<strong>Minutes</strong> <strong>of</strong> the <strong>meeting</strong> held on 19.2.2009 for <strong>monitoring</strong> the implementation<br />

PRIMEMINISTER'SPACKAGE<br />

<strong>of</strong><br />

A) THE PROJECTS FOR WHICH FOUNDATION STONES WERE' LAID BY THE Hon'ble <strong>PM</strong> ON<br />

31sT JANUARY 2008<br />

"T New Secretariat Building at Itanagar:<br />

Status: The DPR submitted by the governmel)t <strong>of</strong> Arunachal Pradesh to the Ministry <strong>of</strong> DONER<br />

has been sent to MOUD for techno-economic clearance. MOUD needed some clarifications<br />

which have been furnished by the state PWD. Clearance from them is awaited.<br />

Action: MOUD should provide their comments on the total project to the Ministry <strong>of</strong> DONER at<br />

the earliest.<br />

ii.<br />

Pare Hydroelectric Project: Status: During the <strong>meeting</strong> in <strong>PM</strong>O on 29thJuly, it was decided<br />

that the Ministry should finalize the CCEA note within August 2008, and the subsequent project<br />

milestones pursued in a time bound manner. CCEA clearance has been obtained.<br />

Full time<br />

General Manager as in-charge for project implementation has been posted. Timelines for various<br />

activities have been delineated. Total time required for completion <strong>of</strong> the project has been taken<br />

as 38 months.<br />

Construction Activities:<br />

.:. ApproachRoadto PowerHouse:FormationCutting/Filling<strong>of</strong> approachroadto PowerHouse<br />

has beencompleted.<br />

.:. Approach,road to Dam Top: FormationCutting/Filling<strong>of</strong> approachroad to Dam Top has<br />

beencompleted.<br />

.:. RCCSlab Culverton ApproachRoadto PowerHouseand Dam site is underprocessand<br />

FormationCuttinglfilling<strong>of</strong> SurgeShaftRoadcompleted.<br />

.:. ApproachRoadto Adit-I&II:Formationcutting<strong>of</strong> Approachroadto Adit-I&IIis underprocess.<br />

Other Activities:<br />

~ Hydro -Meteorological Studies: Collection <strong>of</strong> Discharge and other H.M. data is<br />

being continued.<br />

The Petrographic analysis <strong>of</strong> silt are being done in OSI, Shillong<br />

and Chemical Analysis <strong>of</strong> water are being done at RRL Jorhat through QCA, Tezpur.<br />

~ Confirmatory Topographical survey: Confirmatory Topographical survey and reparation <strong>of</strong><br />

drawing completed.<br />

~ Construction Power And Power Evacuation: The Cons'ruction power requirement <strong>of</strong> Pare<br />

HE Project is 3.2 MW as per peak load during construction.<br />

It will be drawn from Dikrong<br />

Power House from Existing spareable 33 KV breaker.<br />

line.<br />

It will be evacuated through 33 KV


,. The 110 MW power <strong>of</strong> Pare HE project will be evacuated through existing 132 KV Doimukh<br />

-Nirjuli Transmission Line (DTNL) Loop in and Loop out at Pare 132 KV switchyard.<br />

,. The Department <strong>of</strong> Power, Govt. <strong>of</strong> Arunachal Pradesh has proposed to draw 132 KV double<br />

circuit line from Dikrong 132 KV switchyard to Itanagar. From this double circuit 132 KV line.<br />

one single circuit 132 KV line will be loop in loop out Pare 132 KV switchyard.<br />

Financial-Status:<br />

.:. Estimated cost <strong>of</strong> Project: Rs 573.99 Crore including IDC & FC <strong>of</strong> Rs 68.06 at June' 07 P.L.<br />

.:. The Corporation has signed the Loan Agreement with kfW, Germany for loan (ECB) with s<strong>of</strong>t<br />

rate<strong>of</strong> interestunderIndo-GermanFinancialCorporationon 11th December2008.<br />

