Do You Have A Question for the ProTrack Team? - PBS
Do You Have A Question for the ProTrack Team? - PBS
Do You Have A Question for the ProTrack Team? - PBS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Do</strong> <strong>You</strong> <strong>Have</strong> A <strong>Question</strong> <strong>for</strong><br />
<strong>the</strong> <strong>ProTrack</strong> <strong>Team</strong><br />
Hosted by <strong>the</strong><br />
Traffic Advisory Committee
Welcome from Crist Myers<br />
• New developments since we last met<br />
• Project updates<br />
• New release announcement and feature highlight<br />
• Future development strategies and industry direction
<strong>ProTrack</strong> Users Session<br />
• Use Microphone, speak slowly and clearly<br />
• Introduce yourself and <strong>the</strong> media facility you<br />
represent<br />
• We’ve come prepared… ask questions on any<br />
subject<br />
• Where possible, we will utilize <strong>ProTrack</strong> to help<br />
answer questions<br />
• If we run out of time, please stop by our booth in <strong>the</strong><br />
<strong>PBS</strong> Vendor Exhibit area (220) or NAB (N3434)
<strong>ProTrack</strong> Users Session<br />
Q & A
<strong>ProTrack</strong> Users Q & A Session<br />
How do you decide what gets in an upgrade<br />
of <strong>ProTrack</strong> Is it based on station<br />
requests Along with my first question, is<br />
<strong>the</strong>re a way that you can tell stations be<strong>for</strong>e<br />
you upgrade <strong>the</strong> system of <strong>the</strong> new<br />
in<strong>for</strong>mation and see if this would benefit<br />
<strong>the</strong>m
<strong>ProTrack</strong> Users Q & A Session<br />
Can I remove package types I don’t need or<br />
use anymore How do I do that manually<br />
I’m tired of plowing through all <strong>the</strong> old<br />
package types.
<strong>ProTrack</strong> Users Q & A Session<br />
This is regarding rights loading from ProLink:<br />
ProLink: How does this work Why are my<br />
rights not getting updated
<strong>ProTrack</strong> Users Q & A Session<br />
This is regarding Toolbox feeds: Why can’t I<br />
ever find <strong>the</strong>se and record as a stand-alone<br />
entity
<strong>ProTrack</strong> Users Q & A Session<br />
Is <strong>the</strong>re any way when putting multiple spots<br />
into a flight <strong>for</strong> rotation to have ANY control<br />
on <strong>the</strong> order of <strong>the</strong> rotation. It always seems<br />
to be pretty much alphabetical Very<br />
annoying when you want don’t want to have<br />
<strong>the</strong> same type of message in consecutive<br />
breaks. (Referring especially to <strong>the</strong><br />
“development” break.)
<strong>ProTrack</strong> Users Q & A Session<br />
Following up on last year: Is <strong>the</strong>re any way<br />
to set a record length longer than <strong>the</strong> length<br />
in <strong>the</strong> offer (instead of creating a new offer<br />
version or modifying <strong>the</strong> offer length <strong>the</strong>n<br />
switching it back once record schedules are<br />
finished)
<strong>ProTrack</strong> Users Q & A Session<br />
Following up on last year: Can screen<br />
<strong>for</strong>mats be assigned and recognized <strong>for</strong><br />
each media assigned to an offer
<strong>ProTrack</strong> Users Q & A Session<br />
On <strong>the</strong> purge list, can a field “next air date”<br />
be included
<strong>ProTrack</strong> Users Q & A Session<br />
When scheduling airs through <strong>the</strong> <strong>PBS</strong> Feed<br />
schedule, and offsetting it, can <strong>the</strong> new time<br />
be calculated somewhere on <strong>the</strong> screen to<br />
be sure <strong>the</strong> offset time is correct (instead of<br />
scheduling <strong>the</strong>n realizing it’s wrong <strong>the</strong>n<br />
deleting and trying it again). The time<br />
calculator isn’t always <strong>the</strong> most useful tool<br />
when offsetting times that cross over<br />
midnight
<strong>ProTrack</strong> Users Q & A Session<br />
Can Myers create a report <strong>for</strong> SABS I don’t<br />
have any issues with <strong>the</strong> program<br />
distributors or figuring out hours of<br />
programming, but I do have a problem trying<br />
to find <strong>the</strong> # and duration of pledge minutes.<br />
Why is <strong>the</strong>re no easy way to find or get that<br />
in<strong>for</strong>mation in a report
<strong>ProTrack</strong> Users Q & A Session<br />
Would Myers consider adding ano<strong>the</strong>r<br />
choice (Ingest) to <strong>the</strong> Media In<strong>for</strong>mation<br />
Status screen Right now <strong>the</strong> choices are<br />
Recorded, Not Recorded, Purged, and<br />
Requested. If you added Ingest as a<br />
selection we could create our dub list using<br />
that status.
<strong>ProTrack</strong> Users Q & A Session<br />
When purging media through <strong>the</strong> interactive<br />
purge list, is it possible to see a list of<br />
programs slated <strong>for</strong> purging (“Are you sure<br />
you want to delete <strong>the</strong>se <strong>for</strong>ever and ever”)<br />
be<strong>for</strong>e actually purging, to verify.
