DEPARTMENT-WISE/DISTRICT-WISE SCHEMATIC STATUS OF PHYSICAL & FINANCIAL ACHIEVEMENT REGARDING COMPLETION OF INCOMPLETE PROJECTS UNDER PM's PACKAGE<br />

Name <strong>of</strong> the District : TAWANG<br />

(Rs. in lakh)<br />

Sl. Name <strong>of</strong> the Project approved by the <strong>Planning</strong> Commission with location District Release <strong>of</strong> fund Expenditure incurred against allocation during Physical<br />

No.<br />

2007-08 2008-09 Total 1st lot 2nd lot 3rd lot Total Achivement<br />

in %age<br />

1 2 3 4 5 6 7 8 9 10<br />

t<br />

11<br />

Remarks<br />

12<br />

1 Roads<br />

Name <strong>of</strong> Circle:- Rupa<br />

Name <strong>of</strong> Division :Tawang<br />

1 ROAD FROM LUMLA DUDUNGHAR (25KM).(Black - topping 0-5 km.) Tawang 5.00 7.02 12.02 2.50 2.50 1.48 6.48 54%<br />

2 JEEPABLE ROAD FROM BTK TO NAMTSERING CONNECTING Tawang 2.15 9.99 12.14 2.00 0.15 3.35 5.50 45%<br />

DUDUNGHAR CO HQ. Slab culvert 10 nos (0-2 km)<br />

3 C/o road from Kungba BRTF road to Namrsering 5.00 km Ph-I(0-1km)(SH: 0 Tawang 3.70 6.98 10.68 2.00 1.70 0.00 3.70 35%<br />

to 0.700km)<br />

4 FC 3.00km to 6.780 km Tawang 6.15 15.02 21.17 3.00 0.00 3.00 14%<br />

5 ROAD FROM RUIDUNG GONPA NEAR KHINMEY VILLAGE TO Tawang 7.05 10.99 18.04 3.00 7.27 10.27 57%<br />

MANJUSHREE VIDYAPITH (2.375 KM). (Widening , culvert, R Wall, B<br />

Wall, Soling, WBM, B Topping and drain)<br />

6 APPROACH ROAD TO BAGHAR AND PHOMANG VILLAGE<br />

Tawang 5.43 0.00 5.43 2.50 1.75 4.25 78%<br />

(4KM).(Formation Cutting (PH-I 0-1km)<br />

7 ZEMITHANG TOWNSHIP ROADS (8.00 KM) [C/o approach road from<br />

BRTF road to new circle HQ at Zemithang township road (F/C 0-2.00 km)]<br />

Tawang 5.00 7.09 12.09 3.00 4.51 7.51 62%<br />

8 APPROACH ROAD FROM KITPI BRTF ROAD TO KITPI GONPA VIA<br />

ATTA CHAKKI AND IB (0.80KM). Soling, WBM and carpeting 0.80km<br />

Tawang 3.80 0.01 3.81 2.00 1.80 0.00 3.80 100%<br />

9 C/o RCC Slab culvert 3 nos and R Wall & B Wall 150m Tawang 1.76 0.00 1.76 0.70 1.05 0.00 1.75 99%<br />

10 ROAD FROM BRTF ROAD POINT TO TAWANG MONASTERY AND<br />

ANI GONPA (4.80KM). Formation cutting 3.92km (SH: Widening 0.72km<br />

and FC 0.735 -3.92km)<br />

Tawang 8.65 9.99 18.64 3.50 4.00 6.69 14.19 76%


11 APPROACH ROAD TO NEW AUNGHAR Road from BRTF road at<br />

Tawang 8.65 13.01 21.66 3.50 3.15 9.52 16.17 75%<br />

Bomdir to New Aunghar village via Khartoot village and Gyangkhar (4.00 km)<br />

(SH: F/C Ch. 1.00-4.00 km)<br />

Name <strong>of</strong> Circle:- Rupa<br />

Name <strong>of</strong> Division :Jang<br />

12 LHOU JANGDA ROAD (35.00 KM) (F/Cutting-5.00 to 10.00 Km) Tawang 60.00 125.92 185.92 40.00 20.00 60.00 120.00 65%<br />

13 Widening 0-5 km (Ph-I:- 0 to 2.50 km) Tawang 9.20 0.00 9.20 5.00 4.20 9.20 100%<br />

14 SH:-Sol, Met- 2.00 Km (PH-I (Sol, Met 0.00 to 0.710 Km) Tawang 6.55 9.02 15.57 6.55 9.02 15.57 100%<br />

15 JANG TOWNSHIP ROAD C/o retaining wall/breast wall on the side <strong>of</strong> Tawang 3.39 0.00 3.39 3.40 0.00 3.40 100%<br />

approach road to PWD colony (on existing Divisional Office) for protecting<br />

land erosion.<br />

16 Re-carpeting <strong>of</strong> Jang Township road & colony road (2.10 km) Tawang 5.05 5.99 11.04 5.05 5.99 11.04 100%<br />

17 MUKTO TOWNSHIP ROAD C/o approach road to General Play Ground at Tawang 2.00 0.00 2.00 2.00 0.00 2.00 100%<br />

Mukto (SH: F/C, Soling, WBM & B/T etc.)<br />

18 C/o approach road to I.B. at Mukto (SH: B/T-600 mtr) Tawang 2.00 0.00 2.00 1.00 0.00 1.00 50%<br />

19 C/o approach road to CO`s residence at Mukto (600 m) (SH:- FC, Sol, WBM, Tawang 3.20 0.00 3.20 1.50 0.00 1.50 47%<br />

BT & S. Drain etc) Phase-II Soling, WBM, & BT-305 m<br />

20 ROAD FROM LHOU BRTF ROAD TO MANYAL (C/o Lhou Jangda road Tawang 5.06 0.00 5.06 5.05 0.00 5.05 100%<br />

(SH: Soling & Metalling - 2.00 km) (Ph-I : 0 to 0.70 Km))<br />

21 C/o road from Lhou BRTF road to Manyal (SH:-Sol, Met- 0 to 3.00 Km) PH-II Tawang 10.30 15.99 26.29 10.30 15.99 26.29 100%<br />

0.700 to 2.120 Km<br />

22 R/Wall & B/Wall in various Chainages 150.00 Mtrs. Tawang 2.15 3.98 6.13 2.15 3.98 6.13 100%<br />

Sub-Total 166.24 241.00 407.24 69.70 74.35 133.75 277.80<br />

Bridges<br />

1 Steel Bailey Bridge Gyangong Nallah (span 25.00 mtr) Tawang 19.00 30.33 49.33 4.93 4.93 10%<br />

Suspension Bridges<br />

1 Construction <strong>of</strong> Suspension bridge over river Nyamjangchu at Zemithang. (80m<br />

Span)<br />

2 C/o 3 nos suspension bridge on Dongshengmang to Kangtang mule track at<br />

Ebabling nallah, Mangnam nallah and Thongleng nallah (span 25m each)<br />

3 C/o Foot S/Bridge on Porter/Mule Track to Bumla (80 mtr) (Leading to<br />

International Border)<br />

Divison: Jang<br />

Tawang 16.15 29.01 45.16 5.00 11.15 28.95 45.10 100%<br />

Tawang 10.00 0.00 10.00 5.00 5.00 0.00 10.00 100%<br />

Tawang 14.00 36.00 50.00 0.05 0.05 0%


4 Improvement <strong>of</strong> Steel S/Bridge on Jang to Sulungthi, Nurunang to Mago, Tawang 16.00 24.00 40.00 16.00 0.00 16.00 40%<br />

Mukto to Nyangsangla & Gongkhar to Bongleng Porter/Mule Track (Total 244<br />

mtr) (Leading to International Border)<br />

Sub-Total 56.15 89.01 145.16 26.00 16.15 29.00 71.15<br />

Porter Track<br />

1 C/o Porter/Mule Track from Tawang - Zimithang BRTF Road to Bumla (40.00 Tawang 6.00 9.00 15.00 6.00 8.60 14.60 97%<br />

Km)<br />

2 Improvement <strong>of</strong> porter track to Mule Track from Mukto to Bongleng (16.00 Tawang 1.05 0.00 1.05 1.05 0.00 1.05 100%<br />

Km)<br />

3 C/o re-aligment <strong>of</strong> porter track from China Bridge to Newmalinga (12 km) Tawang 0.20 0.00 0.20 0.20 0.00 0.20 100%<br />

4 Re-construction Porter/Mule Track from Mukto to Nyangsangla (25.00 Km) Tawang 10.00 0.00 10.00 0.00 4.00 0.00 4.00 40%<br />

Sub-Total 17.25 9.00 26.25 0.00 11.25 8.60 19.85<br />

RIDF<br />

1 C/o ring road at Zemithag (10.860 Km) Tawang 85.40 120.01 205.41 30.00 26.37 149.04 205.41 100%<br />

NLCPR<br />

1 Construction <strong>of</strong> Porter Track from Nuranang to Mago Tawang 4.00 0.00 4.00 4.00 0.00 4.00 100%<br />

2 Construction <strong>of</strong> Link Road from Lhou Nallah to Mukto Circle HQ via Mirba, Tawang 74.10 106.20 180.30 10.00 64.10 10.65 84.75 47%<br />

Gomkelling and Serjong (15.00 Km) in Tawang District.<br />

Sub-Total 78.10 106.20 184.30 10.00 68.10 10.65 88.75<br />

Total (Tawang District) 422.14 595.55 1017.69 135.70 196.22 335.97 667.89<br />

2 ROADS<br />

Rupa Circle<br />

Bomdila Division<br />

1 JAMIRI – BURAGAON ROAD ( 34 KM ).( Impvt. <strong>of</strong> approach road to West Kameng 2.81 0.00 2.81 0.00 0%<br />

Jamiri IB (400m) SH: WBM, B/T & Culverts).<br />

2 BURAGAON - THRIZINO ROAD. [Formation cutting 0 - 5 Km (Buragaon West Kameng 5.00 10.01 15.01 0.00 0%<br />

end)]<br />

3 DIRANG - SANGTI ROAD, (10 KM) B/Topping, (0 - 5 Km.) West Kameng 8.00 9.98 17.98 5.00 5.00 28%<br />

4 Soling & WBM (5 to 10 Km.) West Kameng 8.00 22.00 30.00 30.00 0.00 0.00 30.00 100%<br />

5 C/o Protection wall for protection <strong>of</strong> rad from adjacent Nallah at Ch-9.00 to West Kameng 2.40 3.60 6.00 0.00 0%<br />

10.00 Km.<br />

6 NYGKMADUNG - GOMPOCHER ROAD(18.02 KM.) WBM, (13.10 - West Kameng 10.70 17.00 27.70 0.00 0%<br />

18.02 Km.)<br />

7 Culvert, R & B/Wall, Dt. 13.10 -18.02 Km. West Kameng 8.20 5.01 13.21 0.00 0%


8 GACHOM - MORSHING ROAD (27 KM.) R/Wall, B/Wall & Culverts. (0 - West Kameng 5.90 9.97 15.87 0.00 0%<br />

5 Km.)<br />

9 Formation cutting 8 to 13 Km. West Kameng 10.50 7.99 18.49 18.49 18.49 100%<br />

APPROACH ROAD TO ZIMTHUNG HELIPAD, (6.00 KM.)<br />

West Kameng<br />

10 Formation Cutting 2.50 Km. to 5.00 Km. West Kameng 12.05 13.99 26.04 26.04 26.04 100%<br />

11 Widening, Culvert, R/Wall & Drains West Kameng 5.05 8.00 13.05 12.53 12.53 96%<br />

BOMDILA TOWNSHIP ROAD.<br />

West Kameng<br />

12 Improvement road from GRL road to Circuit House via Shanti Deva Hostel West Kameng 6.70 8.01 14.71 4.00 4.00 27%<br />

(1.60 km) Sh: Sol. & WBM)<br />

DIRANG TOWNSHIP ROAD.<br />

West Kameng<br />

13 WBM, Re-carpeting & Culvert (Ph-I : WBM-III, Re-Carpeting-0.50 km & West Kameng 2.75 5.98 8.73 8.38 8.38 96%<br />

S/Culvert-1 No span 1.50 mtr)<br />

14 Metalling and Black Topping (4.00 km) (Ph-I : Met & B/T-0.95 km) West Kameng 5.00 7.00 12.00 4.00 4.00 33%<br />

RUPA TOWNSHIP ROAD.<br />

West Kameng<br />

15 C/O R/Wall & Drain on approach to Gompa road 400 mtr. near the Gompa West Kameng 3.21 0.00 3.21 3.08 3.08 96%<br />

(Creation <strong>of</strong> parking).<br />

16 C/O R/Wall & B/Wall on A/road to Rural sports complex from Rupa Kalaktang West Kameng 4.65 0.00 4.65 4.46 4.46 96%<br />

road (500 mtrs.)<br />

BHALUKPONG TOWNSHIP ROAD.<br />

West Kameng<br />

17 Bhalukpong township road (Ph. - II), SH: Sol., WBM & B/T. West Kameng 4.53 0.00 4.53 2.00 2.00 44%<br />

18 Formation cutting at Tippi (2.00 Km.) West Kameng 2.30 3.00 5.30 0.00 0%<br />

19 Improvement <strong>of</strong> approach road from BRTF road to Bhalukpong (SH:- West Kameng 4.00 5.00 9.00 9.00 0.00 0.00 9.00 100%<br />

Widening, Soling, Metalling & S/Drain)<br />

20 Re-carpeting <strong>of</strong> approach road to Circuit House & Guest House at Parvatinagar West Kameng 2.00 2.00 4.00 3.84 3.84 96%<br />

(SH: WBM & Re-carpeting - 0.440 km)<br />

21 LINK ROAD FROM BRTF ROAD TO PROPOSED DONYIPOLO West Kameng 10.00 10.33 20.33 0.00 0%<br />

MISSION SCHOOL AT TIPPI.[F/C = 7 Km. (actual length = 2.94 Km.)]<br />

22 ROAD FROM SAPPER CAMP TO LUBRANG (21 KM.) [Formation West Kameng 9.00 10.02 19.02 0.00 0%<br />

cutting 0 to 2 Km.]<br />

Sub - Total 132.75 158.89 291.64 130.82 0.00 0.00 130.82<br />

Rupa Circle<br />

Kalaktang Division<br />

SHERGAON - DOIMARA ROAD (55 KM.)<br />

23 C/oRCC Slab culvert <strong>of</strong> 5 Nos <strong>of</strong> 1 mtr. Span and 1 no. <strong>of</strong> 3 mtr span & R/Wall West Kameng 5.40 3.98 9.38 7.00 2.38 9.38 100%<br />

& B/wall at ch.1.70 to 7.50 km<br />

24 BALEMU - BHAIRABKUND ROAD (3 KM.) [Soling and WBM.] West Kameng 4.00 0.00 4.00 4.00 0.00 0.00 4.00 100%


KALAKTANG TOWNSHIP ROAD<br />

West Kameng<br />

25 C/o approach road to Kalaktang helipad (SH :- WBM & BT - 2.42 km) West Kameng 8.30 9.98 18.28 2.00 8.02 10.02 55%<br />

26 Extension <strong>of</strong> Kalaktang Township road upto new Gompa. (SH :- FC & Sol. - West Kameng 5.50 7.99 13.49 5.50 7.69 13.19 98%<br />

0.50 km)<br />

27 Improvement <strong>of</strong> Drainage system <strong>of</strong> Police Colony …. Hostel & ALC colony at West Kameng 2.45 3.00 5.45 0.50 7.69 8.19 150%<br />

Kalaktang (SH:- S/Culvert-1 No <strong>of</strong> 4 Mtr Span, Pwall-20m, CC Drain-250m)<br />

(PH-I- S/Culvert-1 No, CC Drain 100 m).<br />

BALEMU TOWNSHIP ROAD.<br />

28 C/o Balemu to upper Balemu vill upto Gompa.(1.50 km) (SH :- Cross drainage West Kameng 6.50 0.00 6.50 6.50 0.00 0.00 6.50 100%<br />

I/c side drain)<br />

29 C/o approach road to C.O.Office complex at Balemu (200 Mtrs) (SH: Soling, West Kameng 2.00 0.00 2.00 2.00 0.00 0.00 2.00 100%<br />

WBM, B/T & P/Drain).<br />

JIGAON TOWNSHIP ROAD<br />

West Kameng<br />

30 Link road to Upper Jigaon New village (1.00 km.) (SH : Soling, Metalling, West Kameng 5.50 0.00 5.50 1.00 4.50 5.50 100%<br />

carpeting i/c CC drain)<br />

31 C/o Approach road from upper Jigaon to school via Gompa & IB. (SH : West Kameng 2.00 0.00 2.00 2.00 0.00 0.00 2.00 100%<br />

Embankment WBM & B/T)<br />

SHERGAON TOWNSHIP ROADS<br />

32 Impvt. <strong>of</strong> approach road to state horti- culture farm at shergaon (RCC slab West Kameng 7.20 0.00 7.20 0.00 7.20 0.00 7.20 100%<br />

culvert 1 mtr. Span & soling, metaling & B/T 1.20km<br />

33 C/o approach road to C.O. <strong>of</strong>fice at Shergaon (1.00 km) SH :- Soling & WBM West Kameng 4.75 0.00 4.75 1.00 3.60 4.60 97%<br />

LINK ROAD FROM RUPA-KALAKTANG ROAD TO NEW JIGAON-<br />

LENGKOKHE-SINGOMURONG-GONJ-REKNYUPAMS-<br />

MUCHAKSING VILLAGES (15 KM.)<br />

34 C/o RCC Slab Culvert between 1.15km to 4.00 km. (S/C 1 m 2 Nos & 2 mtr 2 West Kameng 3.15 2.98 6.13 3.00 3.13 6.13 100%<br />

Nos)<br />

35 Soling 0 - 2 km. 2.00 3.99 5.99 1.00 4.38 5.38 90%<br />

LINK ROAD FROM KALAKTANG-SIKARIDENGA NEC ROAD TO<br />

DENZI-LIPHAKPU-BROKPLANCHEEN-WARANGPAM-SAMDRUNG<br />

VILLAGE (25 KM.)<br />

36 C/o RCC culvert 6 mtr span) on chainage 7.90 km on Denzi-Liphakpu road. West Kameng 2.00 3.98 5.98 0.00 0.00 0%<br />

37 APPROACH ROAD TO LAZULA GOMPA AT MORSHING (12 KM.) West Kameng<br />

(FC - 5.10 - 8.00 Km.)<br />

37 ROAD FROM SANGLEM TO MORSHING VIA DONGKEO (5 KM.) West Kameng 3.05 4.00 7.05 0.00 3.00 4.05 7.05 100%<br />

(Formation cutting, 0 - 3.00 km.)<br />

38 DENZI TO LIPHAKPOO (1.00 KM) (Formation Cutting, 1.00 km) West Kameng 4.70 5.01 9.71 2.50 7.21 9.71 100%


39 RUPA-SHERGAON ROAD TO NEW CHILLIPAM (5.00 KM)<br />

West Kameng 3.00 3.04 6.04 2.50 2.83 5.33 88%<br />

(Formation Cutting, 1.00 km)<br />

40 MARGING-LAZULA ROAD (Soling, Metalling & Carpeting) West Kameng 5.40 9.01 14.41 5.40 9.01 14.41 100%<br />

41 Approch road to Lazula Gompa at Morshing West Kameng 2.05 0.00 2.05 0.00 2.05 0.00 2.05 100%<br />

Sub - Total 78.95 56.96 135.91 36.40 21.75 64.49 122.64<br />

Bridges<br />

RB/05 DIRANG - SANGTI ROAD.<br />

1 C/O Steel Bridge at Khonpather (Span = 40 mtr.) West Kameng 10.75 17.98 28.73 28.73 28.73 100%<br />

RB/09 MUNNA - THUNGRI ROAD<br />

West Kameng<br />

2 Protection <strong>of</strong> Bridge over river Dirang at Munna (SH: Replacement <strong>of</strong> Timber West Kameng 2.70 0.18 2.88 2.68 2.68 93%<br />

Decking by Steel Decking)<br />

RK/02 KALAKTANG-BOHA ROAD 15.50 KM<br />

West Kameng<br />

3 C/o B/Bridge at Ch. 2.145 km on Kalaktang -Boha road. (Span - 22.30mtr) West Kameng 4.00 6.00 10.00 3.00 1.62 4.62 46%<br />

Sub - Total 17.45 24.16 41.61 34.41 0.00 1.62 36.03<br />

Foot Suspension bridges<br />

FOOT SUSPENSION BRIDGE UNDER BOMDILA DIVISION.<br />

1 C/O S/Bridge over Dinik Kho river connecting Thongre to Homthing Bow (L- West Kameng 5.10 7.01 12.11 0.00 0%<br />

70 mtrs.)<br />

2 C/O Foot S/Bridge over river Bichom on Buragaon - Thrizinio P/Tracks (Span West Kameng 6.95 9.01 15.96 0.00 0%<br />

100 mtr)<br />

3 C/O S/Bridge over river Diyingkho river (Lui village) (Span = 50 mtr.) West Kameng 6.80 8.01 14.81 0.00 0%<br />

4 C/O Foot Suspension bridge over river Dinikkho & Mimbacher P/Track. West Kameng 4.00 6.00 10.00 0.00 0%<br />

FOOT SUSPENSION BRIDGES UNDER KALAKTANG DIVISION West Kameng<br />

5 Special repair <strong>of</strong> foot suspension bridge at Betcheling (60 m) West Kameng 9.45 0.02 9.47 9.47 0.00 0.00 9.47 100%<br />

6 C/o Foot Suspension bridge over river Kurtallam (Span-40 m) West Kameng 6.00 7.00 13.00 6.00 3.78 9.78 75%<br />

Sub - Total 38.30 37.05 75.35 9.47 6.00 3.78 19.25<br />

Porter Track<br />

PORTER/MULE TRACKS UNDER BOMDILA DIVISION.<br />

1 P/Track from Thrizino to Janaching Challang (20 Km.) West Kameng 2.64 0.00 2.64 2.64 2.64 100%<br />

2 P/Track from Thungri to mathow, Dibbin under Nafra circle 40 Km. West Kameng 4.57 0.00 4.57 4.57 4.57 100%<br />

3 C/O P/Track from Nafra to Dibrick covering Nakhu, Nachibun & Najang West Kameng 0.24 0.00 0.24 0.24 0.24 100%<br />

village (40 Km.) (Ph. - I - 27.50 Km)<br />

Sub - Total 7.45 0.00 7.45 7.45 0.00 0.00 7.45


NLCPR<br />

1 Improvement <strong>of</strong> Palizi-Thrizino Road (17.00 Km) West Kameng 29.80 34.99 64.79 64.79 64.79 100%<br />

2 Construction <strong>of</strong> Road from Nafra to Nakhu and Nachiban in West Kameng West Kameng 35.00 40.40 75.40 75.40 75.40 100%<br />

