03.01.2015 Views

Minutes of SAAS Health and Safety Committee Meeting Held on ...

Minutes of SAAS Health and Safety Committee Meeting Held on ...

Minutes of SAAS Health and Safety Committee Meeting Held on ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>SAAS</str<strong>on</strong>g> <str<strong>on</strong>g>Health</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safety</str<strong>on</strong>g> <str<strong>on</strong>g>Committee</str<strong>on</strong>g> <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>Held</str<strong>on</strong>g> <strong>on</strong> Thursday 22<br />

June 2008<br />

Present:<br />

Linda Pender<br />

Calum Roberts<strong>on</strong><br />

Judy Miller<br />

Alan Scott<br />

Dave Evans<br />

<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> Previous <str<strong>on</strong>g>Meeting</str<strong>on</strong>g><br />

The minutes <str<strong>on</strong>g>of</str<strong>on</strong>g> the meeting held <strong>on</strong> 14 February were agreed.<br />

Inspecti<strong>on</strong> Report<br />

Calum said the building was generally clean & tidy. However access was restricted<br />

in – 1 st floor area round servers. Acti<strong>on</strong>: Alan to remind BSU <str<strong>on</strong>g>of</str<strong>on</strong>g> housekeeping<br />

issues <str<strong>on</strong>g>and</str<strong>on</strong>g> need to keep area free for access <str<strong>on</strong>g>and</str<strong>on</strong>g> Calum would review this area in 1<br />

week’s time.<br />

Room 101 - window to be replaced.<br />

A review <str<strong>on</strong>g>of</str<strong>on</strong>g> cabling for PCs etc needs to be undertaken. Acti<strong>on</strong>: Calum to c<strong>on</strong>tact<br />

ISIS to ask for shorter cables or supplier details so we can order them.<br />

Accident Reports<br />

Two accidents were reported. A member <str<strong>on</strong>g>of</str<strong>on</strong>g> staff had a broken ankle after an<br />

accident outwith building which was dealt with by a first aider <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong>e general<br />

sickness case where a first aider had helped the member <str<strong>on</strong>g>of</str<strong>on</strong>g> staff in GVH <str<strong>on</strong>g>and</str<strong>on</strong>g> sent<br />

them home from work.<br />

<str<strong>on</strong>g>Health</str<strong>on</strong>g>y Working Lives<br />

The HWL Team were compiling br<strong>on</strong>ze <str<strong>on</strong>g>and</str<strong>on</strong>g> silver folders for the new HWL’s scheme.<br />

The Team hope to achieve the gold award by December 2008.<br />

The following activities will be arranged shortly:<br />

• <str<strong>on</strong>g>Health</str<strong>on</strong>g> checks – November<br />

• Positive living day – November<br />

• Mental <str<strong>on</strong>g>Health</str<strong>on</strong>g> Training in October/November<br />

Envir<strong>on</strong>mental objectives <str<strong>on</strong>g>and</str<strong>on</strong>g> targets update<br />

In 2007/08 90% <str<strong>on</strong>g>of</str<strong>on</strong>g> our waste was recycled <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong>ly 10% went to l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill. This result<br />

has been achieved with the help <str<strong>on</strong>g>of</str<strong>on</strong>g> our staff.


Gas/Electricity – electricity use had increase due to new air c<strong>on</strong>diti<strong>on</strong>ing units<br />

installed for new servers. We have now increased temperature in the server rooms<br />

to reduce energy usage <str<strong>on</strong>g>and</str<strong>on</strong>g> The Carb<strong>on</strong> Trust have carried out free energy survey<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> GVH, however they do not think there is much more we can do – a written report<br />

will be sent to <str<strong>on</strong>g>SAAS</str<strong>on</strong>g> within the next m<strong>on</strong>th.<br />

Water usage – The toilet areas had been improved, to reduce water usage - new<br />

cisterns, sensor taps <str<strong>on</strong>g>and</str<strong>on</strong>g> we have also carried out a trial <strong>on</strong> urinals to reduce<br />

flushing which saves a huge amount <str<strong>on</strong>g>of</str<strong>on</strong>g> water <str<strong>on</strong>g>and</str<strong>on</strong>g> was expected pay for itself within<br />

1 year period.<br />

Dalkia will now provide m<strong>on</strong>thly water meter readings.<br />

The Agency would be audited for ISO 14001 accreditati<strong>on</strong> in July 2008.<br />

AOB<br />

Acti<strong>on</strong>: Calum agreed to e-mail Team Leader’s about procedures for deal with used<br />

t<strong>on</strong>er cartridges.<br />

Accommodati<strong>on</strong> Team<br />

12 June 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!