.:. First year Tariff came down from 2.38 to 1.99 after getting loan from kfW. Germany.<br />

Tendering:<br />

. Design and Review consultancy Work: Price bid opened on 16.12.08 and evaluation is<br />

under process.<br />

· Civil and Hydro- mechanical works (Package-I): Price bids for package-I have been<br />

opened on 28.11.08 and award <strong>of</strong> work is under process:<br />

. Electro-Mechanical works (Package-II): Price bids for package -II have been opened on<br />

02.01.09 and award <strong>of</strong> work is under process.<br />

· NIT (Notice Inviting Tender) for Construction <strong>of</strong> 1 (one) no <strong>of</strong> Executive Hostel and<br />

.<br />

1(oneJ no. <strong>of</strong> Staff Hostel at Power House site floated on th<br />

opened on 02.12.2008. Evaluation is under process.<br />

November 2008 and<br />

NIT for Construction <strong>of</strong> 1 (One) no. <strong>of</strong> Executive Hostel and 1(one) no. <strong>of</strong> Staff Hostel<br />

at Dam site floated on 10thNov~mber, 2008 and opened on 0512.2008 .Evaluation<br />

under process.<br />

iii. Dibang Multipurpose Project:<br />

Status: During the <strong>meeting</strong> in <strong>PM</strong>O on 29th July, it was decided that for attending to forest<br />

related matters impinging on the project, Ministry <strong>of</strong> Environment and Forest (MoEF) should<br />

consider posting a Regional <strong>of</strong>ficer <strong>of</strong> the Ministry at Itanagar. Considering the requirement <strong>of</strong><br />

the Dibang project and other projects, and keeping in view the fact that Arunachal Pradesh has<br />

about 83% <strong>of</strong> the forest cover, MoEF should explore, in consultation with Ministry <strong>of</strong> Power<br />

(MoP), granting a special dispensation to Arunachal Pradesh for satisfying the requirements <strong>of</strong><br />

compensatory afforestation in relation to critical projects, as a special case. Secretary Power<br />

GoAP has sent the proposal to MoEF <strong>of</strong> GOI for their consideration. It was also decided that the<br />

CCEA clearance should be obtained by February 2009, as indicated by MoP.<br />

Action: MoEF have neither posted a Regional Officer nor have granted a special dispensation to<br />

Arunachal Pradesh in this regard. CCEA clearance has also not been obtained. The public<br />

hearing for environmental clearance for this project that was scheduled a number <strong>of</strong> times but<br />

could not be held has been refixed for 2th March 2009.


iv. ltanagar Water Supply Scheme: PHED had submitted UC and other documents for<br />

release <strong>of</strong> next installment. However, these were not as per the requirements <strong>of</strong> MoUD. The<br />

state government has now duly submitted UC and all relevant and required documents.<br />

Action: MoUD <strong>of</strong> GOI have to release the next installment.<br />

v. New. Railway line from Harmuti to Itanagar: The Deputy Commissioner (DC) <strong>of</strong><br />

Papumpare district in the <strong>meeting</strong> held in July 2008 had informed that all the bottlenecks in the<br />

land acquisition have been removed and the process will be complete by September 2008.<br />

During the <strong>meeting</strong> in <strong>PM</strong>O on 29th July, the Railways were asked to commence work by<br />

September 2008.<br />

Status: The length <strong>of</strong> proposed railway line from (Gumto) Assam-Arunachal border to Borum<br />

(Naharlagun) is 11.5 Km.<br />

This part is to taken in the first phase for construction and the<br />

remaining part from Borum to Itanagar will be taken in the second phase. So far the railway<br />

authorities have got possession <strong>of</strong> only 2.6 Km <strong>of</strong> the first phase. The DC Papumpare informed<br />

that he has already prepared award and would send demand for funds for disbursement <strong>of</strong><br />

compensation to railway authorities within next 4-5 days.<br />

Action: It was emphasized that the Chief Secretary, on the assurance <strong>of</strong> DC Papumpare, had<br />

committed in the <strong>meeting</strong> held in <strong>PM</strong>O in July 2008 for handing over <strong>of</strong> the entire land by<br />