District (11.00 Km)<br />

3 Improvement <strong>of</strong> Porter Track from Tungri to Mago (70.00 Km) West Kameng 31.06 0.00 31.06 29.82 29.82 96%<br />

Sub - Total 95.86 75.39 171.25 170.01 0.00 0.00 170.01<br />

RIDF & CRF<br />

1 DIRANG TAWANG BRO ROAD TO SANGTI-KHALIBOK ROAD<br />

JUNCTION VIA KHASSO (14.50 Km)<br />

West Kameng 47.85 0.00 47.85 15.00 15.00 31%<br />

2 C/o road from Dirang Dzong to Namthung via Sanglam (19.215 Km) in West West Kameng 194.98 0.00 194.98 175.00 175.00 90%<br />

Kameng District under C.R.F.(E&I)<br />

Sub - Total 242.83 0.00 242.83 190.00 0.00 0.00 190.00<br />

3 Roads<br />

Grand Total (PWD West Kameng ) 613.59 352.45 966.04 578.56 27.75 69.89 676.20<br />

Name <strong>of</strong> Circle :- Rupa Circle<br />

Name <strong>of</strong> Division : Bameng Division<br />

1<br />

PACHI LOZI DIPU PIPU ROAD (35KM). (Restoration <strong>of</strong> Pachin-Lozi-Dipu- East Kameng<br />

Pipu road upto 26.00 Km)<br />

6.65 10.00 16.65 6.50 10.15 0.00 16.65 100%<br />

PAKKE BAMENG LIYAK LADA ROAD (58KM.)<br />

East Kameng<br />

2 Restoration <strong>of</strong> Pakke-Bameng Road (SH: Restoration) East Kameng 12.00 27.70 39.70 25.00 5.00 30.00 76%<br />

3 Slip clearence widening and Side drain between 12.00 Km to 30.00 Km East Kameng 5.23 0.00 5.23 5.23 0.00 0.00 5.23 100%<br />

4 Formation cutting 12-27 km. East Kameng 5.00 0.00 5.00 0.00 0%<br />

CHAYANGTAJO TOWNSHIP ROAD<br />

East Kameng<br />

5<br />

Improvement <strong>of</strong> Approach road from Helipad to New Circuit House at East Kameng<br />

Chayangtajo 400 Mtr. (SH: Widening, Soling, Metalling, R/Wall & B/Wall<br />

2.44 0.00 2.44 2.44 2.44 100%<br />

6<br />

C/o Step from Chayangtajo Township road at 80.40 km to Tache colony via East Kameng<br />

Konlang Nyibiung (700 mtr)<br />

1.50 1.80 3.30 2.13 2.13 65%<br />

7<br />

Improvement <strong>of</strong> approch road from Seppa-Chayangtajo road from Nari Camp to<br />

East Kameng<br />

Nari ME School (1.00 Km)<br />

4.00 4.93 8.93 4.00 4.93 8.93 100%<br />

8 Improvement <strong>of</strong> C/tajo Township road (SH: Sol. WBM, BT 1.2 Km) East Kameng 4.00 4.00 8.00 4.00 3.60 7.60 95%


BAMENG TOWNSHIP ROAD.<br />

East Kameng<br />

9 Soling metalling & BT joining point Myura RWD road/PWD road to Chanmari East Kameng<br />

i/c ring road 3.00km.<br />

3.45 5.01 8.46 2.00 3.00 5.00 59%<br />

C/o road from Pakke-Bameng road to PWD Division <strong>of</strong>fice 1.50 Km (SH:- F/C - East Kameng<br />

10<br />

1.50 Km)<br />

3.10 0.02 3.12 1.00 2.00 3.00 96%<br />

Improvement <strong>of</strong> Approach road to I.B. at Bameng (SH: Raising <strong>of</strong> gradient and East Kameng<br />

11<br />

geometrics 200 mtr, Culverts 4 mtr span - 1 No.<br />

2.11 0.02 2.13 2.13 2.13 100%<br />

C/o R/Wall to protect IB & PWD Sub-Division <strong>of</strong>fice at Bameng (SH:-R/Wall- East Kameng<br />

12<br />

70 m)<br />

2.00 4.01 6.01 6.01 0.00 0.00 6.01 100%<br />

ROAD FROM MARJINGLA BRIDGE POINT TO SEPPA-<br />

East Kameng<br />

13 CHAYANGTAJO ROAD TO SAWA CIRCLE HQ. 25.00 KM. (Formation<br />

5.10 8.00 13.10 0.50 1.00 11.05 12.55 96%<br />

cutting 0-2.00 km.)<br />

14 ROAD FROM KHENEWA TO MARJINGLA (6.00KM) (Widening 0- East Kameng<br />

6.00km)<br />

2.99 0.00 2.99 2.99 2.99 100%<br />

PIPU TOWNSHIP ROAD<br />

East Kameng<br />

15 C/o CC steps from Ruchi Lamgu to Gyawepurian 1.50 Km East Kameng 2.00 3.02 5.02 4.82 4.82 96%<br />

C/o Step from Med Sub-Centre to PWD I.B. via Helipad at Sewa C.O. H.Q. East Kameng<br />

16<br />

(0.50 km)<br />

2.00 2.24 4.24 4.24 4.24 100%<br />

CONSTRUCATION OF APPROACH ROAD FROM SEPPA-<br />

East Kameng<br />

17 CHAYANGTAJO ROAD TO BRIDGE POINT AT MARJINGLA (0.50<br />

2.85 4.98 7.83 3.00 4.83 7.83 100%<br />

KM) (SH:- F/C , Solling, R&B Wall.)<br />

Total 66.42 75.73 142.15 66.17 30.91 24.47 121.55 86%<br />

Name <strong>of</strong> Circle :- Rupa Circle<br />

Name <strong>of</strong> Division :- Seppa PWD Division.<br />

ROAD FROM 84.00 KM POINT OF SEPPA-SAGALEE BRTF ROAD TO East Kameng<br />

PAKKE-KESSANG (14.70 KM)<br />

18 Re-alignment <strong>of</strong> road from Zero to 1.20 km (SH: F/C - 1.00 km) East Kameng 2.32 0.00 2.32 0.00 2.32 0.00 2.32 100%<br />

Culverts-3 Nos. <strong>of</strong> 2.00 mtr span(SH: Culverts <strong>of</strong> 2.00 m span 3 Nos. & East Kameng<br />

19<br />

Protection Work 388.80 mtrs)<br />

2.00 2.95 4.95 0.00 0%<br />

ROAD FROM BANA TO RICHIKRONG VIA KAYA VALLEY<br />

East Kameng<br />

20<br />

40.00KM.C/O approach road from BRTF road to Wessang <strong>of</strong>fice complex at<br />

Seppa ( SH:- FC, WBM, BT & P/Drain=1.50 km)(SH:- I) F/C-1.00km II)<br />

3.70 0.00 3.70 0.00 3.70 0.00 3.70 100%<br />

Soling, metalling & BT-1.00km )<br />

SEPPA TOWNSHIP ROAD (15.72 KM)<br />

East Kameng<br />

Construction <strong>of</strong> R/Wall at River bank <strong>of</strong> Kameng river near back side <strong>of</strong> Seppa East Kameng<br />

21<br />

Bazar line in between Tani L<strong>of</strong>fa and Saka Yangda.<br />

2.95 3.02 5.97 5.94 5.97 11.91 199%


22 Special repair to roads at New Seppa East Kameng 3.63 0.00 3.63 3.63 3.63 7.26 200%<br />

23 C/o RCC Retaining Wall at Bazar line on PWD Road on A+1 land at Seppa East Kameng 1.50 2.00 3.50 3.50 3.50 7.00 200%<br />

SEIJOSA TOWNSHIP ROAD (Improvement <strong>of</strong> approach road to Dibru East Kameng<br />

24 bridge (SH: Widening, Soling, Metalling & B/Topping - 1.20 km) (Ph-I :<br />

1.65 2.99 4.64 0.00 4.64 0.00 4.64 100%<br />

Widening)<br />

ROAD FROM BRTF TO PASSA VIA CHAMGAON, DOLIE,<br />

East Kameng<br />

25<br />

DEDARSO, GUMTE VILLAGE(20.00KM) "0" POINT AT RILLOH<br />

[Formation Cutting 3.00-9.00 km (Ph-II) (SH: F/C-6.00 km) (FROM Rilloh<br />

18.00 26.14 44.14 0.00 44.14 0.00 44.14 100%<br />

end)]<br />

ROAD FROM LUMDUNG VILLAGE TO 64.00KM POINT OF SEPPA East Kameng<br />

26<br />

SAGALEE ROAD ( 22.47KM) [C/O washed out culvert-11 nos from 0.00 to<br />

22.774 km (SH:- i) Slab culvert-4 nos <strong>of</strong> 5 mtr span ii) Slab culvert-7 Nos <strong>of</strong> 2<br />

8.00 13.36 21.36 0.00 7.28 7.28 34%<br />

mtr span)]<br />

ROAD FROM BRTF TO PASSA VIA CHAMGAON, DOLIE,<br />

East Kameng<br />

27 DEDARSO, GUMTE VILLAGE(20.00KM) "0" POINT AT PASSA<br />

2.00 2.00 4.00 0.00 4.00 0.00 4.00 100%<br />

[Formation cutting - 0 to 3.00km (SH:- F/C-3.00km)]<br />

APPROACH ROAD FROM I.B. TO BRTF POINT AT RILLOH (1.00 East Kameng<br />

28<br />

KM) [Earth Filling, Soling and Slab Culvert 1 mtr span 3 nos]<br />

3.00 3.71 6.71 0.00 2.01 4.70 6.71 100%<br />

APPROACH ROAD TO ANNEY DONYI COLONY NEAR POST East Kameng<br />

29 OFFICE AT SEPPA(150.00 MTR) [Formation cutting & CC pavement<br />

2.50 0.00 2.50 2.50 2.50 5.00 200%<br />

150.00m.]<br />

IMPROVEMENT OF MEDICAL COLONY ROAD AT SEPPA [R/Wall East Kameng<br />

30<br />

near govt. residential quarters (R/W 65.00m).]<br />

2.75 0.00 2.75 2.75 2.75 5.50 200%<br />

Sub- Total (13 Nos Schemes) :- 54.00 56.17 110.17 18.32 86.44 4.70 109.46 99%<br />

Bridges<br />

Name <strong>of</strong> Circle : Rupa Circle<br />

Name <strong>of</strong> Division : Bameng Division<br />

PACHI LOZI DIPU PIPU ROAD (35KM).<br />

1 C/o B/bridge over river Pachi at Ch. 26.00 km. (Span 30mtrs. ) East Kameng 10.00 15.01 25.01 40.01 40.01 160%<br />

East Kameng<br />

SEIJOSA TOWNSHIP ROAD<br />

East Kameng<br />

Re-construction <strong>of</strong> damaged wing wall, abutment <strong>of</strong> Bailey bridge over RWD East Kameng<br />

2 nallah, Medical Nallah, Firing Nallah and A2 Nallah (SH:- W/Wall - 4 Nos &<br />

6.10 10.01 16.11 15.99 16.11 32.10 199%<br />

Abutment -2 Nos)<br />

ROAD FROM LUMDUNG TO 64.00 KM POINT OF SEPPA-SAGALEE East Kameng<br />

BRTF ROAD (23.00 KM)


3<br />

C/o bridge over Papu river at Ch. 17.20 Km (span 55.00 mtr) (SH: (i) Steel East Kameng<br />

bridge 1 No. <strong>of</strong> span 55.00 mtr (220 ft) (ii) Steel Decking, (iii) RRM in<br />

4.00 5.00 9.00 8.68 9.00 17.68 196%<br />

foundation (1:6) (iv) W/Wall-12.56 mtr)<br />

Sub-Total 20.10 30.02 50.12 64.68 25.11 0.00 89.79 179%<br />

Foot Suspension Bridges<br />

Name <strong>of</strong> Circle : Rupa<br />

Name <strong>of</strong> Division : Bameng<br />

SUSPENSION BRIDGE UNDER BAMENG DIVISION.<br />

1 C/O Foot suspension bridge over Pachuk in between Lapung village & Effa East Kameng<br />

village (Span 110 mtr.)<br />

9.60 0.01 9.61 0.00 0.00 0%<br />

2 Improvement <strong>of</strong> 2 nos suspension bridge over river Wason & Wada East Kameng 0.32 0.00 0.32 0.32 0.00 0.00 0.32 100%<br />

3 C/o WRSB over river Wapin river in between Lada and Drakshi (Span 75mtrs.)<br />

East Kameng<br />

8.40 5.02 13.42 9.88 9.88 74%<br />

4<br />

5<br />

6<br />

7<br />

C/o RCC steel tower bridge at 30.00 km from Bameng over Pachuk river at<br />

Lada Porter track to connect Lada CO Admn. HQ (span 115mtrs.)<br />

C/O FSB over river Pachuk in between Bameng H.Q to Effa village (Span 115<br />

Mtrs)<br />

Special maintenacne <strong>of</strong> Suspension bridge ovr river Pachi at Dafi on Daffi to<br />

Pipu Porter Track<br />

C/o Suspension bridge over Kameng river connecting Nampe Lamio to Sario<br />

village (120 Mtr)<br />

8 C/o Foot Suspension bridge over river Kameng at Margingla (span 120 Mtrs)<br />

East Kameng<br />

East Kameng<br />

East Kameng<br />

East Kameng<br />

East Kameng<br />

13.20 20.01 33.21 12.00 21.21 0.00 33.21 100%<br />

0.80 0.01 0.81 0.81 0.00 0.00 0.81 100%<br />

0.70 0.00 0.70 0.70 0.00 0.00 0.70 100%<br />

10.25 19.01 29.26 10.00 10.85 0.00 20.85 71%<br />

10.10 21.03 31.13 12.00 17.88 29.88 96%<br />

9<br />

Suspension Bridge over Kameng River to connect Khenewa Circle and Sewa East Kameng<br />

Circle at Bengde, under Chayangtajo.<br />

12.00 18.00 30.00 12.00 16.80 28.80 96%<br />

Sub- Total 65.37 83.09 148.46 47.83 32.06 44.56 124.45 84%<br />

FOOT SUSPENSION BRIDGES UNDER SEPPA DIVISION<br />

C/O two wheeler Suspension bridge over river Kameng in between T-III colony<br />

East Kameng<br />

10<br />

and poultry farm at New Seppa. (Span-150mtr) I/c Survey & Investigation.<br />

(SH:- Suspension bridge = 1no. <strong>of</strong> span - 150.00 mtrs (i) Abut. = 2nos, (ii)<br />

anchor block - 4nos., (iii) S/structure with Steel decking, (iv) S & I.<br />

8.95 11.01 19.96 19.96 19.96 0.00 39.92 200%<br />

11<br />

C/o Wire rope suspension bridge with steel decking over river Bichom in<br />

between Bana 2.00 km. Point to Pachung village (Span 120mtrs).<br />

East Kameng<br />

6.95 0.00 6.95 0.00 6.95 0.00 6.95 100%


C/o wire rope Suspension bridge over river Kade in between Bana and Silla East Kameng<br />

12<br />

(span 110 mtrs).<br />

C/o S/bridge over river Kajung and Kalong river(span 100 ft) each between East Kameng<br />

13<br />

Pakoti and Hambapinda (span 40 mtrs).<br />

C/o F.S.B. over river Kameng in between Pampoli to Kotta village (span 160 East Kameng<br />

14<br />

mtr).<br />

C/o F.S.B. over river Passo in between Dissing Passo to Biloso Middle School East Kameng<br />

15<br />

(span 100 mtr)<br />

C/o. Foot suspension bridge over river Pakoti to connect L<strong>of</strong>a and Pakoti village<br />

East Kameng<br />

16<br />

(span 60.00 mtrs)<br />

East Kameng<br />

17 C/o. foot suspension bridge over river Passo at Tapiaso (span - 120.00 mtrs).<br />

0.36 0.00 0.36 0.30 0.36 0.00 0.66 183%<br />

7.38 0.00 7.38 7.38 7.38 0.00 14.76 200%<br />

18.60 45.00 63.60 30.86 26.27 6.47 63.60 100%<br />

12.20 40.00 52.20 15.00 0.58 15.58 30%<br />

7.35 11.01 18.36 8.00 9.00 17.00 93%<br />

7.45 9.00 16.45 2.00 0.00 6.32 8.32 51%<br />

18 C/o. foot suspension bridge over river Papu (span 60.00 mtrs). East Kameng 7.20 11.02 18.22 8.00 5.00 13.00 71%<br />

19 C/o. foot suspension bridge over river Dission at Dikalmukh (span 120.00 mtrs)<br />

East Kameng<br />

12.20 20.01 32.21 7.71 8.00 8.34 24.05 75%<br />

20<br />

C/o. foot suspension bridge in between Dission and Dikalmukh (span 60.00 East Kameng<br />

Mtrs) at Dikalmukh.<br />

8.00 10.08 18.08 10.34 0.00 10.34 57%<br />

Sub- Total 96.64 157.13 253.77 68.21 110.26 35.71 214.18 84%<br />

CIRCLE : RUPA<br />

DIVISION : BAMENG<br />

PORTER TRACK<br />

1 C/O Porter track from Lada to Bijoy (30KM). 0.13 0.00 0.13 0.13 0.00 0.00 0.13 100%<br />

2<br />

C/o Mule Track from Pachi point to Pipu C.O. HQ via Fachang, Tabri, East Kameng<br />

Lachung, Bakor and Rigom village (40.00 km)<br />

6.00 8.73 14.73 5.00 9.73 0.00 14.73 100%<br />

3 C/O Porter track from Chayangtajo to Nyapin (25.00 Km) East Kameng 5.55 5.98 11.53 5.00 6.53 0.00 11.53 100%<br />

4<br />

C/o Porter track from Wai to Rawe via Wallong, Solunbg, Jomoh Village (35.00<br />

East Kameng<br />

Km).<br />

7.49 10.00 17.49 10.00 7.49 0.00 17.49 100%<br />

5<br />

C/o Porter Track from Pipu to Jote Cheda via Lasak Cheda, Wotte Cheda, East Kameng<br />

Sangre Sulung, Tare Sulung (30.00 Km)<br />

6.30 9.01 15.31 5.00 10.31 0.00 15.31 100%<br />

6<br />

C/o Porter Track from Pipu to Doka via Paniya Sulung, Ladu Sulung (20.00 East Kameng<br />

Km)<br />

4.00 6.12 10.12 5.00 5.12 0.00 10.12 100%<br />

CIRCLE : RUPA<br />

East Kameng<br />

DIVISION : SEPPA<br />

East Kameng<br />

7 C/o Mule Track from Chambang to Liyak Dijungania village (30.00 km) East Kameng 3.70 4.01 7.71 0.00 7.71 0.00 7.71 100%<br />

0.00


NLCPR<br />

NAME OF CIRCLE : RUPA CIRCLE<br />

NAME OF DIVISION : BAMENG DIVISION<br />

Sub- Total 33.17 43.85 77.02 30.13 46.89 0.00 77.02 100%<br />

East Kameng<br />

East Kameng<br />

1 Construction <strong>of</strong> road from Pakke to Wai (18.00 Km) East Kameng 20.25 75.17 95.42 130.42 130.42 137%<br />

2 Construction <strong>of</strong> Road from Dipulamgu Bridge point to Pipu (14.00 Km) East Kameng 23.20 14.02 37.22 57.22 57.22 154%<br />

3 Construction <strong>of</strong> Road from Bameng to Lada (40.00 Km) East Kameng 59.27 20.00 79.27 40.00 39.27 0.00 79.27 100%<br />

Sub- Total 102.72 109.19 211.91 227.64 39.27 0.00 266.91 126%<br />

RIDF & CRF<br />

1<br />

2<br />

ROAD FROM PWD I.B. TO BALI IN SEIJOSA (14.60 KM) IN EAST East Kameng<br />

100.45 152.02 252.47 51.18 51.18 193.60 295.96 117%<br />

KAMENG DISTRICT<br />

ROAD FROM SEPPA-CHAYANGTAJO TO BAMENG (15.00 KM) IN East Kameng 50.89<br />

0.00 50.89 70.89 70.89 139%<br />

EAST KAMENG DISTRICT<br />

Sub- Total 151.34 152.02 303.36 122.07 51.18 193.60 366.85 121%<br />

NEC<br />

Name <strong>of</strong> Circle : RUPA CIRCLE<br />

East Kameng<br />

Name <strong>of</strong> Division : Bameng Division<br />

East Kameng<br />

1 Seppa-Chayangtajo Road (Ph-I : 81.00 Km) East Kameng 165.85 429.25 595.10 0.00 0%<br />

Grand Total (PWD : East Kameng) 755.61 1136.45 1892.06 645.05 422.12 303.04 1370.21 8.79<br />

4 ROADS<br />

CAPITAL COMPLEX ROAD UNDER CD-A<br />

1 Improvement <strong>of</strong> road from CD-B <strong>of</strong>fice to Sinki View (SH: R/Wall & Slip Papumpare 1.01 0.00 1.01 0.97 0.97 96%<br />

Clearence).<br />

2 C/o R/Wall behind S.A. Office at Itanagar. Papumpare 1.00 1.56 2.56 2.56 2.56 100%<br />

3 C/o Passing Places and Widening <strong>of</strong> approaches <strong>of</strong> road to staff <strong>of</strong> H.C.M. and Papumpare 1.00 0.00 1.00 0.50 0.51 1.01 101%<br />

Hon'ble Minister Bunglow No 15 & 16 at Nitivihar.<br />

4 C/o Road from N/Vihar to Division "B" (SH: RCC S/Culvert-1 No & H/Pipe<br />

Culvert-1 No at Ch. 0.974 Km).<br />

Papumpare 7.25 0.01 7.26 7.26 6.33 13.59 187%


5 C/o slab culvert i/c approach road & R/Wall on road from Nithivihar to Papumpare 1.90 2.00 3.90 3.90 3.90 100%<br />

'F'Sector near Primary school Nithivihar(Span 3 Mtr)<br />

6 C/o Foot path in F & G Sector,Itanagar(1000 Mtr) Papumpare 1.49 0.00 1.49 1.49 1.49 100%<br />

7 Impvt.<strong>of</strong> road Mowb-I & Mowb-II,1.50 Km(SG: S/Cul-1 No & S/D-0.50 Km) Papumpare 1.00 1.52 2.52 2.50 2.50 99%<br />

