L-Duct Joint Assembly<br />
1. Align two L-Duct busduct feeders by<br />
overlapping the conductors.<br />
2. Fix busduct housing with side covers on both<br />
sides.<br />
M5 SCREW<br />
JOINT COVER<br />
3. Connect each phase conductor with screws,<br />
nuts, plain washes and spring washes. Make<br />
sure that the screws are fully tightened.<br />
4. Insert a phase isolator to the joint section.<br />
5. Connect the external earth bars to the earth<br />
bars at the side of busduct housing.<br />
PHASE ISOLATOR<br />
6. Install the joint cover on both sides of busduct<br />
housing to complete the joint assembly.<br />
M8 BOLT<br />
BELLEVILLE WASHER<br />
SPRING WASHER<br />
M8 NUT<br />
M6 SCREW<br />
SIDE COVER<br />
EXTERNAL<br />
EARTH BAR<br />
L1<br />
L2<br />
L3<br />
N<br />
E<br />
JOINT COVER<br />
M5 SCREW<br />
40 | INSTALLATION & MAINTENANCE PROCEDURE