September 2008 and it was creating an embarrassment to the state government before GOI. DC<br />

Papumpare was advised to discuss the details with the railway authorities before sending the<br />

demand. He was further advised to make vigorous efforts as the delay in handing over land by<br />

the state government would delay execution <strong>of</strong> the project by the railway authorities.<br />

B) THE PROJECTS FOR WHICH ANNOUNCEMENTS MADE BY THE Hon'ble <strong>PM</strong> ON 31sT<br />

JANUARY 2008<br />

i) ELECTRIFICATION OF ALL HOUSES IN THE STATE:<br />

It was announced that a program <strong>of</strong> electrification <strong>of</strong> all houses in the <strong>State</strong> will be taken up.<br />

An amount <strong>of</strong> Rs. 550 Crore will be spent to provide electricity through solar power as well<br />

as small hydropower projects to all the villages along the <strong>State</strong> border. Electricity will be<br />

provided to these villages within a span <strong>of</strong> two years.<br />

Status: The Planning Commission has already sanctioned Rs. 169.11 Cr for the completion<br />

<strong>of</strong> some 42 incomplete projects to add total capacity <strong>of</strong> 47.28 MW. Entire amount <strong>of</strong> Rs<br />

169.11 Cr has been released by the Planning Commission. Nineteen projects with 22.93<br />

MW capacity, including some <strong>of</strong> the major projects like 4 MW Sippi in Upper Subansiri<br />

district, have been completed and five more will be completed by 31.3.2009 with the capacity<br />

addition <strong>of</strong> 6.90 MW. Out <strong>of</strong> 18 remaining projects 13 with the capacity <strong>of</strong> 3.75 MW will be<br />

completed by September 2009 and 5 with the capacity <strong>of</strong> 13.70 MW by March 2010. The<br />

state government in the Hydropower department have reviewed the performance and<br />

worked out a realistic assessment <strong>of</strong> the absorption capacity and the department has asked<br />

for extension and for permission to divert the funds to other 4 incomplete projects, funding


for which is expected next year. The Chief Engineer Hydropower also informed that they<br />

have submitted the proposal <strong>of</strong> Rs 105.31 Cr to the state planning department for inclusion<br />

in the next year's Annual Plan <strong>of</strong> the state.<br />

Ministry <strong>of</strong> New and Renewable Sources <strong>of</strong> Energy have obtained CCEA approval for the<br />

Second component <strong>of</strong> works worth Rs 275.58 Cr and have released Rs 16.72 Cr.<br />

The department has submitted the DPR as per following break-up<br />

1)Part B: 4 projects with 17.03 MW capacity with an estimated cost <strong>of</strong> RS.105.31 Cr. This<br />

is expected to come as ACA from the Planning Commission<br />

2)part C (On-going) to complete 20 ongoing projects adding 8.68 MW to benefit 168<br />

villages at the cost <strong>of</strong> Rs.49.91 Cr<br />

3)part C (New) to complete 30 new projects 7.51 MW benefiting 347 villages at the cost <strong>of</strong><br />

RS.116.22Cr<br />

4)Electrification <strong>of</strong> another 183 villages through micro-hydel projects APEDA: RS.36.99 Cr<br />

5)Completion <strong>of</strong> 31 projects under APEDA: RS.2.74 Cr. Will they adhere to the target date<br />

<strong>of</strong> 31.3.2009<br />

6)Solar lighting in remote and border villages with the cost <strong>of</strong> Rs 9.00 Cr.<br />

7)63 T&D schemes: RS.85.27Cr.<br />

Progress <strong>of</strong> works as reported by APEDA as on 13thFebruary 2009 is as under.<br />

Illumination <strong>of</strong> 564 Villages in Arunachal Pradesh under P.M. Package (Rs. 9.00 Cr):<br />

already awarded to following S.P.V Manufacturers on 15.12.2008 through call <strong>of</strong> tenders.<br />