8 Extension <strong>of</strong> parking area and protection <strong>of</strong> appraoch road & CC step at Papumpare 2.05 4.01 6.06 6.06 6.06 100%<br />

S/Vihar<br />

9 Formation cutting in Passing place on road leading to '0' point to Mowb-II Papumpare 1.80 4.52 6.32 6.04 6.04 96%<br />

panchali<br />

10 C/o RCC R/wall to protect Division- B & PHED Office (R/wall= 250 Mtrs) Papumpare 10.00 8.94 18.94 18.94 18.94 100%<br />

11 Extension <strong>of</strong> road from Lobi Primary School to Lobi Colony( 300 Mtrs) Papumpare 1.00 0.01 1.01 1.01 1.01 100%<br />

12 C/o Road side CC drain from Greenmount School to F sector Slab Culvert Papumpare 1.03 0.00 1.03 1.03 1.03 100%<br />

13 C/o Protection wall to retain enquiry <strong>of</strong>fice and Minister bungalow No. 1 on Papumpare 1.50 1.93 3.43 3.43 3.43 100%<br />

road from Circuit house from Ganga Market ( 80 Mtr)<br />

14 C/o R/Wall near Nithivihar Primary School( Godak Chena) Papumpare 1.00 0.98 1.98 1.90 1.90 96%<br />

15 C/o R/wall on the back side <strong>of</strong> bungalow No.11 Papumpare 1.00 1.56 2.56 2.56 2.56 100%<br />

16 R/Wall to protect <strong>Govt</strong>. Qtr. No. T-16 to 32 at 'G' Sector/Extn (R/Wall-30 mtr Papumpare 1.60 3.49 5.09 5.09 5.09 100%<br />

<strong>of</strong> 6 mtr high)<br />

17 C/o R/Wall at Mowb-II Road (Ch. 0.010 to 0.040 km.) 30 Mtr. 6 Mtr. Height) Papumpare 1.25 2.48 3.73 3.73 3.73 100%<br />

18 C/o Road from Shiv Mandir Niti Vihar to Abotani (Lower Niti Vihar) to Papumpare 4.50 6.99 11.49 0.00 0%<br />

connect main road leading to R.K.M. Hospital (F/C 1.00 Km).<br />

19 C/o C.C. Drain at Nyokum Lapang at Itanagar (200 Mtr) Papumpare 1.14 0.00 1.14 1.14 1.14 100%<br />

20 C/o C.C. Foot path from J.N. State Museum Itanagar via Kimey Pake to Mowb- Papumpare 2.00 1.98 3.98 2.01 2.01 51%<br />

II Short cut (Length 1175 Mtr.)<br />

21 Improvement <strong>of</strong> Internal Road at Nyokum Lapang village, Itanagar.(PH-II) ( Papumpare 2.00 3.00 5.00 5.00 5.00 100%<br />

F/C, Soling, mataling & carpeting )<br />

22 C/o R/wall on Road from Senkhi View to Botanical Garden (R/wall-30 mtr) Papumpare 1.68 0.00 1.68 1.68 1.68 100%<br />

23 Improvement <strong>of</strong> road from '0'-point tinali to Lobi via Panchali (Length 3.00 km) Papumpare 7.00 10.22 17.22 5.00 10.94 15.94 93%<br />

SH: S/Cul 2 mtr span-1 no, Re-surfacing, S/Cul 5 mtr span-1 no & R/Wall-60<br />

mtr upto Panchali)<br />

24 Improvement <strong>of</strong> road from Nitivihar Tri-junction to Senki view and ITBP Camp Papumpare 4.50 6.53 11.03 2.45 2.48 4.93 45%<br />

(Length 2.00 km) SH: Re-surfacing)<br />

25 Replacement <strong>of</strong> 2 nos hume pipe culverts with RCC Slab Culvert 1.50 mtr span Papumpare 2.50 2.51 5.01 2.00 1.85 3.85 77%<br />

on road from Nitivihar to Senkhi view<br />

26 Improvement <strong>of</strong> road from PHQ to SSB colony and Ganga Village (SH: Resurfacing<br />

Papumpare 4.25 5.98 10.23 10.23 10.23 100%<br />

- 1.50 km)<br />

27 C/o RCC Slab Culvert 1.50 mtr span -1 no at 'H'-Sector. Papumpare 3.29 0.00 3.29 3.29 3.29 100%


28 Renewal <strong>of</strong> surfacing <strong>of</strong> internal roads at Mowb-I & II, C1 & C2 sectors near Papumpare 11.00 16.13 27.13 27.13 27.13 100%<br />

Petrol Pump (Length 4.00 km)<br />

29 C/o 2 nos slab culverts, <strong>of</strong> 1.50 mtr span on Nitivihar-Mowb-II road including Papumpare 1.75 2.52 4.27 4.27 4.27 100%<br />

catch pits & drain.<br />

30 Road from Forest Corporation to Ganga lake road (SH: S/Cul 2 mtr span-2 nos) Papumpare 2.85 4.20 7.05 7.05 0.00 0.00 7.05 100%<br />

31 Re-carpeting <strong>of</strong> internal road <strong>of</strong> MLA Cottage (Length 1.00 km) Papumpare 2.45 3.98 6.43 2.45 2.45 4.90 76%<br />

32 C/o R/Wall near T.M.N. Complex at Chandranagar, Itanagar (SH: R/Wall-50 Papumpare 2.15 4.02 6.17 6.17 0.00 0.00 6.17 100%<br />

mtr).<br />

33 C/o Approach Road to T-II Line No. 16 to 32 at 'G' Sector, Itanagar (0.20 km) Papumpare 1.80 4.00 5.80 5.80 0.00 0.00 5.80 100%<br />

(SH: Soling, Metalling, Carpetting, Culverts <strong>of</strong> 3 mtr span & Side Drain)<br />

34 Road from NH-52A to Senkhi Park Minister Bunglow (SH: Slab Culvert 1 mtr Papumpare 1.45 0.01 1.46 1.40 1.40 96%<br />

span-1 no near CD-B & R/Wall-20 mtr).<br />

35 Retaining Wall to protect Mowb-II to Panchali road Papumpare 0.95 2.01 2.96 2.93 2.93 99%<br />

36 Extension <strong>of</strong> Mowb-I Colony road to connect residential building D-28, D-36, Papumpare 2.50 -0.02 2.48 2.48 0.00 0.00 2.48 100%<br />

D-37 etc. (SH: F/C, Soling, Metalling & R/Wall)<br />

37 Improvement <strong>of</strong> road from Industry Colony to Residential and Bachalor BarrackPapumpare 1.10 1.99 3.09 1.50 3.02 4.52 146%<br />

quarter at Chandranagar near Ganga river (800 Mtr) (SH: Culvert, Soling,<br />

metalling & R/Wall)<br />

38 C/o Breast Wall on road to Mowb-II (in front <strong>of</strong> U.D. <strong>of</strong>fice) Itanagar (10 Mtrs) Papumpare 0.50 0.01 0.51 0.45 0.45 88%<br />

39 Improvement <strong>of</strong> road from E-Sector to E-Extension at Itanagar (SH: Formation Papumpare 1.45 2.49 3.94 3.27 3.27 83%<br />

filling, Soling, Metalling & Carpeting)<br />

40 Approach road from NH-52A to Kassa Complex via Press Club Itanagar (L- Papumpare 4.90 6.42 11.32 5.08 5.08 45%<br />

0.500 Km) (SH: F/C & SMC)<br />

41 C/o approach road from E-Sector Electrical Power House to Science Museum Papumpare 8.15 11.52 19.67 4.00 7.21 11.21 57%<br />

at Lower E-Sector, near I.G. Park, Itanagar Park Water Tank (SH: SMC, CC<br />

Drain, S/Culvert & R/Wall Length-0.400 Km)<br />

42 C/o R/wall to protect land slide near tri-junction at Nithivihar(near Bungalow Papumpare 1.98 0.00 1.98 1.90 1.90 96%<br />

No.6)(SH:RCC R/Wall-45 Mtr)<br />

43 C/o Protection wall, Storm water drain to channalise surface drain <strong>of</strong> from Papumpare 2.45 0.00 2.45 2.45 0.00 0.00 2.45 100%<br />

Sectt. Complex to Lower part E sector, Itanagar( RCC drain with cover- 200<br />

mtr)<br />

44 C/o Security fencing and retaining Wall for protection <strong>of</strong> <strong>of</strong>fice <strong>of</strong> the CE(E/Z) Papumpare 4.00 4.86 8.86 8.86 0.00 0.00 8.86 100%<br />

45 C/o Road from Niti Vihar PrimarySchool to NH-52A APEX Bank Colony at Papumpare 2.75 5.01 7.76 1.50 2.76 4.26 55%<br />

Itanagar (SH:- Side Drain 800 Mtr. & R/Wall 30Mtr.)<br />

46 C/o R/Wall to protect road '0' Point Tinali to Lobby near Marina Gas Agency at Papumpare 0.60 0.00 0.60 0.60 0.00 0.00 0.60 100%<br />

Itanagar (40Mtr.)


47 Approach road from NH-52-A to D-Sector Lower side residential colony (SH:- Papumpare 0.60 0.00 0.60 0.58 0.58 97%<br />

Soling, Metalling & Carpetting 200 mtr.)<br />

48 C/o R/Wall 3 Mtr height at A.G.R. Itanagar (200 Mtr.) Papumpare 2.05 -0.02 2.03 0.00 0%<br />

49 Strom water drain on road from C-I to C-II Sector at Itanagar (Drain-400 mtr) Papumpare 1.80 -0.02 1.78 1.78 0.00 0.00 1.78 100%<br />

50 C/o road from Nitivihar to Senki Park water tank 0.76 Km (SH: C/o R/Wall and Papumpare 3.00 4.02 7.02 7.02 0.00 0.00 7.02 100%<br />

B/Wall length 90 mtr & side drain 500 mtr)<br />

51 C/o Approach road from Senki Park residential colony to Senki Park Water Papumpare 5.00 6.59 11.59 11.59 0.00 0.00 11.59 100%<br />

Tank (SH: Metalling and Carpeting-0.800 Km)<br />

52 Extension <strong>of</strong> Mowb-I Colony road to connect residential building D-28, D-36, Papumpare 2.50 -0.02 2.48 0.00 0%<br />

D-37 etc. (SH: F/C, Soling, Metalling & R/Wall)<br />

53 C/o Protection Wall near CD-B <strong>of</strong>fice (SH: R/Wall-8.00 mtr) Papumpare 0.60 -0.09 0.51 0.49 0.49 96%<br />

54 ROAD FROM 1.20 KM ON ITANAGAR -GOHPUR ROAD TO GANGA Papumpare 2.50 3.62 6.12 0.00 0%<br />

LAKE (R/B Wall P/Drain & carpetting.)<br />

ROAD FROM FOREST CORPORATION TO GANGA LAKE ( 2.00 Km) Papumpare<br />

55 Formation cutting 0- 2 Km Papumpare 2.50 3.01 5.51 5.51 0.00 0.00 5.51 100%<br />

56 Widening & culvert 1 No. on road to Lor village Papumpare 2.94 0.00 2.94 2.94 0.00 0.00 2.94 100%<br />

57 Road from Zoo tinali to Lorputum village road(SH: B/W-50 mtr with average Papumpare 1.73 0.00 1.73 1.66 1.66 96%<br />

height <strong>of</strong> 3 mtr)<br />

58 Approach road from NH-52A to Ganga village-III (SH: Slab Culvert-2 Nos) Papumpare 1.70 4.98 6.68 0.00 3.00 3.00 45%<br />

59 Improvement <strong>of</strong> road from Zoo Tinali to Lor Village (SH: S.M.C.) Papumpare 3.50 9.00 12.50 2.00 5.53 7.53 60%<br />

60 Improvement <strong>of</strong> road at backside <strong>of</strong> A.P. Forest Cooperation (SH: SMC-200 Papumpare 1.00 2.06 3.06 0.00 3.02 3.02 99%<br />

mtr)<br />

61 Maintenance <strong>of</strong> road and construction <strong>of</strong> road side drain from PHQ to Ganga Papumpare 3.00 6.00 9.00 0.00 0%<br />

village<br />

62 C/o approach road from NH- 52A to ITBP HQ Papumpare 1.50 6.99 8.49 0.00 0%<br />

63 C/o strom water drain at Sinkview Papumpare 1.25 2.50 3.75 1.50 1.50 40%<br />

Sub- Total 161.69 187.99 349.68 207.78 67.45 0.00 275.23<br />

CAPITAL COMPLEX ROAD UNDER CD-B<br />

66 Providing R/wall along with the approach road to Minister Bunglow area ESS Papumpare 2.89 0.00 2.89 2.89 2.89 100%<br />

sector Itanagar (200 mtr)<br />

67 Improvement <strong>of</strong> road from NH-52A at Chimpu toDirector <strong>of</strong> sports and (R/wall, Papumpare 5.25 5.98 11.23 10.75 10.75 96%<br />

culvert and side drain)<br />

68 C/o Road from NH-52A to Commandant <strong>of</strong>fice at Ist APPBN upto barrack and Papumpare 2.95 3.98 6.93 6.60 6.60 95%<br />

play ground (1.3km(Sh: WBM, Carpeting and Side drain.)


69 C/o Road from D type Qtr Ring road to Dokum coloney at Itanagar<br />

Papumpare 2.40 3.00 5.40 2.40 2.40 44%<br />

(1.20km)(SH: F/C, culvert)<br />

70 C/o approach road to T-II, T-III Qtr for PWDStaff at Chimpu (SH: F/C, Papumpare 1.80 4.01 5.81 5.65 5.65 97%<br />

Carpetting & culvert 350 mtrs.)<br />

71 C/o RR masonary wall to protect . <strong>Govt</strong> land near T-V Qtrs at V/Vihar. Papumpare 1.00 0.01 1.01 0.95 0.95 94%<br />

72 C/o RCC R/wall in between Qtr <strong>of</strong> PHED & Industry Minister. Papumpare 1.20 3.49 4.69 2.00 2.00 43%<br />

73 Extn <strong>of</strong> road from ESS sector to CRC church (500 mtr) Papumpare 2.33 0.00 2.33 2.00 2.00 86%<br />

74 WBM & BT to approach road to NEFA club bldg. at Itanagar.(0.50 km) Papumpare 1.95 3.02 4.97 4.75 4.75 96%<br />

75 C/o B/wall protect PWD enquiry <strong>of</strong>fice and Minister bunglaw No. 1 on road Papumpare 1.95 0.02 1.97 1.95 1.95 99%<br />

from C/house to Ganga Market At upper ESS sector (80mtr)<br />

76 C/o A/Road from NH-52A to Primary School at 'P' sector ( SH:- F/c, Sol,Met, Papumpare 1.15 2.01 3.16 0.00 3.15 0.00 3.15 100%<br />

carpetting& R/wall )<br />

77 Extension <strong>of</strong> road from Chimpu to Chimpu-II (2.00km)(SH:- F/c,<br />

Papumpare 12.00 11.33 23.33 8.00 8.00 34%<br />

Sol,Met,carpetting & R/wall)<br />

78 C/o Protection wall in the back side <strong>of</strong> <strong>Govt</strong>. H.S school ( Lower Building) Papumpare 4.00 5.00 9.00 4.00 4.00 44%<br />

ESS sector at Itanagar( 60.00 mtr)<br />

79 C/o R/wall 125 mtr and 6mtr height on land side to back side <strong>of</strong> capital Papumpare 1.00 0.00 1.00 0.95 0.95 95%<br />

division -'B' <strong>of</strong>fice complex<br />

80 C/o B/wall at Junction point <strong>of</strong> Road at NH-52 A to Director Horticulture at Papumpare 2.00 0.00 2.00 1.90 1.90 95%<br />

Itanagar<br />

81 C/o R/wall I/c widening at Upper Ring road near Doordarshan Colony at Papumpare 2.80 0.00 2.80 2.80 0.00 0.00 2.80 100%<br />

Itanagar( Wide- 50mtr & R/wall -30mtr)<br />

82 Construction <strong>of</strong> side drain at Upper Ring Road, Itanagar (1.00 Km) Papumpare 2.30 6.02 8.32 2.30 2.30 28%<br />

83 Construction <strong>of</strong> link road from 'P' Sector to Romey colony at Itanagar Papumpare 3.00 3.21 6.21 2.00 2.00 32%<br />

84 C/o R/Wall on P-Sector colony road near MTMC building at Itanagar Papumpare 2.30 3.01 5.31 0.00 0%<br />

85 Special repair <strong>of</strong> approach road to D.N. College Itanagar (1.00 Km) Papumpare 2.00 2.00 4.00 2.00 2.00 50%<br />

86 Road to Minister's Bunglow at ESS sector at Itanagar (R/Wall near Qtr. No.T- Papumpare 1.70 2.00 3.70 1.90 1.90 51%<br />

III,7,8,21,& 22.<br />

87 C/o R/wall at C-sector Bypass road to C-sector Primary School (R/Wall - 35 Papumpare 1.50 0.00 1.50 0.00 0%<br />

mtr)<br />

88 S/culvert 1 mtr. Span and R/wall 60 mtr. At B-sector road at Itanagar Papumpare 2.15 0.00 2.15 2.05 2.05 95%<br />

89 Special repair & slip clearance on ridge road near the residence <strong>of</strong> Shri Omak Papumpare 1.00 0.00 1.00 1.00 0.00 0.00 1.00 100%<br />

Apang at Itanagar.<br />

90 Improvement <strong>of</strong> Road from NH-52A to RWD colony at Itanagar (SH: Papumpare 4.50 10.02 14.52 14.00 14.00 96%<br />

Metalling, Carpeting - 800 mtr)<br />

91 Improvement <strong>of</strong> Road from Gandhi Market to 'P' Sector at Itanagar (SH: C/o<br />

RCC Slab Culvert (4.00 mtr span-1 no)<br />

Papumpare 2.60 4.02 6.62 6.30 6.30 95%


92 Improvement <strong>of</strong> Internal road <strong>of</strong> 'A' & 'B' Sector, Itanagar - 750 mtr (SH: Recarpeting<br />

Papumpare 1.50 1.60 3.10 3.00 3.00 97%<br />

& R/Wall-30 mtr near KG School Rajbhawan)<br />

93 Road from Batt-I to Batt-II (SH: Soling 2.00km) Papumpare 2.55 4.02 6.57 2.50 2.50 38%<br />

94 Approach Road <strong>of</strong> <strong>Govt</strong>. Middle School at 'P' Sector, Itanagar (SH: F/Cutting & Papumpare 4.00 4.85 8.85 6.00 6.00 68%<br />

R/Wall-50 mtr)<br />

95 C/o Road from ESS Sector to RWD Colony at Itanagar (0.37 km) (SH: Soling, Papumpare 2.35 6.00 8.35 2.35 2.35 28%<br />

Metalling and Carpeting)<br />

96 C/o approach road from NH52A to ITBP HQ at Ganga (0.30 Km) (SH:- F/C-, Papumpare 3.20 3.99 7.19 7.00 7.00 97%<br />

Sol & S/Culvert- 1.00 mtrs Span-1 No)<br />

97 Improvement <strong>of</strong> internal road fron NH-52 A to Upper vivek vihar, Itanagar , Papumpare 1.05 0.99 2.04 2.00 2.00 98%<br />

(R/Wall-30 mtr.)<br />

98 Improvement <strong>of</strong> internal road at Dokum Colony (SH: Culvert 2 mtr. Span-1 No) Papumpare 2.50 0.00 2.50 1.00 1.00 40%<br />

99 C/o wing wall to protect the slab culvert on road from NH -52A to Sports Papumpare 1.00 1.50 2.50 1.00 1.50 0.00 2.50 100%<br />

Complex<br />

100 C/o Retaining Wall at Upper Ring Road near 'C' Sector Circuit House (R/Wall- Papumpare 1.00 0.00 1.00 1.00 1.00 100%<br />

20.00 mtr)<br />

101 Repairing <strong>of</strong> footpath to Womens Hostel at C-Sector Itanagar Papumpare 0.75 0.00 0.75 0.75 0.75 100%<br />

102 Approach road from NH-52 A to Police Colony (SH: R/Wall-15 mtr) Papumpare 0.75 1.00 1.75 1.75 0.00 0.00 1.75 100%<br />

103 C/o R/wall to protect C-Sector road near Gandhi Market, Itanagar (50.00 Mtr.) Papumpare 1.05 3.00 4.05 0.00 4.05 0.00 4.05 100%<br />

104 C/o R/wall and CC Drain to protect the road from D.N. College to Upper Vivek Papumpare 0.50 1.00 1.50 1.40 1.50 0.00 2.90 193%<br />

Vihar at Itanagar (SH: R/wall-15 mtr. & CC Drain - 15 Mtr.)<br />

105 C/o R/wall to protect the road near CD'A' <strong>of</strong>fice at Itanagar(SH: R/wall-25 mtr.) Papumpare 0.80 0.00 0.80 0.00 1.60 0.00 1.60 200%<br />

106 C/o approach road from NH - 25 A to Jadung Putung (F/C - 200 Mtrs.) Papumpare 2.51 0.00 2.51 0.00 2.51 0.00 2.51 100%<br />

107 Improvement <strong>of</strong> road from MLA cottage to NEFA club building and Papumpare 2.40 5.99 8.39 4.00 4.35 0.00 8.35 100%<br />

Doordarshan staff colony (1.00 Km) (SH: Soling-1.00 Km, S/Cul 1 mtr span - 2<br />

Nos)<br />

108 C/o R/wall at upper Ring Road from Doordarshan <strong>of</strong>fice to Ganga market Papumpare 1.70 4.00 5.70 5.20 5.20 91%<br />

(SH;R/wall - 20 mtr)<br />

109 ROAD FROM JULLY VILLAGE TO PAPPU NALLAH (6.00 KM). Papumpare<br />

110 R/wall, B/wall & P/drain at ch. No 6-12 km ) Papumpare 4.00 5.01 9.01 5.00 5.00 55%<br />

111 Road from Itanagar to Pappu Nallah via Jully village (SH: C/o RCC Culvert Papumpare 2.50 6.02 8.52 5.00 5.00 59%<br />

