08.01.2015 Views

AIRTRANSPORTANNUALREPORT2012 - Archive

AIRTRANSPORTANNUALREPORT2012 - Archive

AIRTRANSPORTANNUALREPORT2012 - Archive

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WORLDBANKAIRTRANSPORTPORTFOLIO<br />

<br />

AirTransportPorolio<br />

TheWBGFY12airtransportporolioiscomposedofvariouslendingandnonlending(TechnicalassistanceandEconomicSector<br />

Work)projectsinthesixregionsasdefinedbytheWorldBank(IDAandIBRD).Inaddion,theIFChasacurrentporolioofpro<br />

posedandacvelendingorinvestmentfinancingthroughouttheaviaonsector.<br />

AcveProjects IBRD IDA IFC TOTAL<br />

(inmillionsUSD) FY12 FY11 change FY12 FY11 change FY12 FY11 change FY12 FY11 change<br />

WBGroupTotal<br />

AcvePorolio<br />

WBGroupAcve<br />

PorolioTransport<br />

%ofTotalAcve<br />

Porolio<br />

AirTransportAcve<br />

Projects<br />

%ofTotalAcve<br />

Porolio<br />

%ofTotalTransport<br />

Porolio<br />

105,134 102,305 2.8% 68,573 69,450 1.3% 45,275 42,777 5.8% 218,981 214,532 2.1%<br />

26,755 26,005 2.9% 11,718 13,156 10.9% 2690 2,695 0.2% 41,163 41,856 1.7%<br />

25.4% 25.4% 0.0% 17.09% 18.9% 1.9% 5.9% 6.3% 0.4% 18.8% 19.5% 0.7%<br />

277.2 285.0 2.8% 335.5 334.2 0.4% 632.9 685.5 7.7% 1,245.6 1,304.8 4.5%<br />

0.3% 0.3% 0.5% 0.5% 1.4% 1.6% 0.2% 0.57% 0.6% <br />

1.0% 1.1% 2.9% 2.5% 23.5% 25.4% 1.9% 3.03% 3.1% <br />

TheoverviewabovesummarizestheWBG’smostimportantprojectsWBG.Severalsmallerscaleprojects,projectcomponentsor<br />

projectsinearlystagesofdevelopmentarenotincluded.<br />

ExcludingtheMullateralInvestmentGuaranteeAgency(MIGA)<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!