Date <strong>of</strong> completion fixed is 20thMarch 2009.<br />

1) MIs Reliance Industries Ltd. Kolkata for illumination <strong>of</strong> 294 villages in 3 districts <strong>of</strong> Anjaw,<br />

Kurung,Kum'ey& Changlang. Out <strong>of</strong> the total quantity <strong>of</strong> 2975 Nos. <strong>of</strong> Solar Home Systems<br />

ordered, 75q Nos. have already arrived at Itanagar. Balance are under dispatch.<br />

2) MIs Icomm tele Ltd. Hyderabad for illumination <strong>of</strong> 114 villages in 5 districts <strong>of</strong> West Siang,<br />

Upper,Siangf Dibang Valley, Tawang & West Kameng. 500 Nos. <strong>of</strong> Solar Home Systems out<br />

<strong>of</strong> 993 Nos.' ordered have been received at Itanagar and they are being dispatched for<br />

further installation in the villages. Balance 443 are expected within next two weeks.<br />

3) MIs Sun Energy Systems, Anand, Gujarat for illumination <strong>of</strong> 138 villages in 2 districts <strong>of</strong> East<br />

Kameng & Upper Subansiri. No materials have been received so far. Out <strong>of</strong> 1790 systems<br />

about 600 have arrived Bhalukpong.<br />

During the <strong>meeting</strong> in <strong>PM</strong>O on 29th July, it was decided that the solar component <strong>of</strong> the project<br />

should be executed before March 2009. Director APEDA was not present in the <strong>meeting</strong>. However,<br />

his representative informed that in spite <strong>of</strong> the strike they are hopeful <strong>of</strong> completing the work by<br />

31.3.2009 under this program.<br />

Electrification <strong>of</strong> 183 villages by setting up <strong>of</strong> 74 Nos. <strong>of</strong> Micro Hydel Projects in Arunachal<br />

Pradesh<br />

Work<br />

Target<br />

under P.M. package (Rs. 36.99 Cr): Three teams <strong>of</strong> engineers from the Alternate Hydro<br />

Energy center (AHEC), liT,! Roorkee have already inspected at least 30% <strong>of</strong> the proposed projects<br />

sites and they have gone back with the validated data. The DPRs are under preparation at AHEC,


Roorkee. One Project Officer from this <strong>of</strong>fice is being sent to Roorkee for assisting them. The<br />

number <strong>of</strong> projects may vary now and sanction will be accorded accordingly.<br />

Electrification<strong>of</strong> 57 remote villages and one hamlet by setting up <strong>of</strong> 31 Micro Hydel Projects<br />

(on going) (Rs. 2.7439 Cr):<br />

1) Amount <strong>of</strong> Rs. 2.7439 Cr has been released from P.M. Package for completion <strong>of</strong> these<br />

projects.<br />

2) Out <strong>of</strong> 31 Projects 11 have been commissioned and rest are in advance stage <strong>of</strong> completion.<br />

3) Status <strong>of</strong> progress <strong>of</strong> each project is given below. All but for SI.No.26 & 29 will be completed<br />

by 31.3.2009.<br />

SI. Name <strong>of</strong> pistrict stt Fund released Expenditure Achievement<br />

No. Microhydel :ost ""'NRE <strong>State</strong> P.M. Total up to Dec' 08<br />

Project ac Rs ....acRs acRs Package ac Rs Lac Rs ivil Works<br />

(MHP) Lac Rs ac Rs<br />

E&M<br />

quipments<br />

1 imikang awang 1.79 12.00 14.35 l44 35.79 34.86 Completed ....ommissioned<br />

2x15KW)<br />

') men ast 31.58 12.00 14.00 5.58 31.58 28.65 l..ompleted nder<br />

2x10Kw) Kameng<br />

nstallation<br />

j Katting ast 36.61 12.00 14.00 10.61 t36.61 31.21 ....ompleted Commissioned<br />