6.00 mtr span - 1 no)<br />

ROAD FROM DONYI COLONY (I) AND OLD IGP OFFICE GANGA<br />

3.00 KM<br />

Papumpare


112 Re- carpeting & Re- WBM <strong>of</strong> Internal road within 'A' & 'B' sector Itanagar( Papumpare 1.35 3.02 4.37 4.25 4.25 97%<br />

WBM, Car-1.20 km & R/wall 20 mtr at 'A' sector)<br />

113 C/o wing wall & RCC H.P. culvert on up steram side <strong>of</strong> the road from daily Papumpare 1.50 0.00 1.50 0.00 0%<br />

market to 'P' sector at Itanagar<br />

114 C/o S/Culvert <strong>of</strong> 4 mtr span near Doordarshan Colony road Papumpare 3.24 0.00 3.24 3.10 3.10 96%<br />

115 C/o Internal road from NH-52 -A to 'B' sector ( SH:- R/wall at various Papumpare 1.10 0.02 1.12 1.05 1.05 94%<br />

chainage) R/wall -60mtr and B/wall -30 mtr)<br />

116 A/road for Newly sanctioned Rajbhawan staff Qtr( SH:- F/c, filling, soling, met Papumpare 3.85 10.00 13.85 5.05 5.05 36%<br />

& 2 Nos <strong>of</strong> RCC cul length - 6 mtr)<br />

117 A./road from NH-52 A to Horticulture Directorate <strong>of</strong>fice complex at Chimpu , Papumpare 4.60 5.05 9.65 4.00 5.65 0.00 9.65 100%<br />

itanagar( SH:- F/c- 0.10km, CC Drain- 0.50 km , WBM - 0.30 km & B/T- 0.50<br />

km)<br />

118 Road from Donyi Colony to IGP <strong>of</strong>fice Ganga at Itanagar (SH: Formation Papumpare 8.30 10.00 18.30 0.00 0%<br />

cutting 3.00 km)<br />

119 Maint. And special repair at "C" sector market area at Itanagar Papumpare 4.30 5.01 9.31 4.30 4.30 46%<br />

120 ROAD FROM CHIMI VILLAGE TO MAWA HAPPAH (PROPOSED<br />

MODEL SCHOOL (4.00 KM) (SH: F/Cutting-0 to 4.00 km)<br />

Papumpare 12.40 18.01 30.41 10.00 10.00 33%<br />

121 ROAD FROM 6.00 KM POINT ON NH-52A ITANAGAR-<br />

Papumpare 3.00 3.78 6.78 0.00 6.78 0.00 6.78 100%<br />

NAHARLAGUN ROAD TO JULLY-II VILLAGE (2.50 KM) (SH:<br />

F/Cutting - 2.50 Km)<br />

Sub- Total 149.47 175.99 325.46 143.54 57.39 0.00 200.93 62%<br />

NAHARLAGUN TOWNSHIP ROAD<br />

122 Providing footpath for pedestrian on NH-52 at Nlg.(Itanagar) 4.50 0.02 4.52 4.52 4.52 100%<br />

123 C/o <strong>of</strong> Internal road for Oju Mission Complex Pappu Giri at Nlg.(1.5KM) (SH:- Papumpare 4.00 4.00 8.00 0.00 8.00 8.00 100%<br />

Sol.,WBM,BT, Drain<br />

124 C/o storm water drain & slab culvert (2M span) 2Nos. & drain 300M at "G" Papumpare 2.40 0.01 2.41 2.41 2.41 100%<br />

Extn., Nlg.<br />

125 C/o R/Wall & B/Wall on Approach road to Bharat Scout and Guide at Nlg. Papumpare 2.04 0.00 2.04 2.04 2.04 100%<br />

(200M)<br />

126 Imp. Of road from "G" Extn. To G-Sector Forest colony towards dam site (3 Papumpare 2.90 0.01 2.91 2.91 2.91 100%<br />

KM) (SH: E/Filling, Cross Darinages, S/ Drain & Re carpt.)<br />

127 Protection work for residential Qtr. At Power House Colony,Nharlagun. Papumpare 1.65 0.00 1.65 1.65 1.65 100%<br />

128 C/o 5 Nos. slab culvert at 'C' sector, Nlg. Papumpare 1.25 0.01 1.26 1.26 1.26 100%<br />

129 C/o 1 No. S/cul 2 m span on approach road to transport colony at polo colony Papumpare 1.00 1.89 2.89 2.89 2.89 100%


130 C/o Approah road from NH 52 A to lower Rakap colony at Naharlagun (SH: Papumpare 2.85 5.02 7.87 7.87 7.87 100%<br />

FC, WBM & BT) length - 1.00 Km.<br />

131 Improvement <strong>of</strong> approach road to <strong>Govt</strong>. Primary school at Pappu Nallah (SH: Papumpare 0.70 2.02 2.72 2.72 2.72 100%<br />

R/wall )<br />

132 C/o R/Wall to Polo colony near Anukul Thakur Mandir. Papumpare 1.65 2.02 3.67 3.67 3.67 100%<br />

133 Carriage <strong>of</strong> Spun pipe from Nlg. Stockyard to Karsingsa Papumpare 1.50 1.50 3.00 3.00 3.00 100%<br />

134 C/o Approach road to residential Colony behind High Court complex at 'D' Papumpare 2.30 0.00 2.30 2.30 2.30 100%<br />

Sector, Nlg. (200M)<br />

135 C/o R.R. Masonary Wall at Barapani Streams near Little Rose School at Papumpare 1.00 1.91 2.91 2.91 2.91 100%<br />

Naharlagun.<br />

136 C/o R/wall at "E" sector way to "F" sector road (150M) Papumpare 2.00 2.39 4.39 4.39 4.39 100%<br />

137 C/o road from "F" sector Tinali to F&G sector (150 m) (SH : Sol,<br />

Papumpare 1.90 0.00 1.90 1.90 1.90 100%<br />

Met,Carpeting)<br />

138 Approach road from NH - 52 A to Takar colony, Barapani (SH : Sol, Met, Papumpare 4.78 0.00 4.78 4.78 4.78 100%<br />

carpeting)<br />

139 C/o R/wall at existing road at polo colony,Naharlagun. Papumpare 1.63 0.00 1.63 1.63 1.63 100%<br />

140 C/o road from Forest colony near Youth Hostel to Rakap colony (2.00 Km) (SH Papumpare 5.95 0.00 5.95 5.95 5.95 100%<br />

: FC - 960 m)<br />

141 Improvement <strong>of</strong> Road from 'G' Extension to Bharat Scout & Guide at Polo Papumpare 4.80 7.02 11.82 11.82 11.82 100%<br />

Colony, Naharlagun (SH: Re-carpeting-1.500 km)<br />

142 Improvement <strong>of</strong> Approach road to E Sector (near Donyi Polo Mandir) Papumpare 6.50 8.54 15.04 15.04 15.04 100%<br />

Naharlagun and Old Secretariat Road at Naharlagun near EAC <strong>of</strong>fice (Length-<br />

1.00 km) (SH: E/Filling, Soling, Metalling, Carpeting, R/Wall & Side<br />

Drainage).<br />

143 Improvement <strong>of</strong> road from NH-52A to SENCC <strong>of</strong>fice at Papu Hill, Naharlagun Papumpare 1.00 1.87 2.87 2.87 2.87 100%<br />

(SH: Recarpeting-0.50 km & R/Wall near Transport <strong>Department</strong> Quarter.<br />

144 Improvement <strong>of</strong> road from NH-52A to Papu village (3.00 km) (SH: Soling, Papumpare 9.50 13.99 23.49 23.49 23.49 100%<br />

Metalling and Carpetting)<br />

145 Improvement <strong>of</strong> road from NH-52A to Pachin colony at Naharlagun (SH: Recarpeting<br />

Papumpare 10.75 15.01 25.76 25.76 25.76 100%<br />

3.30 km, R/Wall 25 mtr, Culvert 4 mtr span-1 no and 1 mtr span-1 no<br />

& Side Drain at Barapani Bazar)<br />

146 KARSHINGSA TOWNSHIP ROADS (C/o Approach road to Adi Basti from Papumpare 2.35 0.02 2.37 2.37 2.37 100%<br />

complex at Karshingsa (SH:-F/C, culvert and soling.)<br />

147 APPROACH ROAD TO LEKHI VILLAGE (Formation cutting 2.00 Km) Papumpare 1.95 0.02 1.97 1.97 1.97 100%<br />

148 CONSTRUCTION OF DAMSITE APPROACH ROAD TO MODEL<br />

VILLAGE (TADO) NAHARLAGUN.<br />

Papumpare


149 C/o R/wall to protect Lower Prem Nagar area (60 m). Papumpare 2.89 0.00 2.89 0.00 0%<br />

150 C/o approach road from 756 BRTF HO to Omkar Mission School complex Papumpare 2.40 4.98 7.38 7.38 7.38 100%<br />

(opposite Damsite) Nlg (F/cutting - 1.00 Km)<br />

151 C/o Slab culvert 1 no. near <strong>Govt</strong>. priting press at Pappu Nallah, Naharlagun Papumpare 1.75 2.99 4.74 4.74 4.74 100%<br />

152 C/o approach road to the <strong>Govt</strong>. resdl. Qtr. No. T-II-123 to 128 at "C" sector, Papumpare 1.60 1.00 2.60 2.60 2.60 100%<br />

Naharlagun(soling, metalling & B/topping 200 m).<br />

153 Extension <strong>of</strong> road from NH-52 A to upper Model village (F/C-2.00 Km) Papumpare 5.00 6.99 11.99 11.99 11.99 100%<br />

154 Formation cutting Papumpare 1.65 2.02 3.67 0.00 0%<br />

155 Improvement <strong>of</strong> internal road at State Transport Colony, Polo Colony, Papumpare 6.00 11.00 17.00 0.00 0%<br />

Naharlagun (SH: R/Wall)<br />

156 Improvement <strong>of</strong> road from Borun-I to Borun-II (1.00 Km) Papumpare 4.50 7.00 11.50 6.00 5.50 0.00 11.50 100%<br />

157 C/o Retaining Wall at Polo Colony Naharlagun Papumpare 1.00 1.40 2.40 2.40 2.40 100%<br />

Sub- Total 109.64 104.65 214.29 63.18 127.55 0.00 190.73 89%<br />

Name Of Circle : Naharlagun Civil Circle<br />

Name Of Division : Doimukh Division<br />

ROAD FROM KIMIN-RANGA BRIDGE POINT TO KAKOI<br />

158 F/Cutting (3.00-5.00 Km.) Papumpare 4.90 6.01 10.91 3.12 10.91 14.03 129%<br />

159 Soling, 3.00Km. Papumpare 3.00 3.00 6.00 6.00 6.00 100%<br />

160 ROAD FOR NEW DISTRICT HQ OF PAPUM PARE (YUPIA), (Internal Papumpare 12.00 15.63 27.63 10.41 17.22 27.63 100%<br />

Service road connected to Resdl. Bldgs. (4 Km) SH :F/cutting, SMC, Side<br />

Drain)<br />

DOIMUKH TOWNSHIP ROADS Papumpare 0.00<br />

161 Impvt. Of Doimukh township Road from Doimukh suspension Bridge point ot Papumpare 5.75 15.00 20.75 4.16 16.59 20.75 100%<br />

Ziro Point <strong>of</strong> Hoj Road at Kola Camp (7Km.)<br />

(SH : Slab culverts-3Nos, HPC -10Nos., WBM-0.4Km., side Drain -3.80Km. &<br />

Re-Carpetting -7 Km.)<br />

162 Construction <strong>of</strong> Road from Jotte to Jotte M.E.School (2.00Km.)(SH:- C/O HPC Papumpare 4.00 5.00 9.00 5.20 3.80 9.00 100%<br />

8Nos., SC -2Nos. Span 2m, SC 6m Span-1No.)<br />

163 Protection work for Pachin Pare bridge Papumpare 2.00 4.01 6.01 2.08 5.77 7.85 131%<br />

164 Improvement <strong>of</strong> approach road to Secondary School Kimin( Phase-I) Papumpare 2.90 0.02 2.92 2.92 0.00 0.00 2.92 100%<br />

165 BALIJAN TOWNSHIP ROAD (2.00 KM) (Re-carpetting & CC Drain (2.00 Papumpare 3.00 4.15 7.15 3.12 6.00 9.12 128%<br />

km))<br />

166 ROAD FROM BASAR NALO TO TARASO C.O H.Q (30KM.) (Formation Papumpare 21.35 31.99 53.34 10.40 42.94 0.00 53.34 100%<br />

Cutting (0.00 to 5.00 Km).)<br />

167 JOTTE-LAW ROAD (33.00KM.)(Formation Cutting (5 to 10Km)) Papumpare 15.75 28.00 43.75 20.80 22.80 0.00 43.60 100%


168 APPROACH ROAD FROM NH-52A TO INTER DABUM VILLAGE AT Papumpare 5.70 9.02 14.72 14.70 0.02 0.00 14.72 100%<br />

KARSINGSA (2.50KM.) (Formation cutting (2.50 Km))<br />

169 RCC SLAB CULVERT AT TARAJULI (F) VILLAGE TO LINK ROAD Papumpare 3.39 0.00 3.39 0.00 3.39 0.00 3.39 100%<br />

TO 7.00KM. (Slab Culvert 2 mtr span-2Nos.)<br />

170 ROAD FROM NEW DISTRICT HQ OF PAPUM PARE (YUPIA) (Intenral Papumpare 14.10 22.02 36.12 9.97 26.15 0.00 36.12 100%<br />

service road connected to residential building (4.00Km.) (SH:- Formation<br />

cutting, SMC, side Drain))<br />

171 ROAD FROM KHULA CAMP TO YUPIA (7.00 KM) (Metalling & Black Papumpare 13.00 19.62 32.62 14.28 18.34 0.00 32.62 100%<br />

Topping, 0 to 7.00 km)<br />

172 ROAD FROM PAPPU NALLAH-DOIMUKH ROAD TO INDUSTRIAL Papumpare 3.20 4.02 7.22 0.00 7.22 0.00 7.22 100%<br />

ESTATE (1.50 KM) (F/C, Soling & Side Drain, 1.50 km (Ph-I : Embankment-<br />

450 mtr, Sol-500 mtr, Drain-200 mtr))<br />

173 IMPROVEMENT OF ROAD FROM BANDERDEWA TO SONAJULI Papumpare 10.00 12.87 22.87 0.00 22.87 0.00 22.87 100%<br />

(Soling & WBM)<br />

174 ROAD FROM GOHPUR TINALI TO GANGA LAKE (C/o road from Papumpare 4.33 0.00 4.33 4.29 0.04 0.00 4.33 100%<br />

Gohpur tinali to Ganga lake (SH: R/W- 30 Mtr, S/Cul-1 No <strong>of</strong> 1 mtr span))<br />

Sub- Total 128.37 180.36 308.73 105.45 210.06 0.00 315.51 102%<br />

Name <strong>of</strong> Circle :- Naharlagun Civil Circle<br />

Name <strong>of</strong> Division :- Sagalee Division<br />

DOIMUKH SAGALEE ROAD (60.00 KM)<br />

175 C/o RCC slab culvert on 19mile Nallah at Ch: 28.175 km (span 6 mtr) 1No. Papumpare 3.48 0.00 3.48 3.48 3.48 100%<br />

176 Infrastructure dev. for newly created Sagalee Division (<strong>of</strong>fice building Papumpare 4.40 0.98 5.38 5.38 0.00 5.38 100%<br />

including furnitures).<br />

177 C/o RCC slab culvert 2 Nos. on Bee & Ngudang nallah (6 mtr span each). Papumpare 5.15 8.01 13.16 13.16 0.00 13.16 100%<br />

178 Slab Culvert over Papi Nallah (span 6 mtr) Papumpare 7.00 0.00 7.00 7.00 0.00 7.00 100%<br />

179 SAGALEE-MENGIO ROAD (150.00 KM)(Soling 20 to 25 Km.) Papumpare 4.00 6.00 10.00 10.00 0.00 10.00 100%<br />

180 DEEDOLO-LEPORIANG ROAD (15.00 KM) (Diversion <strong>of</strong> sinking zone, Papumpare 7.30 0.00 7.30 7.30 0.00 7.30 100%<br />

Ph-I (F/C-1.00 km))<br />

181 ROAD FROM KHEEL TO HOJ CONNECTING DOIMUKH HOJ ROAD Papumpare 21.40 21.01 42.41 42.41 42.41 100%<br />

(18.00 KM). (F/Cutting (8.00 to 11.00 Km))<br />

182 ROAD FROM SAGALEE TO KAROI (20.00 KM).(Formation cutting from Papumpare 9.55 3.01 12.56 0.00 0.00 0%<br />

2.50 to 5.00 Km.)<br />

183 SAGALEE TOWNSHIP ROADS Papumpare<br />

184 Impvt. <strong>of</strong> approach road from Sagalee-Mengio road to Medical colony 250 mtr Papumpare 4.15 0.01 4.16 4.16 0.00 4.16 100%<br />

at Sagalee. (Sol., Met., Carptt. and road side drain).


185 C/o RCC slab culvert on approach road to EE PWD residence at Sagalee=2 Papumpare 1.66 0.00 1.66 1.66 0.00 1.66 100%<br />

Nos. <strong>of</strong> 1.50 mtr. Span<br />

186 Impvt. <strong>of</strong> approach road from BRTF road to T-V Bldg. (EE PWD Residence- Papumpare 5.89 0.00 5.89 5.65 0.00 5.65 96%<br />

280 mtr) (SH:- R/Wall & B/Wall).<br />

187 C/o Slab Culvert over IB Nallah at Sagalee (span 6 mtr). Papumpare 3.70 3.99 7.69 7.69 0.00 0.00 7.69 100%<br />

188 Extension <strong>of</strong> Sagalee Township Road (SH: F/Cutting 2.00 km) Papumpare 10.35 12.00 22.35 10.00 11.45 0.00 21.45 96%<br />

189 C/o RCC Retaining Wall with CC Drainage at Old Market (Ph-I) (75 mtr) Papumpare 3.80 5.01 8.81 3.50 4.95 0.00 8.45 96%<br />

190 SH:- R/Wall & B/Wall Papumpare 1.65 0.01 1.66 1.59 0.00 1.59 96%<br />

191 DOIMUKH-TORU ROAD (C/o RCC Drain (SH: 0 to 10.00 Km)) Papumpare 8.00 20.98 28.98 0.00 0.00 0%<br />

192 ROAD FROM BOBIA TO BOBIA PRIMARY SCHOOL (4.00<br />

Papumpare 16.20 23.98 40.18 20.00 18.55 0.00 38.55 96%<br />

KM)(Formation cutting, 0.00 to 4.00 km.)<br />

193 ROAD FROM LAPTAP TO LAPTAP I.V. SCHOOL (1.10 KM) Papumpare 2.00 2.37 4.37 0.00 4.37 4.37 100%<br />

(Formation cutting, 1.10 km.)<br />

ROAD FROM LEPORIANG TO RACHI (16.00 KM)<br />

Papumpare<br />

194 Formation cutting (0 to 2.00 km). Papumpare 5.08 0.00 5.08 4.88 0.00 4.88 96%<br />

195 Formation Cutting (2.00 to 5.00 Km) Papumpare 15.15 24.98 40.13 5.00 15.00 20.13 40.13 100%<br />

196 ROAD FROM SAKIANG TO PAGA (36.00 KM)(Formation cutting, 0 to Papumpare 8.05 12.01 20.06 5.00 15.06 20.06 100%<br />

3.00 km.)<br />

197 APPROACH ROAD FROM MENGIO PWD ROAD TO TAW VILLAGE Papumpare 12.40 16.98 29.38 7.00 10.00 12.38 29.38 100%<br />

VIA SIMA AND GENGTUNG VILLAGE (10.00 KM) (Survey and<br />

Investigation & F/cutting, 0 to 3.00 Km.)<br />

198 ROAD FROM NGUDANG/JOHA TO TANI HAPA (F/Cutting 3.00 km) Papumpare 15.00 26.37 41.37 10.00 29.70 0.00 39.70 96%<br />

199 ROAD FROM AMBAM TO NYOPANG VILLAGE VIA SARCH GAI,<br />

SILSANGSO AND AURUNG (30.00 KM) (F/Cutting, 0 - 5.00 km)<br />

Papumpare 9.95 26.99 36.94 20.00 15.45 0.00 35.45 96%<br />

200 LEPORIANG TOWNSHIP ROAD (F/Cutting, 0 - 2.00 km & S/Culvert 4 mtr Papumpare 8.00 10.96 18.96 8.00 10.20 0.00 18.20 96%<br />

span-1 no.)<br />

201 MENGIO TOWNSHIP ROAD (Approach road to M.E. School (0.90 km) Papumpare 5.00 6.80 11.80 10.00 1.33 0.00 11.33 96%<br />

(SH: F/Cutting 0.90 km))<br />

202 APPROACH ROAD FROM SAGALEE-MENGIO ROAD TO DON- Papumpare 2.35 3.01 5.36 5.36 0.00 0.00 5.36 100%<br />

BOSCO SCHOOL (Soling, Metalling, Side Drain & Culvert 1 mtr span-2 nos<br />

(0.30 km))<br />

203 APPROACH ROAD TO C.O. HQ AT KHEEL (1.10 KM) (Soling, Papumpare 5.00 6.99 11.99 0.00 0.00 11.99 11.99 100%<br />

Metalling & Carpetting, 1.10 km)<br />

204 APPROACH ROAD TO PWD COMPLEX (F/Cutting 0.70 km) Papumpare 4.45 0.02 4.47 0.00 0.00 4.47 4.47 100%<br />

205 ROAD FROM LEPORIANG TO KHODASO (25.00 KM) (F/Cutting (0 to<br />

3.00 Km))<br />

Papumpare 16.00 23.85 39.85 0.00 0.00 39.85 39.85 100%


206 LEPORIANG TO SANGO VIA RESSING ROAD (20.00 KM) (Formation Papumpare 20.20 20.99 41.19 15.00 10.00 16.19 41.19 100%<br />

cutting (0 to 2.00 Km).)<br />

Sub- Total 246.31 287.31 533.62 175.21 138.75 170.33 484.29 91%<br />

Bridges<br />

NAME OF CIRCLE: CAPITAL CIRCLE<br />

NAME OF DIVISION:- CAPITAL DIVISION "A"<br />

NAHARLAGUN TOWNSHIP ROADS<br />

1 C/o RCC 10 m Span Briedge near Primary School Banderdewa. Papumpare 20.00 40.85 60.85 60.85 0.00 0.00 60.85 100%<br />

2 C/o RCC Bridge near Industrial area at "A" Sector, Naharlagun (span 10.00 Papumpare 12.50 19.99 32.49 0.00 0%<br />

mtr)<br />

Name Of Circle : Naharlagun Civil Circle<br />

Name Of Division : Doimukh Division<br />

ROAD FROM PAPUM-POMA TO BASSAR-NALO<br />

3 Construction <strong>of</strong> Bailey Bridge over river Poma (span 55 mtr) Papumpare 4.00 4.00 8.00 30.00 30.00 375%<br />

