07.01.2015 Views

Project approval Form - Cat Mountain Villas Homeowners Association

Project approval Form - Cat Mountain Villas Homeowners Association

Project approval Form - Cat Mountain Villas Homeowners Association

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Date Submitted:_ ____________________________________________________________________________________<br />

Homeowner Name:___________________________________________________________________________________<br />

Property Address:_ ___________________________________________________________________________________<br />

Your Mailing Address:_ ________________________________________________________________________________<br />

Home Phone:___________________________________ Daytime Phone:______________________________________<br />

E-mail address:_ _____________________________________________________________________________________<br />

Time frame: <strong>Project</strong>ed start date:____________________ <strong>Project</strong>ed completion date:_______________________<br />

Who will do the actual work on this improvement ❏ Homeowner ❏ Contractor<br />

Contractor’s Business Name & Phone Number:_ ___________________________________________________<br />

_ ______________________________________________________________________________________<br />

Type of Improvement: ❏ Exterior Paint (same/similar) ❏ Roofing (same/similar) ❏ Basketball Goal<br />

❏ Walkway ❏ Fences ❏ Outbuildings ❏ Satellite Antennas<br />

❏ Siding (same/similar) ❏ Patios, Decks ❏ Other _ ________________________________<br />

❏ Driveway ❏ Room Additions _ ___________________________________<br />

Location of Improvement: ❏ Front of dwelling ❏ Back of dwelling ❏ Side of dwelling<br />

❏ Roof of dwelling ❏ Garage ❏ Patio<br />

❏ Other: _________________________________________________________<br />

Material to be used for Improvement:<br />

❏ Brick (specify color)___________________________ ❏ Stucco ❏ Cement, Concrete<br />

❏ Wood (specify type)_ _________________________ ❏ Electrical Wiring<br />

❏ Siding (specify composition & color) ___________________________________________________________<br />

❏ Paint (specify color)__________________________ (Include color sample if possible.)<br />

❏ Stain (specify color)___________________________<br />

❏ Other (specify type or color) _ ___________________<br />

Attachments:<br />

C a t M o u n t a i n H o m e o w n e r s A s s o c i a t i o n<br />

Architectural Review/Environmental Control Committee — <strong>Project</strong> Approval <strong>Form</strong><br />

for Repairs and Remodeling of Existing Exterior Structures<br />

❏ Detailed description of proposed exterior change or structure to be added<br />

❏ Detailed building plan showing elevations and dimensions<br />

❏ Lot plat showing all setbacks and easements with the structure footprint plotted<br />

❏ Other: _ ____________________________________________________________________<br />

I understand that the Architectural Review/Environmental Control Committee will act on this request in no more than<br />

45 days of receipt and contact me regarding their decision. I agree not to begin any property improvement without <strong>approval</strong><br />

from the Architectural Control Committee. I understand that Committee <strong>approval</strong>s do not override any applicable City codes.<br />

Homeowner signature:_______________________________________________<br />

Date:__________________________<br />

▸<br />

Return this completed form<br />

and attachments to:<br />

<strong>Cat</strong> <strong>Mountain</strong> <strong>Homeowners</strong> <strong>Association</strong><br />

6007 Mount Bonnell Road, Austin TX 78731<br />

512-451-3884


❏<br />

❏<br />

Fi n a l D i s p o s i t i o n<br />

Approved<br />

Not Approved<br />

Committee Use Only<br />

Date: _ _____________<br />

Review Committee Actions:<br />

Date:_ ______________________________________<br />

Committee Members involved:<br />

Actions taken:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!