2x10Kw) kameng<br />

4 Patha East ,5.94 15.00 ')7.80 3.11 48.91 39.16 ompleted Under<br />

2x20Kw) Kameng nstallation<br />

J Vlacha ....ast :27.44 6.00 .91 13.53 27.44 21.51 Completed ....ommissioned<br />

2x5Kw) Kameng<br />

3 Panya ower 29.18 12.00 U5 7.83 '9.18 24.40 Completed nder<br />

2x10Kw) Subansiri nstallation<br />

rr Seem Lower 53.22 12.00 5.41 3.81 1.22 29.25 :ompleted Procured<br />

2x20Kw) ubansiri<br />

8 Sima Upper 35.97 .OO 9.35 14.62 29.97 20.97 O% Ordered<br />

2x10Kw) Subansiri<br />

omplete<br />

9 Dodokro Upper 4.41 12.00 14.00 j.41 34.41 '2.26 O% :>rocured<br />

2x10Kw) Subansiri<br />

Complete<br />

10 Row Upper 31.31 9.00 14.00 .34 '8.34 '2.48 Completed Procured<br />

2x10Kw) Subansiri<br />

11 \lguriangb Papum 41.50 18.00 14.35 9.15 1.50 9.68 Completed ommissioned<br />

ling<br />

:>are<br />

2x15Kw)<br />

12 Sikhi Papum 0.56 18.00 14.35 :3.21 40.56 39.40 ....ompleted Commissioned<br />

2x15Kw) Pare<br />

13 Rongte Papum 5.50 6.00 7.91 11 59 ')5.50 ')0.10 - ompleted Procured<br />

2x5Kw)<br />

Pare<br />

14 3ri I\urung 38.59 9.00 10.85 18.74 38.59 :>8.10 Completed :>rocured<br />

2x5Kw)<br />

Kumey<br />

-<br />

I


15 ugee urung 9.49 11.50 .35 .14 8.99 2.79 ompleted Commissioned<br />

2x10Kw) Kumey<br />

16 Kirbung est 25.80 5.00 .91 11.89 25.80 21.80 :ompleted Installed, to be<br />

2x5Kw) 5iang ommissioned<br />

17 pOkoputu Nest 33.79 6.00 14.00 7.79 7.79 18.11 90% Jispatched<br />

2x10Kw) Siang<br />

Ijomplete<br />

18 Kagi West 146.70 .OO 14.35 14.35 37.70 )9.10 ompleted Commissioned<br />

2x15Kw) Siang<br />

19 30ye West rocured<br />

2x15Kw)<br />

Siang<br />

27 omo West .22 12.00 25.41 3.81 41.22 35.14 Completed Under<br />

2x20Kw) Siang nstallation<br />

28 Rimi West 53.22 12.00 ;25.41 3.81 41.22 37.08 O% Under<br />

2x20Kw) Siang omplete nstallation<br />

29 Nikte est 41.96 3.00 '0.85 f3.11 32.96 18.31 Started Procured<br />

2x15Kw)<br />

iang<br />

jO Eya Jibang 25.88 6.00 7.91 11.97 5.88 16.18 Completed Jnder<br />

2x5Kw) Valley nstallation<br />

31 :;ibuk Upper f32.95 12.00 14.00 6.95 32.95 29.18 ompleted Commissioned<br />

2x10 Kw) Siang<br />

- Total 1207.39 1323.25 1468.00 R74.39 1065.64 825.70<br />

MNRE are working on a project component <strong>of</strong> Rs 275.58 Cr. EFC has already been held<br />

they may indicate the overall progress and also the status <strong>of</strong> sanction <strong>of</strong> project and release <strong>of</strong> funds<br />

as well as various time lines for timely completion <strong>of</strong> the.<br />

ii) Construction <strong>of</strong> Greenfield airport in Itanagar:<br />

'Status: During the <strong>meeting</strong> in <strong>PM</strong>O on 29thJuly, it was decided that MoCA would expedite<br />

the PIS note and CCEA approval. It was also decided that Ministry <strong>of</strong> Civil Aviation (MoCA)


should ensure that the work on the project actually starts by December 2008. It was also<br />

decided that the MoEF should expedite forest clearance from their end. Forest Advisory<br />