Name <strong>of</strong> Circle :- Naharlagun Civil Circle<br />

Name <strong>of</strong> Division :- Sagalee Division<br />

SAGALEE-MENGIO ROAD (150.00 KM).<br />

4 C/o RCC T-Beam bridge at Ch. 6.20 km on Lengruk nallah<br />

Papumpare 5.85 0.00 5.85 5.85 0.00 0.00 5.85 100%<br />

(Span=10 mtr).<br />

DEEDOLO-LEPORIANG ROAD<br />

5 C/o steel bridge over river Pare at Leporiang at Ch. 9.60 Km. (Span 50 mtrs.) Papumpare 15.20 0.02 15.22 0.00 0.00 15.22 15.22 100%<br />

ROAD FROM KHEEL TO HOJ CONNECTING DOIMUKH HOJ ROAD<br />

(18.00 KM)<br />

6 C/o RCC Bridge over river Shu on Kheel Hoz road (Span-50 m) (SH:- SSI) Papumpare 2.00 0.00 2.00 0.00 0.00 2.00 2.00 100%<br />

SAGALEE TOWNSHIP ROAD<br />

7 C/o RCC Bridge over river Riulang Papso (span 12 mtr) Papumpare 7.45 11.01 18.46 7.40 0.00 11.06 18.46 100%<br />

APPROACH ROAD TO C.O. HQ. AT KHEEL (1.10 KM).<br />

8 C/o bailey bridge over river Kheel (Span-25 mtr). Papumpare 12.10 24.01 36.11 0.00 0%<br />

ROAD FROM AMBAM TO NYOPANG VILLAGE VIA SARCH GAI,<br />

SILSANGO AND ARUNG (30.00 Km)<br />

9 C/o bridge over river paniyor on Ambum Nyapum road (80 mtrs Span) (SH:- Papumpare 2.00 0.00 2.00 0.00 0%<br />

SSI)


Sub-Total 81.10 99.88 180.98 104.10 0.00 28.28 132.38 73%<br />

Suspension Bridges<br />

Name Of Circle : Capital Circle<br />

Name Of Division : Naharlagun PW Division<br />

NAHARLAGUN TOWNSHIP ROADS<br />

1 C/o Foot suspension briege 120m span over river Pachin to connect Pachin<br />

Colony & D Sector at Naharlagun<br />

Name <strong>of</strong> Circle : Naharlagun<br />

Name <strong>of</strong> Division : Doimukh<br />

FOOT SUSPENSION BRIDGES UNDER DOIMUKH DIVISION<br />

2 Contn <strong>of</strong> Foot Suspension Bridge over Dikrong river in between Doimukh to<br />

Tigdo. (Span-150m).<br />

3 Contn <strong>of</strong> Suspension Bridge over Papum Poma in between Ramghat and<br />

Pampla village. (Span 120.00m)<br />

4 Contn <strong>of</strong> Suspension Bridge over river Taraso in between Taraso ME School &<br />

upper Taraso I & II (Span 80.00 m.)<br />

Papumpare 7.90 10.01 17.91 17.91 0.00 0.00 17.91 100%<br />

Papumpare<br />

Papumpare<br />

Papumpare 5.40 8.01 13.41 9.00 0.00 0.00 9.00 67%<br />

Papumpare 10.55 0.01 10.56 6.45 1.55 0.00 8.00 76%<br />

Papumpare 4.55 6.01 10.56 0.00 0%<br />

Circle :- Naharlagun Civil Circle<br />

Division :- Sagalee Division<br />

FOOT SUSPENSION BRIDGES UNDER SAGALEE DIVISION<br />

5 C/o Suspension bridge over river Kheel to connect new circle headquarter. Papumpare 11.85 10.00 21.85 0.00 0.00 21.85 21.85 100%<br />

6 C/o S/bridge over river Rachi river in between Leporiang to P/Kessang (60m) Papumpare 4.39 0.00 4.39 1.75 0.00 2.64 4.39 100%<br />

7 C/o suspension bridge over river Pare to connect Langdang and Hinso (90m Papumpare 8.55 7.02 15.57 6.25 0.00 9.32 15.57 100%<br />

span).<br />

8 C/o wire rope suspension bridge over river Pare at Gotopu (100 mtr). Papumpare 17.93 0.00 17.93 7.15 0.00 10.78 17.93 100%<br />

9 C/o wire rope suspension bridge over river Papi at Yallang (30 mtr). Papumpare 6.87 0.00 6.87 0.00 0.00 6.87 6.87 100%<br />

10 C/o suspension bridge over river Pareng between Seema and Gangtung village Papumpare 20.00 6.90 26.90 26.90 0.00 0.00 26.90 100%<br />

(Span-70 mtr).<br />

11 C/o Foot Suspension Bridge Panyor at Mengio (span 80 mtr) Papumpare 9.35 9.09 18.44 7.40 0.00 11.04 18.44 100%<br />

12 C/o foot suspension bridge over river Panior to connect CO HQ to Nargang I.V. Papumpare 12.95 18.98 31.93 12.75 0.00 19.18 31.93 100%<br />

School (SH: span 100 mtr)<br />

13 C/o wire rope suspension bridge over river pare in between Toru & Kheel (100 Papumpare 15.25 24.02 39.27 39.27 39.27 100%<br />

Mtrs).


14 C/o suspension bridge over river Parang to connect Toptu village (60 Mtrs Papumpare 10.10 13.98 24.08 9.65 0.00 14.43 24.08 100%<br />

Span)<br />

15 C/o wire rope suspension bridge over river pare in between Khemling and Papumpare 12.00 19.25 31.25 12.00 0.00 19.25 31.25 100%<br />

Karoi village (80 mtrs Span)<br />

16 C/o S/Bridge over river Pare between Lengruk & Ressing (span 60 mtr) Papumpare 12.00 10.00 22.00 8.80 0.00 13.20 22.00 100%<br />

17 C/o S/Bridge over river Pang between Page and Sangring (70 mtr) Papumpare 12.00 12.00 24.00 24.00 24.00 100%<br />

SUB-TOTAL 181.64 155.28 336.92 126.01 1.55 191.83 319.39 95%<br />

Porter Track<br />

CIRCLE : NAHARLAGUN<br />

DIVISION : SAGALEE<br />

PORTERTRACK/MULE TRACK UNDER SAGALEE DIVISION<br />

1 Improvement <strong>of</strong> porter track from Ngudang to Gangtung via Seema village Papumpare 4.08 0.00 4.08 0.00 0%<br />

(45.00 km).<br />

2 C/o P/Track from Pillo to Tabio (45.00 km) 8.25 10.01 18.26 10.00 10.00 55%<br />

Sub- Total 12.33 10.01 22.34 0.00 10.00 0.00 10.00 45%<br />

NLCPR<br />

NAME OF CIRCLE : NAHARLAGUN CIRCLE<br />

NAME OF DIVISION : SAGALEE DIVISION<br />

1 Improvement/Construction <strong>of</strong> Road from Sagalee to Sakiang (50.00 Km) Papumpare 100.00 197.53 297.53 60.00 150.00 87.53 297.53 100%<br />

2 Improvement <strong>of</strong> Doimukh - Toru Road (40.00 Km) (from NH-52A) Nirjuli to Papumpare 95.00 87.74 182.74 40.00 100.00 42.74 182.74 100%<br />

Sagalee.<br />

Sub- Total 195.00 285.27 480.27 100.00 250.00 130.27 480.27 100%<br />

NEC<br />

Name <strong>of</strong> Circle : NAHARLAGUN CIRCLE<br />

Name <strong>of</strong> Division : Doimukh Division<br />

1 Itanagar - Jotte - Balijan Road (47.00 Km) Papumpare 105.60 40.03 145.63 83.07 62.53 0.00 145.60 100%<br />

2 Improvement <strong>of</strong> Harmuti - Doimukh Road (6.00 Km) Papumpare 17.05 22.01 39.06 39.05 0.00 0.00 39.05 100%<br />

Sub- Total 122.65 62.04 184.69 122.12 62.53 0.00 184.65 100%<br />

CRF


Naharlagun Division<br />

1 C/o by pass road from Papu nallah to Itanagar via Doyni Polo Vidya Bhavan<br />

(7.05 km)<br />

Papumpare 143.40 145.17 288.57 140.00 140.00 49%<br />

5 Roads<br />

Grand Total (PWD : Papumpare) 1531.60 1693.95 3225.55 1287.39 925.28 520.71 2733.38<br />

NAME OF CIRCLE :- NAHARLAGUN CIVIL CIRCLE<br />

NAME OF DIVISION :- ZIRO DIVISION<br />

1 ROAD FROM BRTF ROAD TO BELLO -I &II ( 6.00 Km.) (Formation L/Subansiri 1.55 2.00 3.55 1.55 2.00 0.00 3.55 100%<br />

Cutting 0 to 1.00 Km.)<br />

ZIRO-PALIN ROAD (0-52.00Km.)<br />

2 App.Road to Magazine Bldg. at Jara. L/Subansiri 2.45 3.98 6.43 6.43 0.00 6.43 100%<br />

3 Culvert,R&B Wall =30-40km L/Subansiri 1.88 0.00 1.88 1.90 0.00 1.90 101%<br />

4 APPROACH ROAD TO MONIPOLIANG (7.00 KM) ('R/Wall & L/Subansiri 2.50 2.77 5.27 2.25 3.02 0.00 5.27 100%<br />

S/Drain='0.70km)<br />

5 ROAD FROM DEED TO MENGIO VIA BELLO (55.00KM) ('FC=15- L/Subansiri 6.35 10.02 16.37 6.35 10.02 0.00 16.37 100%<br />

25km)<br />

6 16KM PT ON RAGA DAPOROJO BRTF ROAD TO SUDRIK VILLAGE L/Subansiri 8.00 11.33 19.33 13.00 6.33 19.33 100%<br />

(10.00KM) ('FC=0-5km)<br />

7 BOA-SIMLA TALLEY VALLEY ROAD ('FC=5.00-10.00km) L/Subansiri 5.45 6.99 12.44 10.45 1.99 12.44 100%<br />

8 APPOACH ROAD TO QUARRY LINE & TO PWD MAGAZINE L/Subansiri 3.80 0.01 3.81 3.80 0.01 0.00 3.81 100%<br />

GODOWN AT ZIRO ('FC & WBM '=0-0.580km)<br />

9 ROAD FROM LUBA TO MENGI KABAK - UPTO KAMALA RIVER L/Subansiri 4.00 5.02 9.02 7.00 2.02 9.02 100%<br />

(8.00 KM) (FC=0-2.00 km)<br />

10 ROAD FROM BOA SIMLA TO KAMPORIJO (20.00KM) ('FC=10.00 - L/Subansiri 3.00 4.76 7.76 6.00 1.76 7.76 100%<br />

13.00 km)<br />

11 ROAD FROM GAA TO CHIMIR VIA LAU (20.00KM) ('FC=0.00 - 2.00 L/Subansiri 2.65 3.49 6.14 4.65 1.49 6.14 100%<br />

km)<br />

HAPOLI TOWNSHIP ROAD<br />

L/Subansiri<br />

12 Hapoli township to extn. area (1.50km) SH:FC, Filling, BT, PC, SD, Soling, L/Subansiri 2.05 3.99 6.04 3.99 3.99 66%<br />

Materials & BT (Hill Top road.).<br />

13 C/o App. Road from Hapoli Bus Station to Pai gate T-II Colony 1km SH:E/F & L/Subansiri 1.25 0.01 1.26 1.25 0.01 1.26 100%<br />

Pipe culverts=2Nos.


14 Extension <strong>of</strong> Hapoli township road to S.P. Colony (SH: F/C-1.00 Km & L/Subansiri 11.00 5.50 5.50 11.00 100%<br />

S/Culvert-1 No <strong>of</strong> 2 mtr span)<br />

15 ROAD FROM PANGE TO TALE VALLEY ('Impv.<strong>of</strong> road from Pange to L/Subansiri 1.50 1.99 3.49 0.00 3.49 3.49 100%<br />

Telly valley)<br />

16 ROAD FROM PASSA TO NEELAM ('Formation cutting 0-2.00 Km.) L/Subansiri 2.15 3.02 5.17 3.65 1.52 5.17 100%<br />

17 ROAD FROM HARI TO SIA PIRO ('FC=0-2km) L/Subansiri 2.79 0.00 2.79 2.80 0.00 0.00 2.80 100%<br />

18 YACHULI TOWNSHIP ROAD ('C/O approach road to DIET building at L/Subansiri 5.60 6.07 11.67 5.60 6.07 11.67 100%<br />

Yachuli (650mtr)(WBM,B/Toping, Culvert &Side Drain))<br />

19 ROAD FROM YACHULI DIVISIONAL HEAD QUARTER ('C/o approach L/Subansiri 3.00 3.77 6.77 4.50 2.27 6.77 100%<br />

road to the divisional commissioner's complex gate (2.50km). (SH:Soling,<br />

metalling, BT & Drain=2.50km)<br />

ROAD FROM HIJA TO SIYA (10.00KM)<br />

L/Subansiri<br />

20 FC=0-10km L/Subansiri 7.85 10.02 17.87 7.85 10.02 0.00 17.87 100%<br />

21 C/O S/Culvert 4 Nos <strong>of</strong> 1 Mtr Span(ph:-I-S/Culvert -3Nos) L/Subansiri 3.64 0.00 3.64 3.65 3.65 100%<br />

23 DEED TOWNSHIP ROAD ('C/o R/Wall behind Deed I.B. ) L/Subansiri 1.70 1.98 3.68 7.18 7.18 195%<br />

24 KIGAM TO METI VILLAGE ROAD(40.00KM) ('S & I=0-30km) L/Subansiri 1.35 0.00 1.35 1.35 1.35 100%<br />

26 ROAD FROM YATAP TO YAM VIA SEK TAP VILLAGE (30.00KM) ('S L/Subansiri 1.28 0.00 1.28 1.28 1.28 100%<br />

& I= 30km)<br />

27 ROAD FROM PANGING TO YASIBO VIA PAKING HAILANG L/Subansiri 1.86 0.00 1.86 1.86 1.86 100%<br />

(20.00KM) ('S & I= 20km)<br />

29 ROAD FROM TAGO POWER HOUSE TO MAI VIA DODU, TOLI, L/Subansiri 1.30 1.99 3.29 3.29 3.29 100%<br />

TANIO, KJ POCHU AND PEI (20.00KM) ('S&I=20.00 km)<br />

30 APPROACH ROAD FROM PISTANA TO KEI (F/Cutting 1.00KM) L/Subansiri 5.15 0.00 5.15 5.15 5.15 100%<br />

32 APPROACH ROAD TO BLUE PINE SCHOOL (500MTR)<br />

L/Subansiri 2.30 4.99 7.29 2.30 4.99 7.29 100%<br />

(Soling,Metalling&Carpetting )<br />

33 IMPROVEMENT ROAD FROM BRTF ROAD TO ZIRO - I (1.50 KM) L/Subansiri 1.10 3.31 4.41 1.40 3.01 4.41 100%<br />

(Soling,Metalling & Carpeting - 1.50Km)<br />

35 YAZALI-MANGIO ROAD (REALIGNMENT BETWEEN 12.50 TO 13.80 L/Subansiri 10.45 26.98 37.43 10.45 26.98 37.43 100%<br />

KM) (C/o Yazali-Mangio Road (Realignment <strong>of</strong> road between Ch:- 12.500 Km<br />

to 13.80 Km (SH:- F/Cutting - 1.26 Km, Sol-4.00 Km & HP- Culverts))<br />

Sub - Total = 97.95 118.49 227.44 118.23 110.70 0.00 228.93<br />

Bridges<br />

NAME OF CIRCLE :- NAHARLAGUN CIVIL CIRCLE<br />

NAME OF DIVISION :- ZIRO DIVISION<br />

ROAD FROM DEED TO MENGIO VIA BELLO (55.00KM)<br />

1 C/o permanent RCC bridge over river Seyi at Ch:2.21km & Span-21.75m L/Subansiri 4.95 0.01 4.96 4.95 0.01 4.96 100%


2 C/o RCC Bridge over River Pakh at Ch.14.10km on Deed- Mengio Road. L/Subansiri 4.50 5.99 10.49 10.49 10.49 100%<br />

3 C/o RCC T-Beam bridge at Ch:9.25km on river Poliu (span-14.75m) L/Subansiri 6.00 9.01 15.01 15.01 15.01 100%<br />

FOOT SUSPENSION BRIDGES UNDER ZIRO DIVISION<br />

NAME OF CIRCLE :- NAHARLAGUN CIVIL CIRCLE<br />

NAME OF DIVISION :- ZIRO DIVISION<br />

4 Foot suspension over river Keyi L/Subansiri 5.00 6.00 11.00 0.00 11.00 0.00 11.00 100%<br />

5 C/o Foot suspension bridge over river Dollung (100 mtr span) L/Subansiri 7.55 10.00 17.55 4.50 4.50 26%<br />

SUB- TOTAL= 28.00 31.01 59.01 30.45 15.51 0.00 45.96<br />

Porter Track<br />

CIRCLE : NAHARLAGUN<br />

DIVISION : ZIRO<br />

PORTER/MULE TRACKS UNDER ZIRO DIVISION<br />

1 From Tamen to Dollungmukh via Kalatopkari. L/Subansiri 0.33 0.00 0.33 0.35 0.35 106%<br />

RIDF & CRF<br />

ZIRO DIVISION<br />

YAZALI-MANGIO ROAD, (65.00 KM)<br />

1 F/C, Culverts, R&B Wall, Sol, WBM, B/Topping i/c Bridges. L/Subansiri 82.25 99.98 182.23 0.00 182.23 0.00 182.23 100%<br />

2 C/o rural road from 20 km point on Ziro-Daporijo BRTF Road (New both L/Subansiri 213.80 500.00 713.80 0.00 500.00 500.00 70%<br />

village) to Chambang<br />

Sub- Total 296.05 599.98 896.03 0.00 682.23 0.00 682.23<br />

0.00<br />

Total(PWD : Lower Subansiri) 422.33 749.48 1171.81 149.03 808.44 0.00 957.47<br />

6 Roads<br />

Name <strong>of</strong> circle : Naharlagun Civil Circle<br />

Name <strong>of</strong> Division : Sangram Division<br />

1 SANGRAM - NYAPIN ROAD (38.00 KM) (WBM & BT=20-30km) Kurungkumey 15.15 16.99 32.14 0.00 12.00 20.14 32.14 100%<br />

2 ROAD FROM BRFT ROAD TO LAYING DISTRICT HEAD QUARTER Kurungkumey 2.50 3.97 6.47 0.00 2.00 4.47 6.47 100%<br />

(C/o R/wall 50 mtrs & S/Culvert 2 nos <strong>of</strong> 1 mtrs span)<br />

SANGRAM TOWNSHIP ROAD<br />

Kurungkumey<br />

3 C/o App. road from Ania Colony to PWD inquiry <strong>of</strong>fice Nyapin (1.00Km) Kurungkumey 4.40 4.99 9.39 0.00 5.00 4.39 9.39 100%<br />

4 C/o CC foot path from PWD Road to Chambang Middle School (Length-700m) Kurungkumey 2.50 3.00 5.50 0.00 0.00 5.50 5.50 100%<br />

KOLORIANG TOWNSHIP ROAD<br />

Kurungkumey


5 Internal road for VKV & extension <strong>of</strong> township at Koloriang. (FC,Soling, Kurungkumey 2.50 3.02 5.52 0.00 1.00 4.52 5.52 100%<br />

Culvert & drain=3.00 km)<br />

6 Approach road from old Market line to Korak Dumpum (Sol. & Metl. 500 m) Kurungkumey 2.63 0.00 2.63 0.00 1.00 1.63 2.63 100%<br />

7 NYAPIN TOWNSHIP ROAD (C/o CC foothpath from PWD road to Pemih Kurungkumey 2.80 0.02 2.82 0.00 1.00 1.82 2.82 100%<br />

colony (250m))<br />

8 ROAD FROM CHAMBANG TO RINGTE-RITE (10.00 KM) (FC=0-3km) Kurungkumey 3.85 6.01 9.86 0.00 0.00 9.86 9.86 100%<br />

9 PARSI PARLO TOWNSHIP ROAD (FC=3km) Kurungkumey 4.40 7.01 11.41 0.00 0.00 11.41 11.41 100%<br />

10 ROAD FROM 11KM (KELA) POINT OF KOLORIANG PARSI PARLO Kurungkumey 3.00 4.97 7.97 0.00 2.00 5.97 7.97 100%<br />

ROAD TO PARI (20.00 KM) (FC=0-3km)<br />

11 ROAD PARSI PARLO TO DAMIN (70.00 KM) (FC=0-5km) Kurungkumey 3.10 4.99 8.09 4.00 4.00 49%<br />

12 ROAD FROM PUNGRUNG TO PARSIPARLO VIA LAYING HQ, Kurungkumey 10.00 13.22 23.22 0.00 0.00 23.22 23.22 100%<br />

GIDA, BYASI, PATING, LONGRO & HIBA VILLAGE (60.00 KM)<br />

(F/C=0-2.00 km)<br />

13 ROAD FROM NYAPIN PWD TO PAJI VIA LABA, PANUNG , BAKSU Kurungkumey 12.00 13.07 25.07 2.50 22.57 25.07 100%<br />

AND RATE & HOTE (20.00 KM) Nyapin to Laba FC = 3km<br />

14 S&I = 60km Kurungkumey 2.40 4.99 7.39 7.39 7.39 100%<br />

15 ROAD FROM DILONG TO TAJI LANGPA VIA PEEL (20.00 KM)(FC = Kurungkumey 4.00 6.01 10.01 0.00 9.60 0.41 10.01 100%<br />

0-2.00 Km.)<br />

16 ROAD FROM DENGDENG TO YANGTE VIA RONGTE RITE, AMSU Kurungkumey 2.10 2.99 5.09 0.00 0.00 0%<br />

PINJA AND KORIYER (45.00 KM) (S&I =45 km)<br />

17 ROAD FROM SANG CHAN ON PALIN TO CHAMBANG ROAD Kurungkumey 0.99 0.00 0.99 0.00 0.00 0%<br />

POINT TO GONG VIA DEBE, TUDBUT, PALAP, TATE (15.00 KM)(S&I<br />

=15 km)<br />

18 ROAD FROM 71KM POINT OF ZIRO PALIN ROAD TO RADANG Kurungkumey 4.20 6.00 10.20 2.00 8.20 10.20 100%<br />

SOLO VILLAGE VIA RAKSO, (20.00KM) (FC=0-2km)<br />

19 ROAD FROM CHAMABANG TO KAMRUNG-II VIA RINGTE- Kurungkumey 1.98 0.00 1.98 0.00 0.00 0%<br />

BOMALAPPA (22.00 KM)(S&I =22 km)<br />

20 ROAD FROM PANIA TO KAMPORIJO VIA KAMBING, BOJO, TAYO, Kurungkumey 4.00 6.00 10.00 2.00 8.00 10.00 100%<br />

LENGDING, RESTORING ETC (20.00 KM) (Improvement <strong>of</strong> road from<br />

