10.07.2015 Views

Minutes of SAAS Health and Safety Committee Meeting Held on ...

Minutes of SAAS Health and Safety Committee Meeting Held on ...

Minutes of SAAS Health and Safety Committee Meeting Held on ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>SAAS</str<strong>on</strong>g> <str<strong>on</strong>g>Health</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safety</str<strong>on</strong>g> <str<strong>on</strong>g>Committee</str<strong>on</strong>g> <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>Held</str<strong>on</strong>g> <strong>on</strong> Wednesday 13August 2008Present:Linda PenderCalum Roberts<strong>on</strong>Judy MillerAlan ScottDave EvansAllan Corrigan – minute taker<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> Previous <str<strong>on</strong>g>Meeting</str<strong>on</strong>g>Acti<strong>on</strong> points from the previous meeting had been dealt with <str<strong>on</strong>g>and</str<strong>on</strong>g> BSU housekeepingissues were, for the most part, resolved <str<strong>on</strong>g>and</str<strong>on</strong>g> the server room had been tidied up.Calum had c<strong>on</strong>tacted ISIS <str<strong>on</strong>g>and</str<strong>on</strong>g> shorter cables would be installed <str<strong>on</strong>g>and</str<strong>on</strong>g> each floorwould have it’s own cable room around the end <str<strong>on</strong>g>of</str<strong>on</strong>g> this year.Inspecti<strong>on</strong> ReportActi<strong>on</strong> point: Calum to update First Aid notices.Portable appliances testing would take place over a weekend <strong>on</strong>ce Calum returnsfrom holiday.A window in room 101 would be replaced shortly <str<strong>on</strong>g>and</str<strong>on</strong>g> a window in room 201 neededto be repaired.Judy raised a point that staff were automatically switching <strong>on</strong> lights in her room whenthey arrive in the morning, even if room was bright. It was agreed that lightingrequirements in each room should be agreed by staff working in that room. Acti<strong>on</strong>:Calum to organise a poster campaign to highlight the need for staff to switch <str<strong>on</strong>g>of</str<strong>on</strong>g>flighting.Staircases – a tear in the lino flooring had been glued down for the moment <str<strong>on</strong>g>and</str<strong>on</strong>g> adecisi<strong>on</strong> <strong>on</strong> whether to replace the flooring was still to be taken.Housekeeping issues – most <str<strong>on</strong>g>of</str<strong>on</strong>g> the issues in the report had been dealt with <str<strong>on</strong>g>and</str<strong>on</strong>g>Dave would discuss files piled up in room 216 with the debt recovery team.Accident ReportsOne accident was reported. A member <str<strong>on</strong>g>of</str<strong>on</strong>g> staff had fallen down the stairs <str<strong>on</strong>g>and</str<strong>on</strong>g>severely bruised her ankle <str<strong>on</strong>g>and</str<strong>on</strong>g> a first aider was called for <str<strong>on</strong>g>and</str<strong>on</strong>g> advised that thepers<strong>on</strong> was taken to hospital.


<str<strong>on</strong>g>Health</str<strong>on</strong>g>y Working LivesSPS were working with the Agency <strong>on</strong> HWLs issues <str<strong>on</strong>g>and</str<strong>on</strong>g> had provided a trainer torun a mental health training tester sessi<strong>on</strong> <strong>on</strong> Friday 15 th August which will beattended by 14 members <str<strong>on</strong>g>of</str<strong>on</strong>g> staff. A two day mental health first aid training coursewould be held <strong>on</strong> 21/22 October.Envir<strong>on</strong>mental objectives <str<strong>on</strong>g>and</str<strong>on</strong>g> targets updateThe Agency had been audited <str<strong>on</strong>g>and</str<strong>on</strong>g> passed the ISO 14001 accreditati<strong>on</strong>.The Carb<strong>on</strong> Trust had carried out an energy saving audit <str<strong>on</strong>g>and</str<strong>on</strong>g> produced a reportwhich highlighted a couple <str<strong>on</strong>g>of</str<strong>on</strong>g> points about raising staff awareness <str<strong>on</strong>g>of</str<strong>on</strong>g> energy usagebut overall it has been a very positive report.Calum had carried out an audit <str<strong>on</strong>g>of</str<strong>on</strong>g> m<strong>on</strong>itors over a weekend recently <str<strong>on</strong>g>and</str<strong>on</strong>g> found <strong>on</strong>ly4 had been left <strong>on</strong> by staff.A travel plan for the Agency would be prepared by the end <str<strong>on</strong>g>of</str<strong>on</strong>g> September <str<strong>on</strong>g>and</str<strong>on</strong>g> a travelsurvey had been issued to staff which has had a good resp<strong>on</strong>se. The results wouldbe used to produce the travel plan.Water usage – the introducti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> new sensor taps, cisterns <str<strong>on</strong>g>and</str<strong>on</strong>g> urinals has resultedin an 84% saving in water usage since April. This had also resulted in financialsavings <str<strong>on</strong>g>of</str<strong>on</strong>g> £470 this quarter <strong>on</strong> the water bill.89% <str<strong>on</strong>g>of</str<strong>on</strong>g> waste has been recycled by staff in the agency in April <str<strong>on</strong>g>and</str<strong>on</strong>g> May 2008.AOBThere had been no take-up <strong>on</strong> the manual h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling training <str<strong>on</strong>g>and</str<strong>on</strong>g> it was agreed that acourse should be run shortly, attended predominantly for EDM staff. Acti<strong>on</strong>: Calumto speak to Ewhan <str<strong>on</strong>g>and</str<strong>on</strong>g> suggest the possibility <str<strong>on</strong>g>of</str<strong>on</strong>g> the manual h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling course beingm<str<strong>on</strong>g>and</str<strong>on</strong>g>atory for EDM staff <str<strong>on</strong>g>and</str<strong>on</strong>g> included in their PLPs.Accommodati<strong>on</strong> Team14 August 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!