced impact on the<br />

environment”<br />

– Andrew Fellows, Chief Executive of Kelsey<br />

Client<br />

Architect<br />

Construction<br />

Ground floor<br />

External walls<br />

Roof<br />

Windows<br />

Air pressure test<br />

Heating<br />

Kelsey Housing Association<br />

Miller Hughes<br />

Concrete beam floor system with power-floated screed.<br />

U-value 0.27W/m 2 K<br />

Super E timber frame system with brick outer leaf.<br />

U-value 0.28W/m 2 K<br />

Pitched roof<br />

U-value 0.14W/m 2 K<br />

U-value 1.8W/m 2 K<br />

1.41 ac/h@50Pa<br />

Gas condensing combination boiler (SEDBUK 90.9 per cent)<br />

with heat recovery ventilation system.<br />

Carbon Index 8.3<br />

Build costs £723 per m 2<br />

Figure 14<br />

Super E house under construction showing careful<br />

detailing of vapour control layer<br />

(Courtesy of Kelsey Housing Association)<br />

12 Building energy efficient buildings using modern methods of construction

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!