New Palin to Panya, 15km (Bybuildozer))<br />

21 ROAD FROM AMJI (IN PALIN) TO SEYA (IN ZIRO) 30.00 KM (S & Kurungkumey 1.50 0.00 1.50 0.00 0.00 1.50 1.50 100%<br />

I=30km)<br />

22 ROAD FROM KURUNG BRIDGE POINT TO NANGRAM (C/o Internal Kurungkumey 8.65 22.00 30.65 0.00 0.00 30.65 30.65 100%<br />

road at Yangte Circle Headquarter (3.00 km) (SH:- F/C-3.00 Km).)<br />

23 REALIGNMENT OF ROAD FROM CHOLLO BRIDGE POINT TO<br />

SANGO. (C/o Approach road to Dari ME School (SH: FC-1.00 Km))<br />

Kurungkumey 4.20 5.98 10.18 1.00 9.18 10.18 100%


24 TAMEN - TALI ROAD (130 KM) (FC=59.00-61.00 Km from Harin river Kurungkumey 9.35 13.97 23.32 23.32 23.32 100%<br />

towards Tali)<br />

25 ROAD FROM LUBA TO MENGI KABAK - UPTO KAMALA RIVER Kurungkumey 3.50 34.54 38.04 1.00 7.33 8.33 22%<br />

(8.00 KM) FC=0-2.00 km<br />

26 FC=2.00 - 4.00 km Kurungkumey 5.60 19.00 24.60 10.00 10.00 41%<br />

27 ROAD FROM OLD DARI TO RAJUNG VIA GULLING, JORU & RISSI Kurungkumey 16.75 21.42 38.17 0.00 16.00 15.00 31.00 81%<br />

VILLAGE (11.00 Km)(C/o <strong>of</strong> road from Old Dari to Rajung via Gulling, Joru<br />

& Rissi village (11.00 km) (Ph-I, Sh: FC - 0.00 to 1.620 km)<br />

Sub-Total 138.05 224.16 362.21 0.00 58.10 240.48 298.58 82%<br />

Bridges<br />

Name <strong>of</strong> circle : Naharlagun Civil Circle<br />

Name <strong>of</strong> Division : Sangram Division<br />

NS/02 NYAPIN - CHIAYANGTAJO ROAD (22.00 KM)<br />

Kurungkumey<br />

1 C/o RCC/Steel Bailey bridge over river Chollo (60 ft.) Kurungkumey 15.40 23.05 38.45 0.00 10.00 28.45 38.45 100%<br />

2 C/o RCC bridge over river Soke at 2.50km (10 mtrs span) Kurungkumey 4.10 5.98 10.08 0.00 9.68 0.40 10.08 100%<br />

3 NS/07 SANGRAM -NYAPIN ROAD (38.00 KM) Kurungkumey<br />

4 C/o Bridge over river Pathor at Ch:1.36 km (span-12m) Kurungkumey 7.10 11.02 18.12 10.10 10.10 56%<br />

5 C/o Bridge over river Paya at CH 22 Km (Span = 24 KM) Kurungkumey 15.50 12.00 27.50 17.50 17.50 64%<br />

TAMEN TALI ROAD (130.00 KM)<br />

Kurungkumey<br />

6 C/o bridge at Ch:27.8km (span=20m) Kurungkumey 20.89 11.99 32.88 20.85 20.85 63%<br />

SUB TOTAL = 62.99 64.04 127.03 0.00 19.68 77.30 96.98<br />

Suspension bridges<br />

Name <strong>of</strong> circle : Naharlagun Civil Circle<br />

Name <strong>of</strong> Division : Sangram Division<br />

FOOT SUSPENSION BRIDGES UNDER SANGRAM DIVISION.<br />

1 C/o S/Bridge over river Kamala on Dhahill Top to Chambang Porter Track Kurungkumey 2.28 0.00 2.28 0.00 0.00 0.00 0.00 0%<br />

(span - 200m)(SH:-S&I)<br />

2 C/o S/Bridge over river Khru in between Sawaring and Sarli town (span -100m) Kurungkumey 8.00 10.99 18.99 0.00 10.00 0.00 10.00 53%<br />

3 C/o S/Bridge over river Khru in between Sawaring and Sarli town (span - Kurungkumey 10.70 13.99 24.69 0.00 10.00 7.00 17.00 69%<br />

100m) Sarli Circle (span -120m)<br />

4 C/o wire rope suspension bridge between Chambang to old Ziro Porter Track Kurungkumey 14.20 21.01 35.21 25.00 25.00 71%<br />

over Kuru river (Span=100m)<br />

5 C/o Wire Rope suspension bridge between New Palin to Chambang porter track Kurungkumey 15.30 19.99 35.29 30.00 30.00 85%<br />

(span 100 mtr)


6 C/o wire rope suspension bridge between Raisango to Luba over Kamala river Kurungkumey 15.60 20.00 35.60 20.00 20.00 56%<br />

(Span=120m)<br />

7 C/o wire rope suspension bridge over Kuru river at Pachi point between Boma Kurungkumey 13.98 22.37 36.35 25.00 25.00 69%<br />

Kamrong village and Rake village (Span=100m)<br />

8 C/o suspension bridge over river Kamala on the Dha-Hill top on Tamen-Tali Kurungkumey 12.90 15.98 28.88 0.00 10.00 18.88 28.88 100%<br />

road to Chambang P/Tracks (Span=200m)<br />

9 C/o Foot suspension bridge in between Dotlee to Tali over river Kamala. Kurungkumey 6.35 6.02 12.37 0.00 10.00 0.00 10.00 81%<br />

10 C/o Wire rope suspension bridgeover river Pado in between Doga to Mange. Kurungkumey 6.15 5.01 11.16 0.00 10.00 0.00 10.00 90%<br />

11 C/o S/Bridge over river Kurung in between Old Palin & Rissi village (span 80 Kurungkumey 12.45 17.03 29.48 0.00 10.00 19.48 29.48 100%<br />

mtr)<br />

12 C/o S/Bridge over river Paniyo between Dillang to Pell village (45.00 mtr span) Kurungkumey 10.00 15.00 25.00 0.00 24.00 1.00 25.00 100%<br />

13 C/o S/Bridge over river Paji to connect Pell to Nyapin (30.00 mtr span) Kurungkumey 8.00 12.00 20.00 20.00 20.00 100%<br />

14 C/o Foot Suspension Bridge on Porter Track from Langding Kolling to Taksing Kurungkumey 10.00 30.00 40.00 40.00 40.00 100%<br />

(80 mtr) (Leading to International Border)<br />

SUB- TOTAL = 145.91 209.39 355.30 0.00 84.00 206.36 290.36 82%<br />

Porter Track<br />

CIRCLE : NAHARLAGUN<br />

DIVISION : SANGRAM<br />

PORTER/MULE TRACKS UNDER SANGRAM DIVISION<br />

1 From Palin to Mangio (78km) Kurungkumey 2.92 0.00 2.92 0.00 0.00 2.92 2.92 100%<br />

2 From Sangram to Tali via Patting and Longro (100km) Kurungkumey 3.51 0.00 3.51 0.00 0.00 3.51 3.51 100%<br />

3 C/o PT form restoriang to Kamporijo via Kambang & Rakhe (30km) Kurungkumey 2.39 0.00 2.39 0.00 0.00 2.39 2.39 100%<br />

4 C/o PT from Joru Anchal Segment to Old Palin.(25.00 km) (PH-I- 0.00 to 9.20 Kurungkumey 3.70 1.00 4.70 0.00 0.00 4.70 4.70 100%<br />

km).<br />

5 From Parsiparlo to Tali. (HQ) (75.00 km) Kurungkumey 4.08 0.00 4.08 0.00 0.00 4.08 4.08 100%<br />

6 C/o porter track from Tali to Lendi-Kolen Circle HQ via Gyapin (80.00 km) Kurungkumey 1.20 0.00 1.20 0.00 0.00 1.20 1.20 100%<br />

7 C/O P/Track from Pipsorang to Yangte via Richik (70.00 km) Kurungkumey 8.85 10.98 19.83 0.00 0.00 19.83 19.83 100%<br />

8 C/oP/Track from Dotte to Tali (10.00 km) Kurungkumey 1.23 0.00 1.23 0.00 0.00 1.23 1.23 100%<br />

9 C/o porter track from Nayang to Rikong (50.00 km) Kurungkumey 2.08 0.00 2.08 0.00 0.00 2.08 2.08 100%<br />

10 C/o porter track from Modu to Mingi Kabak = 50.00 km Kurungkumey 3.52 0.00 3.52 0.00 0.00 3.52 3.52 100%<br />

11 From Tali to Rikhing (80.00 km) Kurungkumey 2.46 0.00 2.46 0.00 0.00 2.46 2.46 100%<br />

12 From Chambang to Tali (105.00 km) Kurungkumey 3.85 2.00 5.85 0.00 0.00 5.85 5.85 100%<br />

13 C/o Porter Track from Damin to Huri (30.00 Km) Kurungkumey 2.50 4.50 7.00 0.00 0.00 7.00 7.00 100%<br />

14 C/o Porter/Mule Track from Lengding Kolling to Taksing (40.00 Km) Kurungkumey 3.50 4.50 8.00 0.00 0.00 8.00 8.00 100%


Sub-Total 45.79 22.98 68.77 0.00 0.00 68.77 68.77 100%<br />

RIDF & CRF<br />

SANGRAM DIVISION<br />

YANGTE TO TALI ROAD (45.456 KM)<br />

1 C/o <strong>of</strong> road from Yangte to Tali Kurungkumey 103.35 40.00 143.35 0.00 55.00 88.35 143.35 100%<br />

2 Bridge over river Kamala at 33.00 km on Yangte-Tali Road Kurungkumey 16.85 25.02 41.87 0.00 0.00 0.00 0.00 0%<br />

3 Bridge over river Tus at 21.00 km on Yangte-Tali Road Kurungkumey 5.75 6.98 12.73 0.00 0.00 0%<br />

Kurungkumey<br />

SANGRAM DIVISION<br />

4 CONSTRUCTION OF ROAD FROM DARI TO CHAMBANG (40 KM) Kurungkumey 245.00 400.00 645.00 245.00 375.00 620.00 96%<br />

5 C/O ROAD FROM KOLORIANG TO DAMIN VIA PARSI PARLO (40 Km) Kurungkumey 173.20 300.00 473.20 173.20 200.00 373.20 79%<br />

Sub-Total 544.15 772.00 1316.15 0.00 473.20 663.35 1136.55 86%<br />

Total(PWD Kurung Kumey District) 936.89 1292.57 2229.46 0.00 634.98 1256.26 1891.24 85%<br />

6 Roads<br />

NAME OF CIRCLE : BASAR CIRCLE<br />

NAME OF DIVISION : DAPORIJO DIVISION<br />

SIPPI - SIGA ROAD (23.15KM)<br />

U/Subansiri<br />

1 Improvement <strong>of</strong> Road (Sh:Widening 13 - 23.15km) U/Subansiri 4.75 7.99 12.74 5.00 5.00 39%<br />

2 Slab Culvert 1.00m span 9nos in between ch.10.990km to 12.913km and 2m U/Subansiri 6.65 8.02 14.67 6.00 6.00 41%<br />

span 1no. at ch.14.830km<br />

3 Black Topping, 5.00-8.00 km U/Subansiri 4.00 6.00 10.00 0.00 0%<br />

DAPORIJO-JIGI ROAD, 30 KM<br />

U/Subansiri<br />

1 RW, BW & Culverts, 0-5 km U/Subansiri 1.13 0.00 1.13 1.10 1.10 97%<br />

2 Improvement <strong>of</strong> Road(Sh: Widening 12 - 17km) U/Subansiri 5.13 8.03 13.16 0.00 0%<br />

3 C/o Approach road from Daporijo-Jigi Road to Gorputu complex U/Subansiri 7.60 9.98 17.58 6.00 6.00 34%<br />

4 MURIMUGLI TO DAKPE ROAD, 15 KM (Widening, 0-5km,) U/Subansiri 5.60 7.99 13.59 0.00 0%<br />

5 DAPORIJO MONA ROAD, 29 KM (6 KM POINT OF DAPORIJO-ZIRO U/Subansiri 10.85 14.99 25.84 4.00 4.00 15%<br />

BRTF ROAD) (WBM & BT, 0-5 km)<br />

6 TALIHA - DUPIT - RIGIA ROAD (Improvement <strong>of</strong> Road (Sh:Widening, and<br />

U/Subansiri 7.95 10.99 18.94 0.00 0%<br />

Side drain 2.50 - 4.00 km))<br />

7 DAPORIJO-DULOM ROAD, 6.25 KM (WBM, 2.50-5.00 km & Culvert) U/Subansiri 5.10 10.02 15.12 7.00 7.00 46%<br />

KABASA NALLAH-MARA ROAD, 20 KM


8 WBM, 0-3.50 Km, Re-alignment from Bungne-Mara Portion U/Subansiri 2.59 0.00 2.59 0.00 0%<br />

9 WBM, 0.80-2.50 Km (Ph-II) U/Subansiri 1.53 0.00 1.53 0.00 0%<br />

LIGU-MITE TO JIGI ROAD, 25 KM<br />

10 Formation cutting, 12.30-15.00 Km (Ph-VI) U/Subansiri 4.10 7.01 11.11 7.00 7.00 63%<br />

11 Improvement <strong>of</strong> Road (Sh:Widening,6 -9km) U/Subansiri 1.95 2.98 4.93 4.90 4.90 99%<br />

12 DULOM HYDEL TO TANIYUM-GEKO VIA RAPENIMA, 10<br />

U/Subansiri 8.00 10.18 18.18 2.00 2.00 11%<br />

KM(Formation cutting, (6.00-8.00 Km) & Culvert)<br />

13 RAGO TO MARA ROAD (GYADU AREA), 30 KM (Formation cutting, 7- U/Subansiri 3.55 5.99 9.54 4.00 4.00 42%<br />

9.50 km, Ph-III)<br />

14 GIGI TO BAJA ROAD, 4 KM (Formation cutting, 3-5.50 Km (Ph-II)) U/Subansiri 2.00 2.92 4.92 0.00 0%<br />

CHETAM TO TALI VIA JEKE, NILLING, RIKUNG ROAD, 12 KM U/Subansiri<br />

15 Improvement <strong>of</strong> Gradient 0-6km (0 - 2.5km) U/Subansiri 3.50 4.99 8.49 3.00 3.00 35%<br />

16 Improvement <strong>of</strong> Gradient 0-6km (2.5 - 4.5km) U/Subansiri 3.05 3.99 7.04 3.00 3.00 43%<br />

17 TAPAPU TO GIBA ROAD (Formation cutting, 6.62-8.00 Km (Ph-V)) U/Subansiri 3.00 4.00 7.00 7.00 7.00 100%<br />

18 MAGRIA TO SIRKOM VIA HINA ROAD, 35 KM (Formation cutting, 0-5 U/Subansiri 8.00 13.98 21.98 8.00 8.00 36%<br />

km, Ph-I)<br />

19 NITTING TO TALI ROAD, 5 KM (25 KM POINT OF BRTF ROAD)<br />

(Formation cutting, 4 - 5 km, Ph-III(Formation cutting, 4 - 5 km, Ph-III)<br />

U/Subansiri 4.35 7.01 11.36 0.00 0%<br />

20 YUPOM TO GIBA VIA LINGDUM, 20 KM (Formation cutting, 0-3 Km (Ph- U/Subansiri 4.75 7.00 11.75 6.00 6.00 51%<br />

I))<br />

21 ROAD FROM TALIHA NACHO BRTF ROAD RIGHT BANK OF U/Subansiri 2.85 2.99 5.84 5.80 5.80 99%<br />

SUBANSIRI BRIDGE (Approach road from Tajina Bridge to Sissi village<br />

(Left Bank) 2.00km (Sh:Hume Pipe Culvert, Retaining and Breast Wall))<br />

22 MENGA MAIN POINT TO DIGNIUM, 7 KM (22 KM POINT OF BRTF U/Subansiri 8.70 12.01 20.71 19.81 19.81 96%<br />

ROAD) (Formation cutting, 0-3 Km (Ph-I))<br />

23 TAJINA-PAKTUNG TO PAKBA ROAD, 45 KM (Formation cutting, 5-9 U/Subansiri 2.99 0.00 2.99 0.00 0%<br />

Km (Ph-II))<br />

24 BRTF ROAD TO YEBA VIA GINGBA, 30 KM(Formation cutting, 0-1 Km U/Subansiri 2.65 3.01 5.66 2.50 2.50 44%<br />

(Ph-I)<br />

25 ANGO LOMDAK TO SIKKIPUTU VIA PEGALOMDAK & GICHI, 25 U/Subansiri 2.68 0.00 2.68 2.65 2.65 99%<br />

KM (Soling, RW, BW and culverts, 0-1.50 km)<br />

26 SISSI-NUNGNU VIA PAKPUMALING, 30 KM (Formation cutting, 5-7 Km U/Subansiri 6.15 7.99 14.14 0.00 0%<br />

(Ph-III))<br />

27 SISSI TO NUNGNU VIA PAKPU NALLAH (Formation cutting, 0-1 km (Ph U/Subansiri 2.85 2.00 4.85 0.00 0%<br />

I)<br />

28 NIDAK TO DUI, 22 KM (Formation cutting, 0-2 km (Ph-I)0 U/Subansiri 7.50 9.99 17.49 0.00 0%


29 ERU TO RAI VIA KAMPONGCHIPPI, 30 KM (Formation cutting, 0-2 Km U/Subansiri 2.35 2.52 4.87 0.00 0%<br />

(Ph-I))<br />

DAPORIJO TOWNSHIP ROAD<br />

U/Subansiri<br />

30 Approach road to newly constructed SWR sus bridge for 3wheeler near HSS at U/Subansiri 3.55 5.99 9.54 5.00 5.00 52%<br />

Daporijo<br />

31 Sh:Metalling and Black Topping, 5km (New Market) U/Subansiri 5.65 9.02 14.67 7.00 7.00 48%<br />

32 Improvement <strong>of</strong> Road from Sigen Bridge to BRTF Road via SE, IFCD Office & U/Subansiri 4.50 10.00 14.50 8.00 8.00 55%<br />

Power Division, 1km (Sh:Soling, metalling and Slab Culvert)<br />

33 C/o Impvt. Of Daporijo township road <strong>of</strong> lower belt (SH: WBM, BT, CC Drain, U/Subansiri 15.00 32.00 47.00 25.00 25.00 53%<br />

Culverts & R/Wall)<br />

TALIHA TOWNSHIP ROAD<br />

U/Subansiri<br />

34 Improvement <strong>of</strong> Township road, Sh: 0.200 km, Solling, Slab Culvert, R/Wall, U/Subansiri 5.15 6.98 12.13 0.00 0%<br />

B/Wall.<br />

35 Retaining wall at Taliha township near CO Office 90m U/Subansiri 1.23 0.00 1.23 1.20 1.20 98%<br />

36 DAPORIJO-BOMIKATO TO KICHO ROAD, 25 KM (Formation cutting, 0 U/Subansiri 4.70 7.99 12.69 12.50 12.50 99%<br />

2.50 Km (Ph-I))<br />

37 NACHO TOWNSHIP ROAD (Improvement <strong>of</strong> Township Road at Nacho U/Subansiri 4.95 9.98 14.93 14.93 14.93 100%<br />

(3km) (Sh:Solling, Metalling & Slab culvert))<br />

NUTE TO JITU VIA REBI ROAD, 20 KM<br />

U/Subansiri<br />

38 Formation cutting, 0-3 km (Ph-I) U/Subansiri 4.99 0.00 4.99 4.70 4.70 94%<br />

39 Formation cutting, 3-6 km (Ph-II) U/Subansiri 4.60 6.98 11.58 5.00 5.00 43%<br />

40 NACHO TO TUNGMURI, 4 KM (Formation cutting, 4 km) U/Subansiri 8.60 10.00 18.60 4.00 4.00 22%<br />

41 NABA TO NILO, 3 KM (Formation cutting, 0-2 Km (Ph-I)) U/Subansiri 2.80 3.52 6.32 0.00 0%<br />

42 RIGIA TO DUCHOK, 14 KM (Formation cutting, 7.5 to 10.50km) U/Subansiri 4.95 -0.01 4.94 0.00 0%<br />

43 LEPAJARING TO NGUTE VIA GYSING, 10 KM (Formation cutting, 0-3 U/Subansiri 3.20 3.98 7.18 0.00 0%<br />

Km (Ph-I))<br />

44 SIYUM TOWNSHIP ROAD (Approach road to CO Office from BRTF road, U/Subansiri 2.15 3.00 5.15 0.00 0%<br />

Formation cutting, 0.78-1.80 Km (Ph-II))<br />

45 BRTF ROAD (NOH BRIDGE) TO MARKIA, 30 KM (Formation cutting, 0- U/Subansiri 3.00 4.65 7.65 0.00 0%<br />

3 km)<br />

46 LITEN (SIGA) TO MARKIA VIA LOTE, HINA, RUJI, DABO, SEBING U/Subansiri 9.60 14.01 23.61 8.00 8.00 34%<br />

AND DAI, 25 KM (Formation cutting, 2 - 5km, Phase-II)<br />

Sub-Total 236.47 322.66 559.13 200.09 0.00 0.00 200.09<br />

NAME OF CIRCLE : BASAR CIRCLE<br />

NAME OF DIVISION : DUMPORIJO DIVISION<br />

MARO - HAIDER ROAD, ( 10.50 KM.)


