07.01.2015 Views

Project approval Form - Cat Mountain Villas Homeowners Association

Project approval Form - Cat Mountain Villas Homeowners Association

Project approval Form - Cat Mountain Villas Homeowners Association

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Date Submitted:_ ____________________________________________________________________________________<br />

Homeowner Name:___________________________________________________________________________________<br />

Property Address:_ ___________________________________________________________________________________<br />

Your Mailing Address:_ ________________________________________________________________________________<br />

Home Phone:___________________________________ Daytime Phone:______________________________________<br />

E-mail address:_ _____________________________________________________________________________________<br />

Time frame: <strong>Project</strong>ed start date:____________________ <strong>Project</strong>ed completion date:_______________________<br />

Who will do the actual work on this improvement ❏ Homeowner ❏ Contractor<br />

Contractor’s Business Name & Phone Number:_ ___________________________________________________<br />

_ ______________________________________________________________________________________<br />

Type of Improvement: ❏ Exterior Paint (same/similar) ❏ Roofing (same/similar) ❏ Basketball Goal<br />

❏ Walkway ❏ Fences ❏ Outbuildings ❏ Satellite Antennas<br />

❏ Siding (same/similar) ❏ Patios, Decks ❏ Other _ ________________________________<br />

❏ Driveway ❏ Room Additions _ ___________________________________<br />

Location of Improvement: ❏ Front of dwelling ❏ Back of dwelling ❏ Side of dwelling<br />

❏ Roof of dwelling ❏ Garage ❏ Patio<br />

❏ Other: _________________________________________________________<br />

Material to be used for Improvement:<br />

❏ Brick (specify color)___________________________ ❏ Stucco ❏ Cement, Concrete<br />

❏ Wood (specify type)_ _________________________ ❏ Electrical Wiring<br />

❏ Siding (specify composition & color) ___________________________________________________________<br />

❏ Paint (specify color)__________________________ (Include color sample if possible.)<br />

❏ Stain (specify color)___________________________<br />

❏ Other (specify type or color) _ ___________________<br />

Attachments:<br />

C a t M o u n t a i n H o m e o w n e r s A s s o c i a t i o n<br />

Architectural Review/Environmental Control Committee — <strong>Project</strong> Approval <strong>Form</strong><br />

for Repairs and Remodeling of Existing Exterior Structures<br />

❏ Detailed description of proposed exterior change or structure to be added<br />

❏ Detailed building plan showing elevations and dimensions<br />

❏ Lot plat showing all setbacks and easements with the structure footprint plotted<br />

❏ Other: _ ____________________________________________________________________<br />

I understand that the Architectural Review/Environmental Control Committee will act on this request in no more than<br />

45 days of receipt and contact me regarding their decision. I agree not to begin any property improvement without <strong>approval</strong><br />

from the Architectural Control Committee. I understand that Committee <strong>approval</strong>s do not override any applicable City codes.<br />

Homeowner signature:_______________________________________________<br />

Date:__________________________<br />

▸<br />

Return this completed form<br />

and attachments to:<br />

<strong>Cat</strong> <strong>Mountain</strong> <strong>Homeowners</strong> <strong>Association</strong><br />

6007 Mount Bonnell Road, Austin TX 78731<br />

512-451-3884


❏<br />

❏<br />

Fi n a l D i s p o s i t i o n<br />

Approved<br />

Not Approved<br />

Committee Use Only<br />

Date: _ _____________<br />

Review Committee Actions:<br />

Date:_ ______________________________________<br />

Committee Members involved:<br />

Actions taken:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!