<strong>ProTrack</strong> Users Q & A Session<br />
Can a version of <strong>the</strong> grid be generated to<br />
include <strong>the</strong> entire title of a program If not,<br />
is that something a station can request as<br />
special report
<strong>ProTrack</strong> Users Q & A Session<br />
Currently <strong>the</strong>re is a Tape Pull List Report.<br />
Can that same report option also be created<br />
<strong>for</strong> Promo/Fillers and Underwritings
<strong>ProTrack</strong> Users Q & A Session<br />
How do I deal with a program that is split<br />
into two server files. We can make “multitape”<br />
attachments to one program, but not<br />
“multi-server”. I’m not talking about a<br />
program with sub-clips.
<strong>ProTrack</strong> Users Q & A Session<br />
I’d like to know about <strong>the</strong> module that allows<br />
<strong>ProTrack</strong> to interface with archive systems.
<strong>ProTrack</strong> Users Q & A Session<br />
Is <strong>the</strong>re a way to immediately tell if a show has been<br />
segmented We do not have enough server space<br />
to get pledge shows and pledge events. We ONLY<br />
record pledge events and subclip <strong>the</strong>m if we have<br />
live pledge from <strong>the</strong> local studio. Because <strong>ProTrack</strong><br />
only counts <strong>the</strong> time on default segments,<br />
subclipping out <strong>the</strong> pledge breaks changes <strong>the</strong><br />
length. If <strong>the</strong> program airs at a later time as a pledge<br />
event, <strong>the</strong> length is wrong on <strong>the</strong> program<br />
in<strong>for</strong>mation page. Programming ends up putting a<br />
90 minute program in 60 minute slot.
<strong>ProTrack</strong> Users Q & A Session<br />
Not a new question, but several of us who<br />
have participated in <strong>the</strong> Myers sessions at<br />
TechCon in <strong>the</strong> past, have inquired about an<br />
option <strong>for</strong> day-parting spot inventory, similar<br />
to <strong>the</strong> current ability to include/exclude days<br />
of <strong>the</strong> week – <strong>for</strong> example, making <strong>PBS</strong> Kids<br />
promos available <strong>for</strong> manual placement only<br />
during appropriate times. What is <strong>the</strong><br />
possibility of this happening
<strong>ProTrack</strong> Users Q & A Session<br />
How can we export program and break time<br />
info from <strong>ProTrack</strong> so it can be imported/<br />
uploaded to Blackbaud’s <strong>Team</strong> Approach<br />
software
<strong>ProTrack</strong> Users Q & A Session<br />
Some of us have <strong>the</strong> task of running <strong>the</strong> Quarterly Topic<br />
Report that originates from <strong>PBS</strong> and tailoring it to fit what<br />
programs we ran under certain program categories during<br />
that time span. We have recently received a<br />
software program from ano<strong>the</strong>r Pennsylvania Station that<br />
works in tandem with <strong>ProTrack</strong> to take this task from<br />
several days down to maybe an hour or so to do. It is not a<br />
program that everyone has. I think it would be helpful if<br />
Myers could develop a program that could help with this<br />
report. If you do not have help (like we do), it is extremely<br />
time consuming.
<strong>ProTrack</strong> Users Q & A Session<br />
Our automation system automatically updates <strong>the</strong> <strong>ProTrack</strong> offer<br />
length when a piece of media is ingested. That’s great. The<br />
downside is, when airchecks are recorded that are longer than <strong>the</strong><br />
offer length. When changing <strong>the</strong> offer length BACK to <strong>the</strong> original<br />
time (still not a problem), it also updates <strong>the</strong> lengths of future<br />
airs. THAT’S where it becomes a problem. When <strong>the</strong> aircheck is<br />
scheduled multiple times where logs are generated, you have to go<br />
into <strong>the</strong> log to fix <strong>the</strong> length. It can get time consuming. We don’t<br />
want to create two offers <strong>for</strong> <strong>the</strong> same show (one as aircheck/one<br />
as standard pledge) <strong>for</strong> airdate tracking purposes and <strong>for</strong> creating<br />
airchecks, etc.<br />
There is a prompt that asks to change attached media length. Can<br />
<strong>the</strong>re be a prompt to ask “change existing airdate lengths”
<strong>ProTrack</strong> Users Q & A Session<br />
There are some programs that are not <strong>for</strong>matted <strong>for</strong><br />
pledge, but <strong>the</strong>n we do pledge <strong>the</strong>m, so <strong>the</strong>y are<br />
segmented. Our operators enter in database/<br />
automation Segment 1 as full program duration and<br />
<strong>the</strong>n segs 2 thru whatever is <strong>the</strong> program broken into<br />
segments <strong>for</strong> pledge. Since <strong>the</strong> program is airing<br />
from same tape whe<strong>the</strong>r base version or segmented<br />
<strong>for</strong> pledge version, is <strong>the</strong>re a way that we can update<br />
within <strong>the</strong> log (when broken into parts) to start with<br />
seg 2
<strong>ProTrack</strong> Users Q & A Session<br />
When pulling up a log, <strong>ProTrack</strong> defaults to<br />
a date that is 3 or 4 months prior. I would<br />
like this to default to a current date. Is this a<br />
default you can adjust <strong>for</strong> me
<strong>ProTrack</strong> Users Q & A Session<br />
I would like to be able to print air date & time<br />
when researching Program Info on Air Date<br />
List (F3) screen. (I want to print <strong>the</strong> whole<br />
list, not just is visible on <strong>the</strong> screen.)
<strong>ProTrack</strong> Users Session<br />
Open Q & A<br />
From <strong>the</strong> Audience
Thanks <strong>for</strong> your participation<br />
at <strong>the</strong> TAC sponsored<br />
<strong>ProTrack</strong> Session<br />
support@myersinfosys.com