47 WBM & B/T, 0-3.00 km. U/Subansiri 3.18 5.98 9.16 0.00 0%<br />

48 C/O Addl. Cul, (SH: S/Cul=7 Nos.) 2m span). U/Subansiri 2.85 1.98 4.83 4.80 4.80 99%<br />

49 Met & B/T, 3-10.50km U/Subansiri 3.20 4.80 8.00 8.00 8.00 100%<br />

PAKARIJO ARANALO ROAD,(30KM.)<br />

U/Subansiri<br />

50 F/C, 16-26 km. U/Subansiri 35.80 64.02 99.82 25.00 25.00 25%<br />

51 F/C, 26 - 28 km. U/Subansiri 2.50 2.99 5.49 0.00 0%<br />

52 DUMPORIJO-HALI ROAD (50KM) (FC, (19.50-38.00 KM)) U/Subansiri 14.00 19.98 33.98 25.00 25.00 74%<br />

53 TAPI - TODE - BARIRIJO ROAD (15KM) (Imprvmt <strong>of</strong> curves & gradient U/Subansiri 2.90 4.01 6.91 4.00 4.00 58%<br />

at various reaches (0-3)km.)<br />

54 ROAD FROM SUBANSIRI BRIDGE TO BUI ULI ROAD (25KM) (F/C U/Subansiri 2.00 2.95 4.95 4.80 4.80 97%<br />

(22 -23 km) Ph-VIII))<br />

55 ROAD FROM BORA - RUPAK TO BARI - RIJO ROAD, (18 KM.) (F/C U/Subansiri 4.90 6.99 11.89 6.00 6.00 50%<br />

(10.50-12.00km), Ph - III)<br />

ROAD FROM HAJI - RUMTE BARI RIJO ROAD, (40 KM.)<br />

U/Subansiri<br />

56 F/C, Culverts, 0 - 6km. U/Subansiri 8.05 13.07 21.12 5.00 5.00 24%<br />

57 F/C, Cul, 6.00 - 9.00 km., Ph-II U/Subansiri 8.00 12.02 20.02 10.00 10.00 50%<br />

58 ROAD FROM BARIRIJO - RIKO - KULO ROAD, (30 KM.) (F/C 9.00 - U/Subansiri 4.80 7.18 11.98 5.00 5.00 42%<br />

10.20 km)<br />

59 ROAD FROM LUCHI TO LIROMOBA VIA SILLUKORO (8 KM.)( F/C, U/Subansiri 6.20 8.72 14.92 5.00 5.00 34%<br />

(5.00 - 8.00 km.))<br />

60 ROAD FROM BARIRIJO RUMTE ROAD 16KM. (F/C 0.0 - 2.00 km Ph- U/Subansiri 6.50 10.48 16.98 8.00 8.00 47%<br />

I.)<br />

61 ROAD FROM 2KM POINT ON DUMPORIJO HALI ROAD TO<br />

U/Subansiri 10.00 15.03 25.03 10.00 10.00 40%<br />

JONEMURI ( 16KM) (F/C, 0.0 - 3.0 km, Ph-I)<br />

62 ROAD FROM LEBE - GEKO TO NUK (20 KM). (F/C, 3.00 - 5.00 km) U/Subansiri 2.50 3.76 6.26 3.00 3.00 48%<br />

63 MARO - LUCHI ROAD (16 KM.) (F/C, Culvert & Drains, 0.0-3.0 km) U/Subansiri 3.20 5.26 8.46 4.00 4.00 47%<br />

64 ROAD FROM RCC BRIDGE POINT OF BRTF ROAD TO BELO PRY. U/Subansiri 7.20 10.76 17.96 10.60 10.60 59%<br />

SCHOOL VIA BELO VILLAGE ( 2.50 KM.) (Sol, Met, Cul, P/Drain,<br />

1.50km)<br />

65 PAKA GONGO N.T. ROAD (S&I for relignment <strong>of</strong> Paka Gongo NT Road U/Subansiri 1.64 0.00 1.64 1.60 1.60 98%<br />

18.00km)<br />

66 ROAD FROM ARANALO TO GITEBAGE VIA POMTEBEGE ( 8KM.) U/Subansiri 2.80 4.18 6.98 2.00 2.00 29%<br />

(F/C, 0.0 - 3.0 km)<br />

67 ROAD FROM LAKBAK GONGO TO DIPU GONGO (3.00 KM) (R/Wall,<br />

B/Wall, Soling, Metalling and Carpeting)<br />

U/Subansiri 9.55 19.51 29.06 0.00 0%


68 RESTORATION OF FLOOD DAMAGES UNDER DUMPORIJO U/Subansiri 3.60 5.34 8.94 4.00 4.00 45%<br />

DIVISION (Restoration <strong>of</strong> Flood damages under Dumporijo Division during<br />

2004-05)<br />

Sub- Total = 145.37 229.01 374.38 145.80 0.00 0.00 145.80<br />

Bridges<br />

NAME OF CIRCLE : BASAR CIRCLE<br />

NAME OF DIVISION : DAPORIJO DIVISION<br />

KEOJARING TO CHARUKE (25KM)<br />

1 C/o Steel Suspension Bridge over Subansiri River near Keojaring (span 130 U/Subansiri 6.00 9.00 15.00 5.00 5.00 33%<br />

mtr) (Sh: S&I)<br />

LITEN (SIGA) TO MARKIA VIA LOTE, HINA, RUJI, DABO, SEBING<br />

AND DAI, 25 KM<br />

2 C/o RCC Bridge on Sera Nallah at Ch. 1.50km (span 14m) U/Subansiri 14.75 22.98 37.73 0.00 0%<br />

NAME OF CIRCLE : BASAR CIRCLE<br />

NAME OF DIVISION : DUMPORIJO DIVISION<br />

PAKARIJO-ARANALO ROAD<br />

3 C/o RCC Bridge over river Jiddikoro at Dera Nalo at Ch - 12.50 km (Span - 30 U/Subansiri 17.30 25.08 42.38 0.00 0%<br />

Mtr).<br />

TAPI TODE BARIRIJO ROAD ( 15KM)<br />

4 C/O Steel bailey Bridge over Ruk Nallah at Ch:-0.50 km (Span-30 mtrs) U/Subansiri 15.50 28.01 43.51 0.00 0%<br />

SUB TOTAL = 53.55 85.07 138.62 5.00 0.00 0.00 5.00<br />

Suspension Bridges<br />

CIRCLE : BASAR<br />

DIVISION : DAPORIJO<br />

FOOT SUSPENSION BRIDGES UNDER DAPORIJO DIVISION<br />

1 Re-construction <strong>of</strong> Suspension bridge at Charto over Subansiri river(101m) U/Subansiri 1.25 0.00 1.25 1.20 1.20 96%<br />

2 Re-construction Suspension bridge at Mering Mara over Nengo Koro River U/Subansiri 4.09 0.00 4.09 4.00 4.00 98%<br />

(119m)<br />

3 Re-construction Suspension bridge at Nimpu to Lingri over Silen river (128m) U/Subansiri 5.71 0.00 5.71 5.65 5.65 99%<br />

4 Re-construction Suspension bridge at Lapasam over subansiri river (136m) U/Subansiri 5.32 0.00 5.32 0.00 0%<br />

5 Re-construction Suspension bridge at Lingri to Kamlo over Silen rivr (71m) U/Subansiri 1.53 0.00 1.53 1.50 1.50 98%<br />

6 Re-construction Suspension bridge at Dagam over Subansiri river (82m) U/Subansiri 1.55 0.00 1.55 1.50 1.50 97%


7 Re-construction Suspension bridge at Rigia to Duchok over Mio Nallah (Span U/Subansiri 2.64 0.00 2.64 2.60 2.60 98%<br />

111m)<br />

8 Re-construction Suspension bridge from Darba to Papa over Saching river(Span U/Subansiri 4.94 0.00 4.94 0.00 0%<br />

82m)<br />

9 Special Repair <strong>of</strong> Foot Suspension bridges under Taliha circle U/Subansiri 1.73 0.00 1.73 1.70 1.70 98%<br />

10 Special Repair <strong>of</strong> Foot Suspension bridges and Porter Tracks under Nacho U/Subansiri 15.64 0.00 15.64 5.00 5.00 32%<br />

circle<br />

11 C/o FSB over river Sigen in between Hankar to Yetor/Mite (span 60m) U/Subansiri 5.00 0.00 5.00 5.00 5.00 100%<br />

12 Special Repair <strong>of</strong> Foot Suspension bridges under Siyum, Limeking & Taksing U/Subansiri 15.00 25.00 40.00 10.00 10.00 25%<br />

Circle (span 970m) 30nos<br />

13 Improvement <strong>of</strong> Foot Suspension Bridge on Porter Track under Nacho U/Subansiri 20.00 50.00 70.00 25.00 25.00 36%<br />

Administrative HQ (400 mtr)<br />

14 C/o Log Bridge on Porter/Mule Track under Nacho Administrative HQ (945 U/Subansiri 5.00 7.32 12.32 12.00 12.00 97%<br />

mtr) (leading to International Border)<br />

SUB- TOTAL 89.40 82.32 171.72 75.15 0.00 0.00 75.15<br />

CIRCLE : BASAR<br />

DIVISION : DUMPORIJO<br />

SUSPENSION BRIDGE UNDER DUMPORIJO DIVISION<br />

15 C/O Foot Suspension Bridge over Sie river to connect Kulo village with U/Subansiri 4.00 5.00 9.00 3.00 3.00 33%<br />

Barerijo (Span-45mtrs.)<br />

16 C/O Foot Suspension bridge over river Siyum at Beak-rijo, ( Span :80mtrs) U/Subansiri 5.00 5.00 10.00 4.00 4.00 40%<br />

SUB-TOTAL 9.00 10.00 19.00 7.00 0.00 0.00 7.00<br />

Porter Track<br />

CIRCLE : BASAR<br />

DIVISION : DAPORIJO<br />

PORTER TRACK UNDER DAPORIJO DIVISION<br />

1 C/o Porter Track for Army Petrolling from Low Baliza to High Baliza (20.00 U/Subansiri 8.00 12.00 20.00 0.00 0%<br />

Km)<br />

2 Improvement <strong>of</strong> gradient from Orak to avoid Sera Thapa (10.00 Km) U/Subansiri 7.00 0.00 7.00 0.00 0%<br />

3 Re-construction from 'G' Naik to Taksing HQ (20.00-51.00 Km) U/Subansiri 5.42 0.00 5.42 0.00 0%<br />

4 C/o Porter/Mule Tracks from TCC to Assapila (91.00 Km) U/Subansiri 5.00 15.00 20.00 0.00 0%<br />

Sub-Total 25.42 27.00 52.42 0.00 0.00 0.00 0.00<br />

CIRCLE : BASAR


DIVISION : DUMPORIJO<br />

PORTER TRACK UNDER DUMPORIJO DIVISION<br />

5 Porter Track from Baririjo to Gensi via Riko 25 km. U/Subansiri 1.08 0.00 1.08 1.00 1.00 93%<br />

6 PT from Baririjo to Haji via Rumte & Dego village - 15 Km U/Subansiri 1.50 1.98 3.48 1.50 1.50 43%<br />

7 PT from Riddi to Upper Dugi via Old Lida - 15 Km U/Subansiri 1.50 1.98 3.48 1.50 1.50 43%<br />

8 PT from Uli village to Gusar Circle H/Q - 15 Km U/Subansiri 1.50 1.98 3.48 1.50 1.50 43%<br />

9 C/o Mule Track From Gusar Village to Gusar Circle Hq 6.00Km U/Subansiri 2.50 3.01 5.51 2.50 2.50 45%<br />

10 C/o Porter Track from (Sigi) Gusar C.O. HQ to Nidak/Nipu (15.00 Km) U/Subansiri 1.50 1.98 3.48 1.50 1.50 43%<br />

11 PT from Laigi to Dipu Gongo - 15 Km U/Subansiri 1.50 1.98 3.48 1.50 1.50 43%<br />

12 PT from Labri to Dipu Gongo - 15 Km U/Subansiri 1.50 1.98 3.48 1.50 1.50 43%<br />

13 Special repair <strong>of</strong> Porter Tracks and Suspension Bridges under Dumporijo U/Subansiri 0.35 0.00 0.35 0.00 0%<br />

Division during 04-05<br />

Sub- Total 12.93 14.89 27.82 12.50 0.00 0.00 12.50<br />

NLCPR<br />

NAME OF CIRCLE : BASAR CIRCLE<br />

NAME OF DIVISION : DAPORIJO DIVISION<br />

1 Constuction <strong>of</strong> Steel Suspension Bridge over Subansiri river near Siyum (span U/Subansiri 39.05 40.01 79.06 79.06 79.06 100%<br />

174.00 Mtr)<br />

2 Improvement and Upgradation <strong>of</strong> Menga-Giba Road (8.00 Km) U/Subansiri 30.65 0.02 30.67 0.00 0%<br />

Sub- Total 69.70 40.03 109.73 79.06 0.00 0.00 79.06<br />

Total (PWD : Upper Subansiri District) 641.84 810.98 1452.82 524.60 0.00 0.00 524.60<br />

7 ROADS<br />

Name <strong>of</strong> Circle:- BASAR CIRCLE<br />

Name <strong>of</strong> Division:- Basar Division<br />

1 EGO-DARING-ZIRDO-KOYU ROAD (17.00 KM.) (Soling, Metalling &<br />

Carpeting & Drain/ Culvert 7.00 to 9.00 Km)<br />

2 TAI LIROMOBA ROAD 22.00 KM (UNDER BASAR DIVISION 0-10.00<br />

KM.) (C.C.Drain 10.70 km. ( from Tirbin end))<br />

3 BASAR-SAGO-PIRI ROAD (26.00 KM) (C/o RCC Slab Culvert 2.00 Mtr<br />

Span 1 No. at Tumru Nallah in between 0 to 8.00 Km & R/Wall & B/Wall<br />

20.00 mtr in between 0 to 8,00 Km)<br />

West Siang 14.60 21.02 35.62 0.00 0%<br />

West Siang 1.60 1.97 3.57 3.50 3.50 98%<br />

West Siang 1.00 2.52 3.52 0.00 0%


4 RAGI DOKE YOMCHA ROAD 26.00 KM. ( 23 .40 KM.UNDER BASAR West Siang 2.40 0.01 2.41 0.00 0%<br />

DIVISION)(WBM & BT 0.00 to 3.00 km (Tirbin end))<br />

5 BASAR PAGI - DISI - RIMI ROAD, (27KM). (FC- 6-10 km. (Rimi end)) West Siang 4.00 6.28 10.28 0.00 0%<br />

6 BRTF ROAD CHEKOR LOMBI TO BADAK ROAD 25.00 KM. (Soling West Siang 5.70 7.98 13.68 0.00 0%<br />

0.00 - 3.00 km. Phase-I (0.00 - 2.50 km))<br />

ROAD FROM DURPAI TO DIPA, (120KM.)<br />

West Siang<br />

7 Solling,WBM & B/T, 0 -2 km(towards Durpai) West Siang 4.00 8.45 12.45 0.00 0%<br />

8 C/O Approach road to the bridge connecting Dipa ME school West Siang 3.85 5.41 9.26 0.00 0%<br />

9 Compensatory afforestation for diversion <strong>of</strong> Forest Land for Construction <strong>of</strong> West Siang 1.50 0.00 1.50 0.00 0%<br />

East West highway.<br />

GENSI - TARAMORI ROAD<br />

West Siang<br />

10 RCC Slab Culvert 3 Nos 6m span West Siang 2.35 3.99 6.34 0.00 0%<br />

11 Soling (16.00 to 17.00 km) West Siang 2.35 4.02 6.37 0.00 0%<br />

12 R/Wall,B/Wall, Humepipe Cul, Drain (0 to 5.00 km.) West Siang 1.10 1.99 3.09 0.00 0%<br />

13 Soling, 5.00 to 9.50 KM West Siang 3.00 3.93 6.93 0.00 0%<br />

14 S/Cul 1 Mtr. span-5 Nos. (20.00 to 25.00 Km ) West Siang 2.85 3.99 6.84 0.00 0%<br />

TARAMORI TO SIBERITE(50.00KM.) West Siang 0.00<br />

15 F/C 20 - 30KM. West Siang 2.50 0.03 2.53 0.00 0%<br />

16 C/O road from Tango village to Siberite F/C 7.00 Km (Ph-I 1.00 Km) West Siang 3.10 4.67 7.77 0.00 0%<br />

NYODU - SIBE- SIRU ROAD (17 KM.) West Siang 0.00<br />

17 F/C 9.00 - 12.00 km. West Siang 3.00 4.04 7.04 0.00 0%<br />

18 F/C 17.00 - 18.00 Km West Siang 7.05 10.57 17.62 17.56 0.00 0.00 17.56 100%<br />

19 ROAD FROM CHISI TO BOMTE (32 km) (F/C, 0 - 2km.) West Siang 4.00 8.63 12.63 0.00 0%<br />

20 PIRI-RINA KOYU ROAD(25KM.) (F/C 0 - 2.00km) West Siang 4.00 8.44 12.44 0.00 0%<br />

21 ROAD FROM KAGI-GADI TO TIRBIN 12.00 KM. (Sol & Met 3.00 km. West Siang 6.10 4.02 10.12 0.00 0%<br />

(Sub Ch. Sol-1.60 km.))<br />

22 LUTAK-TERI TO NGENSI [3.00 KM] (Formation Cutting 3.00 to 5.00 km West Siang 5.20 7.79 12.99 0.00 0%<br />

(Ph-II))<br />

23 ROAD TO MOBA LIPU DOKE (10.00 KM) (WBM & BT 1.50 km.) West Siang 3.40 4.98 8.38 0.00 0%<br />

ROAD TO MALINITHAN AT LIKABALI, (1.80KM.)<br />

West Siang<br />

24 Impvt. Of approach road from Malini village to Malini Mandir (Sh:- WBM & West Siang 4.00 5.61 9.61 0.00 0%<br />

BT) 1.00 km length.<br />

25 C/O Slab Culvert 6 Mtrs. Span 1 No. & 2 Mtrs. Span 1 No. on approach road to West Siang 4.00 6.06 10.06 5.00 5.00 50%<br />

Milini Village.<br />

26 ROAD FROM GORI TO PUSHI DOKE VILLAGE (10KM) (F/C= 0 -<br />

4km.)<br />

West Siang 1.60 2.43 4.03 0.00 0%


ROAD FROM TAI-LIROMOBA PWD ROAD TO RATAK-GAMLIN TO West Siang<br />

ESSI-LIPU VILLAGE<br />

27 Formation cutting : 0-3.00 km. West Siang 2.26 0.00 2.26 2.26 2.26 100%<br />

28 Widening & Improvement <strong>of</strong> geometrics 0.00 - 15.00 km. West Siang 2.00 2.50 4.50 0.00 0%<br />

29 BRTF ROAD TO GAKO DAPO ROAD (1.50 KM)(WBM & BT (0.00 - 1.50 West Siang 1.65 2.40 4.05 0.00 0%<br />

km))<br />

LIKABALI TOWNSHIP ROADS West Siang 0.00<br />

30 C/O road from teacher's colony <strong>of</strong> <strong>Govt</strong>. H.S school to Science Lab 1km Sh: West Siang 2.50 0.03 2.53 0.00 0%<br />

Filling, Cul, WBM & BT-1km<br />

31 C/O cement concrete Drain at Likabali township.2.00 Km. West Siang 3.60 5.47 9.07 0.00 0%<br />

32 C/O Township road at Lower colony (Ph:-II WBM & BT-0.500 km.) West Siang 1.50 2.99 4.49 0.00 0%<br />

TIRBIN TOWNSHIP ROAD West Siang 0.00<br />

33 C/O Approach road from BRTF road to <strong>Govt</strong>. H.S. School Tirbin (SH:- S/Cul West Siang 2.70 4.06 6.76 0.00 0%<br />

4.00 mtr span-1 No. at ch. 0.250 km)<br />

34 C/O Approach road from BRTF road to <strong>Govt</strong>. H.S. School Tirbin (SH:- F/C- West Siang 1.80 2.76 4.56 4.50 4.50 99%<br />

0.500 km)<br />

35 ROAD FROM KAGI TO GADI MISHI (15.00 KM) (F/C 2.00-5.00 km.(PH: -West Siang 7.20 10.99 18.19 18.19 18.19 100%<br />

II 1.50 - 3.70 km))<br />

36 TOWNSHIP ROAD AT GENSI. ( 2 KM) (SH:- WBM & B/T-2.00km) West Siang 2.01 0.00 2.01 0.00 0%<br />

37 ROAD FROM 10 KM POINT OF DURPAI ROAD TO TO KANKU CO West Siang 2.02 0.00 2.02 0.00 0%<br />

HQ(20KM) (S & I I/c formation cutting 0 - 5km.(From Kanku))<br />

38 ROAD FROM LITEMORI TO PAIMORI VIA LIDUK (20KM) West Siang 3.00 4.24 7.24 7.20 7.20 99%<br />

(Formation Cutting 0 to 2.00 km)<br />

39 APPROACH ROAD TO COMMUNITY HALL AT OLD BAM VILLAGE West Siang 1.67 0.00 1.67 1.67 1.67 100%<br />

(Soling , metalling & culvert(1.50 km))<br />

40 ROAD FROM ESSI-RITE TO YASE VIA RICHI & YORDO VILLAGE - West Siang 1.00 2.01 3.01 0.00 0%<br />

7.00 KM (Formation cutting 0.00 - 2.00 km (Sub Ch:-0.00 - 1.20 km))<br />

Sub- Total 133.16 176.28 309.44 59.88 0.00 0.00 59.88<br />

Name <strong>of</strong> Circle : Along Civil Circle<br />

Name <strong>of</strong> Division : Along PW Division<br />

KOMBO-TADIN-NGOMDIR ROAD (27 KM)<br />

41 F/C, Drain & Culvert; 15-21 Km West Siang 6.00 8.62 14.62 14.62 14.62 100%<br />

42 S/Cul- 4Nos <strong>of</strong> 2 Mtrs span & 6 Nos <strong>of</strong> 1Mtr span West Siang 5.30 7.56 12.86 12.86 12.86 100%<br />