Committee in their <strong>meeting</strong> held on 05.9.2008 gave first stage forest clearanc~ <strong>of</strong> the.<br />

Around Rs 25 Cr are needed to be deposited as NPV and compensatory afforestation etc.<br />

Planning Commission has been requested.<br />

The <strong>State</strong> Government has forwarded DPR received from the Airports Authority <strong>of</strong> India<br />

. . ..--..<br />

(AAI) to the Planning Commission <strong>of</strong> India. However, AAI has reduced the requirement <strong>of</strong><br />

land from 928Ha forestland to 250 Ha and revised the DPR accordingly. MoCA has moved<br />

the PIS note.<br />

iii)<br />

Operationalization <strong>of</strong> airports at Pasighat, Along, Daporijo, Ziro and Tezu:<br />

1) The AAI has submitted DPR for Tezu airport and it has been forwarded to NEC for<br />

funding. In the meantime M / DoNER have included this proposal under Rs 500 Cr package<br />

announced by FM for border areas <strong>of</strong> NER especially for Arunachal Pradesh. As far as some<br />

additional land requirement is concerned, the Deputy Commissioner expressed would<br />

acquire it without much problem.<br />

2) The draft MoU received from MoD for the transfer <strong>of</strong> Passighat airstrip to MoD for<br />

development, operation and maintenance has been returned to MoD after certain<br />

modifications for their acceptance. As suggested in the last <strong>meeting</strong> in <strong>PM</strong>O, the provision<br />

for the use <strong>of</strong> the airport concurrently for civilian purpose has been incorporated in the MoU.<br />

The Ministry <strong>of</strong> Defense Ministry has moved a CCS note in which project <strong>of</strong><br />

operationalization <strong>of</strong> Passighat airport is included. However, MOD has not indicated various<br />

timelines for execution <strong>of</strong> the project.<br />

3) During the <strong>meeting</strong> in <strong>PM</strong>O on 29th July 2008, it was decided that as regards the<br />

airports at Along, Ziro and Daporijo, the MoCA should send a team and in consultation<br />

with the <strong>State</strong> Government arrive at a final view on the suggestions <strong>of</strong> the state Government<br />

that these airports may be refurbished for operating 20-seater aircrafts only, without<br />

involving additional land acquisition. The exercise may be completed within one month.<br />

On the recommendations <strong>of</strong> AAI the <strong>State</strong> Government has conducted the obstacle survey<br />

through Survey <strong>of</strong> India. Member (NE) Planning Commission in the <strong>meeting</strong> chaired by him<br />

for review'<strong>of</strong> this <strong>PM</strong> Package had 'Suggested that a <strong>committee</strong> under the chairmanship <strong>of</strong><br />

Secretary Civil Aviation may be constituted for resolving the question <strong>of</strong> expansion <strong>of</strong> airstrip<br />

and related aircraft availability. The <strong>committee</strong> was to submit report by the third week <strong>of</strong><br />

December. The <strong>meeting</strong> at the <strong>level</strong> <strong>of</strong> Secretary Civil Aviation could not be held in spite <strong>of</strong><br />

follow up by Principal Secretary Coordination. He would further pursue the matter with<br />

MoCA.<br />

iv) Improvement <strong>of</strong> Advanced Landing Grounds (ALGs) at Tuting, Mechuka, Passighat,<br />

Vijaynagar and Walong:<br />

Announcement: "Defence Ministry would improve infrastructure <strong>of</strong> the Advanced Landing<br />

Grounds at Tuting, Mechuka, Passighat, Vijaynagar and Walong",


Status: Draft MoU received from MoD for transfer <strong>of</strong> Tuting, Mechuka, Vijaynagar, Pasighat<br />

to MoD for development, operation and maintenance has been returned to them after due<br />

approval from the <strong>State</strong> Government with certain modifications. Walong ALG is already with<br />

Indian Army.<br />

Provision for use <strong>of</strong> these ALGs concurrently for civilian purpose has been<br />

includedin the Draft MoU. Duringthe <strong>meeting</strong>in <strong>PM</strong>O on 29th July, it was decidedthat<br />

decision on the CCS note, which is under circulation, should be expedited and key time lines<br />

indicated by MoD. Principal Secretary Power and Coordination is pursuing with MoD for<br />

indicating the progress on MoU sent by GoAP and also the status <strong>of</strong> CCS note and approval<br />

<strong>of</strong> projects as well as key timelines for implementation and completion <strong>of</strong> the project by<br />

v) Helicopter Connectivity between Guwahati and Tawang: It has been started from 2<strong>6th</strong><br />

vi)<br />

June 2008. No further action is required.<br />

Two-Lane t~ans-Arunachal Highway from Tawang to Mahadevpur:<br />

Construction <strong>of</strong> a two-lane Trans-Arunachal Highway from Tawang to Mahadevpur, which<br />

would pass~s through Bomdila, Nechiphu, Seppa, Sagalee, Ziro, Daporijo, Along, Passighat,<br />

Roing, Tezu', Mahadevpur, Namchik, Changlang, Khonsa and Kanubari. The total length is<br />

projected to: I be 1829.57 Km. The Arunachal PWD had submitted Pre-Feasibility Report<br />

(PFR) for f169.98 km well within the stipulated time given by the Department <strong>of</strong> Road<br />

Transport & Highways (DORTH), Government <strong>of</strong> India. The alignment has been finalized.<br />

DORTH are required to coordinate with BRO for balance 568 km and with Assam PWD for<br />

92 km <strong>of</strong> stretch. BRO <strong>of</strong>ficers in the <strong>meeting</strong> informed that they have not received anything<br />

in writing about allocation <strong>of</strong> works that are to be done by them. During the <strong>meeting</strong> in <strong>PM</strong>O<br />

on 29thJuly, it was decided that the DoRTH should finalize the CCEA note by August 2008<br />

and the five districts, which otherwise do not fall on Trans-Arunachal Highway, would also be<br />

included in the CCEA note. The <strong>PM</strong>O also directed the <strong>State</strong> Government to finalize the<br />

alignment by December. The alignment has been finalized.<br />

.:. DORTH may indicate the status <strong>of</strong> pre-feasibility report for the portions that fall<br />

within the jurisdiction <strong>of</strong> BRO (568 km) and Assam PWD (92 km).<br />

.:. DORTH are in the process <strong>of</strong> preparation <strong>of</strong> Model Concession Agreement.<br />

.:. DORTH may indicate the pattern <strong>of</strong> funding as well the specific responsibilities <strong>of</strong><br />

specific agencies for implementation <strong>of</strong> various components <strong>of</strong> the entire projects.<br />

DoRTH should indicate to BRO formally about the works which they are to be<br />

assigned so that they may also start planning and working on them immediately.<br />

vii)<br />

.:. DORTH may also indicate the timeline for various activities including actual<br />

implementation and completion <strong>of</strong> projects.<br />

Four-Lane Highways for Itanagar:<br />

Itanagar is to be connected by four-lane highway within four-five years and all District<br />

Headquarters are to be connected with two-lane roads",<br />

Status: During the <strong>meeting</strong> in <strong>PM</strong>O on 29thJuly, it was decided that DoRTH should start the<br />

construction activity since CCEA approval has been accorded on 24TH July 2008. The<br />

Arunachal PWD was required to prepare DPR for the 51.870 km stretch from Banderdewa to


Holongi. APPWD had submitted DPR for 34.69 km but it required some major modification<br />

and therefore it is being revised by them.<br />

Action: DORTH may indicate the status <strong>of</strong> the proposed action and also coordinate with<br />

Assam PWD for the stretch in Assam.<br />

viii) Two-Iane.connectivity for all district headquarters: Out <strong>of</strong> the seven identified roads with<br />

948 km length, only two roads with 150 km length are with PWD. For Pappu Nallah to Yupia<br />

<strong>of</strong> 10 km and for Pasighat-Mariyang~yjiigkiyong section <strong>of</strong> 140 km the state PWD have to<br />

take action for DPR preparation immediately.<br />

Action: DORTH may coordinate with BRO for remaining five important roads with 798 km <strong>of</strong><br />

road length.<br />

ix) 500 small settlements to be connected by roads under Bharat Nirman: Under Bharat<br />

Nirman, 513 small settlements are to be connected by roads. Targets for various activities in<br />

this regard are as under:<br />

REVISED KEY TIME LINES<br />

SI. Survey & Schedulefor Award <strong>of</strong><br />

No. Investigation submission<strong>of</strong> work<br />

DPRs<br />

1 Jul /Se t 08 380.00 70<br />

2 Nov/Dee 08 470.00 95<br />

3 May/June 09 650.00 110<br />

4 Nov/Dee 09 700.00 120<br />

5 Ma /June 10 680.00 118<br />

2880.00 513<br />

Status: RWD has already got DPRs for connecting 26 habitations approved form MoRD.<br />

DPRs for 134 habitations have been submitted to NRRDA (MoRD). They are likely to be<br />

cleared within this month. Survey and investigation for 133 more habitations is under<br />

process and will be ready by April 2009. MoRD had sanctioned RS.3.00 Cr for creation <strong>of</strong><br />

database for rural road planning in border areas. Work on that is under process and the data<br />

from Remote Sensing organization is being obtained. After that digital terrain mapping will be<br />

done using remote sensing data and geo-informatics technique. The CEO, ARRDA.<br />

intimated that work on the first batch <strong>of</strong> villages would be started very soon.<br />

x) Drinking Water Facilities in remote locations: Funds required for providing drinking water<br />

facilities in remote villages and settlements <strong>of</strong> Arunachal Pradesh were to be provided by the<br />

central government.<br />

Status: During the <strong>meeting</strong> in <strong>PM</strong>O on 29th July, the <strong>State</strong> Government was asked to<br />

enhance its execution capability and should also prioritize the schemes for time bound<br />

execution. The state government is taking steps in that direction.<br />

xi) Central Assistance <strong>of</strong> Rs 400 Cr for floods:<br />

In order to stop losses due to floods and bring about improvements in flood affected areas<br />

an assistance <strong>of</strong> 400 Crore rupees was to be provided from the Central Government.


Status: The Planning Commission has issued the sanction order for the first installment <strong>of</strong> Rs.<br />

179 Cr as 90% grant portion and the Ministry <strong>of</strong> Finance, GOI have released the funds to the<br />

<strong>State</strong> Government. Expenditure will be reported by the departments after March 2009.<br />

xii)<br />

Central Assistance <strong>of</strong> the unfinished projects:<br />

For completi~n <strong>of</strong> many unfinished projects in the <strong>State</strong> are these projects an amount <strong>of</strong> Rs.<br />

265 Crore was to be provided by the Central Government.<br />

Status: The :total allocation <strong>of</strong> PWD is Rs. 217.75 Cr to complete 1063 schemes. All these<br />

1063 schemes will be completed by the end <strong>of</strong> this financial year.<br />

The represe~tative <strong>of</strong> T&D briefed that the department would be able to utilize the entire<br />

allocated amount this year and complete the projects within the stipulated time.<br />

NABCONS as the third party <strong>monitoring</strong> agency has been appointed.<br />

xiii)<br />

Release <strong>of</strong> Corpus Fund to RKM:<br />

A corpus <strong>of</strong> Rs. 50 Crore was to be provided to RK Mission Hospital for its strengthening the<br />

by providing.<br />

Status: The RKM Hospital has already received entire RS.50 Cr under this package. No<br />

further action is required.<br />

v~/,,<br />