43 F/C 7.00-9.50 Km West Siang 10.00 15.42 25.42 25.42 25.42 100%


44 ROAD FROM ALONG TO VKV SCHOOL VIA BOGDO 16 MADRAS West Siang 1.65 1.99 3.64 3.64 3.64 100%<br />

REGIMENT (F/C; 0-2.00Km)<br />

45 GOTU HAMLET TO BRTF RAOD VIA DARKA - MOBUK (Sol,WBM & West Siang 5.15 8.00 13.15 13.15 13.15<br />

BT ; 0 - 2.35 Km0<br />

NYORAK NIKTE ROAD (6.00 KM)<br />

West Siang<br />

46 F/C; 4.00 - 6.00 Km West Siang 3.15 5.00 8.15 8.15 8.15 100%<br />

47 F/C; 6.00 - 8.00 Km West Siang 4.25 5.99 10.24 10.24 10.24 100%<br />

48 ROAD FORM NGOMDIR TO BEYE (15KM) (F/Cutting (7.00-10.00 Km) West Siang 9.90 13.02 22.92 16.85 16.85 74%<br />

49 ROAD FROM ESHI-MOKU TO NIKTE (8 KM) (F/C; 2.00 - 4.00 Km) West Siang 5.60 8.40 14.00 0.00 0.00 0%<br />

ALONG TOWNSHIP ROADS<br />

West Siang<br />

50 Impvt. <strong>of</strong> road from DC Office to 26th A/Rifle (SH: R/W-100mtrs,B/W - West Siang 3.20 4.82 8.02 0.00 2.94 5.08 8.02 100%<br />

50Mtrs,Widn.i/c WBM& BT-1.50Km)<br />

51 Road from BRTF road to IB via Civil Supply stores and RWD Garrage (SH: West Siang 3.00 4.47 7.47 0.00 2.26 5.21 7.47 100%<br />

Embankment, Soling, WBM, BT & Culvert- 0.60 Km)<br />

52 C/o Lane 2 at Bogdo-0.40 Km (SH: Embankment-0.10 Km, SMC-0.40 Km, West Siang 5.20 7.80 13.00 0.00 1.57 11.43 13.00 100%<br />

S/Cul 1 m span-2 Nos & P/Drain-0.35 Km<br />

53 Pakam area to the BRTF road through Assam Riffle Complex crossing Sipu West Siang 5.60 8.40 14.00 0.00 2.47 11.53 14.00 100%<br />

river (S/Cul-6 mtr span, Protectin work & Approach Road)<br />

54 ROAD FROM PATUM BRIDGE POINT TO KAMBU ON LEFT BANK West Siang 2.00 0.01 2.01 2.01 2.01 100%<br />

OF SIYOM RIVER (60 KM) (S&I; 0 - 37.50 Km)<br />

55 ROAD FROM 5 MTN BRIDGE TO DEGO VILLAGE (1.00 KM) West Siang 3.65 5.02 8.67 8.67 8.67 100%<br />

(F/Cutting 0.50 km & S/Cul - 2Mtr span 1 No.)<br />

Sub- Total 73.65 104.52 178.17 0.00 9.24 148.86 158.10 89%<br />

Name <strong>of</strong> Circle :- Along Circle<br />

Name <strong>of</strong> Division :- Yomcha P.W.Division.<br />

RAGI DOKE YOMCHA ROAD (23 KM)<br />

56 Formation cutting : 40.00 - 37.00 km (Estt Ch. : 21.40-23.00 km) 3.50 3.99 7.49 7.49 7.49 100%<br />

57 C/o Slab culvert 6 mtr span with approach over river Bome stream at ch.600 West Siang 2.80 4.00 6.80 6.80 6.80 100%<br />

mtr to connect Division <strong>of</strong>fice.<br />

58 Formation Cutting, 17.00-21.40 km West Siang 18.00 27.00 45.00 28.00 3.00 31.00 69%<br />

YOMCHA DARAK ROAD (27 KM)<br />

West Siang<br />

59 Formation cutting, Culvert & Drain : 3.00 - 10.00 km (Darak end) West Siang 45.00 75.06 120.06 40.00 80.06 120.06 100%<br />

60 Wid & C/Drain 3.00 - 6.00 Km West Siang 2.99 0.00 2.99 3.00 3.00 100%<br />

61 F/C-6.00 - 8.00 Km West Siang 6.05 9.02 15.07 11.05 4.02 15.07 100%


62 ROAD FROM KEAK ON BRTF ROAD TO SISI-LIKAR (30 KM) West Siang 4.50 7.24 11.74 4.50 7.24 11.74 100%<br />

(Formation cutting : 0-5 km [keak end])<br />

ROAD FROM GANGKAK TO GADI MISHI (15 KM)<br />

West Siang<br />

63 Formation cutting; 0-2.00 km West Siang 5.00 7.57 12.57 12.57 12.57 100%<br />

64 Soling, Metalling & Carpeting 0-2.00 Km West Siang 10.60 17.00 27.60 27.60 27.60 100%<br />

65 ROAD FROM DEGO KAMKI VILLAGE TO SISI LIKAR (7.00 KM) West Siang 1.50 2.99 4.49 4.50 4.50 100%<br />

(WBM : 0-5.00 Km)<br />

66 LIROMOBA-LUCHI ROAD (24 KM) (Re-alginment (400 mtr)) West Siang 1.60 2.47 4.07 4.07 4.07 100%<br />

WAK-LIROMOBA ROAD TO MOYA RONYA VIA POKTO (15 KM)<br />

67 Formation cutting : 0 - 3.20 km. West Siang 1.20 1.94 3.14 3.15 3.15 100%<br />

68 C/o Breast Wall at Ch. 46.375 Km near Sika river West Siang 5.30 8.70 14.00 14.00 14.00 100%<br />

69 C/o Retaining Wall at Ch. 47.00 Km near Jere river West Siang 3.70 0.00 3.70 3.70 3.70 100%<br />

70 DARAK TOWNSHIP ROAD (Soling & metalling-1.50km & Blact Topping- West Siang 2.50 3.34 5.84 5.84 5.84 100%<br />

1.00 km (Ph-I)0<br />

71 C/O ROAD FROM KAMBA TO SIJIR RAKSAP (11 KM) (C/o RCC Slab West Siang 3.65 5.41 9.06 9.06 9.06 100%<br />

culvert 6 mtr. span over river Rupin and Namsi at ch. 0.40 & 1.60 km span : 6<br />

& 8 mtr. Respectively)<br />

72 KAMBA TOWNSHIP ROAD (C/o Approach road to IB & EAC <strong>of</strong>fice West Siang 3.60 5.60 9.20 5.50 3.70 9.20 100%<br />

complex at Kamba, (SH: Sol 1.50 Km))<br />

73 ROAD FROM RIME TO TEGO GAMLIN (7.00 KM) (F/Cutting (0-2.00 West Siang 7.00 10.14 17.14 17.14 17.14 100%<br />

km))<br />

Sub- Total 128.49 191.47 319.96 193.68 112.31 0.00 305.99 96%<br />

Name <strong>of</strong> Circle : Along Civil Circle<br />

Name <strong>of</strong> Division : Rumgong PW Division<br />

74 RUMGONG - BOLENG (20.65 KM)(WBM; 12.00 - 20.65 Km) West Siang 3.20 4.81 8.01 8.01 0.00 0.00 8.01 100%<br />

75 RAKBUNG - LORGING - DAMDA ROAD (10.00 KM) (F/Cutting ; 5- West Siang 3.00 4.20 7.20 7.20 7.20 100%<br />

10.00 Km )<br />

76 MOPUNG-MOLOM ROAD (10.00 KM) (Formation Cutting; 0 -10.00 Km ) West Siang 2.60 4.02 6.62 6.62 6.62 100%<br />

77 RUMGONG-MOPUNG ROAD (8KM) Culvert, R/Wall & B/Wall ; 0 - West Siang 2.37 0.00 2.37 2.37 2.37 100%<br />

8.00 Km(Culvert, R/Wall & B/Wall ; 0 - 8.00 Km)<br />

RUMGONG TOWNSHIP ROADS<br />

West Siang<br />

78 WBM & BT, 0 - 1.00 Km West Siang 1.60 2.32 3.92 0.00 3.92 3.92 100%<br />

79 C/o Approach road & site development for T-IV & T-V Qtrs. At Rumgong<br />

(E/Work, Soling, Metalling & B/T-300 Mtrs)<br />

West Siang 2.95 0.02 2.97 0.00 2.97 2.97 100%


80 C/o Approach road site development for Temporary Division Office staff Qtrs.<br />

& Labour Camp at Rumgong (E/Work, Soling, Met & Carpt - 500 mtr)<br />

West Siang 1.90 0.00 1.90 0.00 1.90 1.90 100%<br />

81 KAYING PAYUM ROAD (16 KM) (F/C; 3.55 - 6.85 Km (Ph:-II)) West Siang 4.20 6.68 10.88 2.00 4.00 6.00 55%<br />

82 PAYUM TOWNSHIP ROAD (C/o C.C. step and foot path at Payum HQ.(400 West Siang 2.03 0.00 2.03 2.03 0.03 2.06 101%<br />

m))<br />

Sub- Total 23.85 22.05 45.90 28.23 12.82 0.00 41.05 89%<br />

Name <strong>of</strong> Circle : Along Circle<br />

Name <strong>of</strong> Division : Mechukha Division<br />

SIYOM MECHUKHA ROAD, (40KM)<br />

83 Formation cutting (5-7 Km) West Siang 2.22 0.00 2.22 0.00 0%<br />

84 Improvement <strong>of</strong> existing road (2.00 km) (SH: Formation Cutting, F/Filling, West Siang 2.00 2.34 4.34 4.30 4.30 99%<br />

Widening, S/Culvert & CC Drain)<br />

85 ROAD FROM BRTF TO RAPUM VILLAGE (3.00Km.) (Formation West Siang 2.00 1.98 3.98 0.00 0%<br />

cutting, 0-3 Km.)<br />

86 MONIGONG TOWNSHIP ROADS (C/o road from Karle village to Pangri West Siang 2.00 2.33 4.33 0.00 0%<br />

via Geching (12.00Km. ) F/C 0 to 2.00 Km.)<br />

TATO TOWNSHIP ROADS :<br />

West Siang<br />

87 WBM, 0 to 2.00 Km. West Siang 2.35 0.00 2.35 0.00 0%<br />

88 Extension <strong>of</strong> Tato township road to proposed new Aministrative Office at Tato West Siang 4.65 8.00 12.65 0.00 0%<br />

(2.00 km) (SH: F/C-2.00 km)<br />

89 YAPIK TOWNSHIP ROAD (C/o road from BRTF road to Yapik halipad ( West Siang 2.20 0.00 2.20 0.00 0%<br />

1.00 Km.) Soling 0-1.00 Km ))<br />

Sub- Total = 17.42 14.65 32.07 4.30 0.00 0.00 4.30 13%<br />

Bridges<br />

Name <strong>of</strong> Circle:- BASAR CIRCLE<br />

Name <strong>of</strong> Division:- Basar Division<br />

GARU-GENSI, ROAD.(20.70KM.)<br />

1 C/O Steel Bridge over Kutte Nallah (Span-20.00 mtr) at Ch. 17.74 km. West Siang 13.50 21.02 34.52 0.00 0%<br />

GENSI TARAMORI ROAD (25.00 KM) West Siang<br />

2 C/O RCC Bridge <strong>of</strong> 15.00 mtr.span at Chainage 9.15 Km over Ninah West Siang 6.35 8.01 14.36 0.00 0%<br />

3 C/O RCC Bridge over river Sibu ( Span-40.00 mtr) West Siang 24.45 53.99 78.44 0.00 0%<br />

APPROACH ROAD CONNECTING RAILWAY LINE TO DIPA West Siang<br />

4 C/O R.C.C. Bridge <strong>of</strong> (span 15.00 mtr) West Siang 8.00 11.00 19.00 0.00 0%


Name <strong>of</strong> Circle : Along Civil Circle<br />

Name <strong>of</strong> Division : Along PW Division<br />

ROAD FROM NGOMDIR TO BEYE (15.00 KM)<br />

5 C/o RCC Bridge over river Hili <strong>of</strong> span 15 mtrs at chainage 7.00 Km West Siang 15.70 25.00 40.70 0.00 0%<br />

Name <strong>of</strong> Circle :- Along Circle<br />

Name <strong>of</strong> Division :- Yomcha P.W.Division.<br />

WAK-LIROMOBA ROAD (70KM) [UNDER YOMCHA 60-70 KM]<br />

6 C/o Bailey bridge over river Jere at Ch.47.32 km (span 30.50 mtr) West Siang 9.35 14.02 23.37 23.37 23.37 100%<br />

Name <strong>of</strong> Circle : Along Civil Circle<br />

Name <strong>of</strong> Division : Rumgong PW Division<br />

RANAGHAT-RUMGONG ROAD (30.50 KM)<br />

7 C/o Bailey Bridge over river Lorbung (span 24.40 mtr) West Siang 10.95 0.00 10.95 10.94 10.94 100%<br />

8 C/o Bailey Bridge over river Sirit (span 39.60 mtr) West Siang 8.00 15.97 23.97 23.97 23.97 100%<br />

MOPUNG MOLOM ROAD<br />

9 C/o. RCC Bridge over Rebung Nallah (Span- 6Mtrs.) at Ch.- 1.10Km) 9.70 -0.03 9.67 0.00 0%<br />

Name <strong>of</strong> Circle : Along Circle<br />

Name <strong>of</strong> Division : Mechukha Division<br />

MECHUKA-MONIGONG ROAD<br />

10 C/o. RCC Bridge over Tamdelling nallah to connect community health centre, West Siang 10.10 16.90 27.00 5.00 5.00 19%<br />

Mechuka (span 10 mtr)<br />

SUB TOTAL = 116.10 165.88 281.98 63.28 0.00 0.00 63.28 22%<br />

Foot Suspension Bridges<br />

CIRCLE : BASAR CIRCLE<br />

DIVISION : BASAR DIVISION<br />

FOOT SUSPENSION BRIDGE UNDER BASAR DIVISION.<br />

1 C/o FSB over river Kidi to connect Nyigam-Meker to Pajo (Span-100m) West Siang 10.75 12.98 23.73 0.00 0%<br />

2 C/o FSB over river Goker to connect Likabali township Jipu Goger Sitte Malini West Siang 10.65 13.99 24.64 0.00 0%<br />

Village (Span 150 m)<br />

3 C/o FSB over JIYADAL between Bali-Sori & Siloni (Span 50 mtrs) West Siang 1.85 0.00 1.85 1.85 1.85 100%<br />

4 C/O Foot Suspension Bridge over Igo river between Chissi village to New West Siang 9.50 10.01 19.51 0.00 0%<br />

Chissi village (span 80 Mtrs.)<br />

5 C/O FSB over river Sie to connect Gori village and Ego Yamin village (40.00 West Siang 10.00 14.00 24.00 0.00 0%<br />

mtr) i/c C.C. foot path<br />

6 C/O FSB over river Siji to connect Siji and Soi Paddy field (90.00 mtr) West Siang 12.00 16.99 28.99 0.00 0%


7 C/o Foot Suspension bridge over Sibum river between Lutak & Sibe-siru. [70<br />

mtr. span]<br />

West Siang 5.90 7.98 13.88 0.00 0%<br />

Name <strong>of</strong> Circle : Along Civil Circle<br />

Name <strong>of</strong> Division : Along PW Divn.<br />

FOOT SUSPENSION BRIDGE UNDER ALONG DIVISION.<br />

87 C/o Wire rope S/Bridge over Siyom river at Kabu village (Span- 130 Mtrs.) West Siang 12.60 13.98 26.58 26.58 26.58 100%<br />

88 Re-construction <strong>of</strong> Wire rope S/Bridge over River Sie to connect Esekarte<br />

village from Tai-LMB road (span 50 mtr)<br />

West Siang 6.00 6.00 12.00 12.00 12.00 100%<br />

Circle :-Along Circle<br />

Division :-Yomcha P.W.Division.<br />

SUSPENSION BRIDGES UNDER YOMCHA DIVISION<br />

89 C/o FSB over river Hirik from Ronyom to Yongu at Boru Rakshap village (spanWest Siang 8.00 7.00 15.00 3.00 3.00 20%<br />

150 mtr)<br />

90 C/o FSB over river Payi at Rakshap village (span 90 mtr) West Siang 7.20 6.00 13.20 13.20 0.00 0.20 13.40 102% Duplicacy (batch-<br />

2/16) & batch-<br />

33/1)<br />

91 C/o Foot S/ Bridge over river Rimi to connect Yomcha & Daba Gamlin (Span- West Siang 8.55 10.00 18.55 5.00 13.55 0.00 18.55 100%<br />

120 mtrs)<br />

92 C/o Foot S/ Bridge over river Sipin to connect Biru, Sari Likar & Ronya village West Siang 5.75 7.02 12.77 2.00 10.77 0.00 12.77 100%<br />

(Span-80 mtrs)<br />

Circle : Along<br />

Division : Rumgong<br />

SUSPENSION BRIDGES UNDER RUMGONG DIVISION<br />

93 C/O foot suspension bridge over river Siyom at Bogne (Span-250 Mtr.) West Siang 30.50 68.00 98.50 16.39 16.39 17%<br />

94 Special repair <strong>of</strong> foot suspension bridges under Kaying Circle. West Siang 1.75 0.02 1.77 1.77 1.77 100%<br />

95 Foot Suspension bridge over river Sirit at Jomo-Rumgong porter track (span- West Siang 3.75 5.00 8.75 8.75 8.75 100%<br />

20.00 Mtr)<br />

96 FSB over river Irbung at Yosing-Yogong Porter track.(span-25.00 Mtr.) West Siang 4.95 4.01 8.96 3.00 3.00 33%<br />

97 FSB over river Yobung at Yosing - Yogong porter track, (span-25.00 Mtr.) West Siang 4.95 4.01 8.96 3.00 3.00 6.00 67%<br />

98 FSB over river Siyom at Lokpeng - Damda cross point (Span-110.00 Mtr.) West Siang 18.75 26.99 45.74 10.00 10.00 22%<br />

Circle : Along<br />

Division : Mechukha<br />

SUSPENSION BRIDGES UNDER MECHUKHA DIVISION


99 Construction <strong>of</strong> Foot Suspension Bridge over river Siyum with R.C.C. tower at West Siang 13.90 14.98 28.88 5.00 5.00 17%<br />

Purying village under Mechuka Circle (span 130 mtr).<br />

100 Construction <strong>of</strong> Foot Suspension Bridge over river Dullung (span 90 mtr). West Siang 12.75 0.03 12.78 5.00 5.00 39%<br />

101 C/O FSB over river Godang Som near Karte (Span 100Mtr.) West Siang 5.70 0.00 5.70 5.70 0.00 0.00 5.70 100%<br />

102 C/o Foot Suspension Bridge on Porter Track from Mechuka to Pamasibu (60 West Siang 15.00 25.00 40.00 3.90 3.90 10%<br />

mtr) (leading to International Border)<br />

SUB-TOTAL 220.75 273.99 494.74 71.40 55.48 26.78 153.66 31%<br />

Porter Tracks<br />

CIRCLE : BASAR<br />

DIVISION : BASAR<br />

PORTER/MULE TRACKS UNDER BASAR DIVISION<br />

44 C/o porter track from Taramori to Dibe (30.00 Km) West Siang 3.75 3.98 7.73 0.00 0%<br />

CIRCLE : ALONG<br />

DIVISION : MECHUKA<br />

PORTER TRACK UNDER MECHUKA DIVISION<br />

45 c/O Porter/Mule Track from Mechuka to Pemssibu (40.00 Km) West Siang 4.00 6.00 10.00 3.00 3.00 30%<br />

Sub- Total 7.75 9.98 17.73 3.00 0.00 0.00 3.00 17%<br />

NLCPR<br />

NAME OF CIRCLE : ALONG CIRCLE<br />

NAME OF DIVISION : ALONG DIVISION<br />

13 Nyorak to Rime Putok Road West Siang 29.20 69.77 98.97 0.00 29.20 69.77 98.97 100%<br />

NAME OF CIRCLE : ALONG CIRCLE<br />

NAME OF DIVISION : RUMGONG DIVISION<br />

14 Construction <strong>of</strong> Bridge over Siyom on Kaying to Paksing Road (span 122.00 West Siang 36.40 39.98 76.38 35.00 41.38 76.38 100%<br />

Mtr)<br />

Sub- Total 65.60 109.75 175.35 35.00 70.58 69.77 175.35 100%<br />

BASAR DIVISION<br />

RIDF & CRF


12 C/O GARU TO GENSI ROAD (20.70 Km) West Siang 100.20 36.00 136.20 100.00 100.00 73%<br />

13 BRIDGE OVER RIVER KIDI BETWEEN BASAR AND NYODU VILLAGE West Siang 19.80 50.00 69.80 0.00 0%<br />

IN WEST SIANG DISTRICT<br />

Sub- Total 120.00 86.00 206.00 100.00 0.00 0.00 100.00 49%<br />

Total PWD : West Siang) 906.77 1154.57 2061.34 558.77 260.43 245.41 1064.61 52%<br />

3 Roads<br />

NAME OF CIRCLE : BOLENG CIRCLE<br />

NAME OF DIVISION : PASIGHAT DIVISION<br />

1 TENE - KOYU ROAD ( 24KM) (C/o 10 men B/Barrack for PWD Staff at East Siang 1.04 0.00 1.04 1.05 1.05 101%<br />

Koyu)<br />

2 MIREM - MIKONG - JONAI ROAD (16KM) (RCC slab culvert at various East Siang 3.00 4.99 7.99 4.00 4.00 50%<br />

location (5 Nos. <strong>of</strong> 2 mtr. Span))<br />

3 NGOPOK-SILLUK ROAD ( 12.60Km)(WBM & BT, 2 - 12.86 Km.) East Siang 11.00 27.43 38.43 20.00 20.00 52%<br />

PASIGHAT - JNC - BALEK ROAD<br />

East Siang<br />

4 Replacing <strong>of</strong> timber decking into steel decking <strong>of</strong> Inglish bridge over Sibo East Siang 2.00 2.34 4.34 4.30 4.30 99%<br />

Korong<br />

5 C/O RCC slab culvert <strong>of</strong> 4 mtr span over Kelek Korong. East Siang 1.20 1.80 3.00 3.00 3.00 100%<br />

6 C/o slab culvert over Siying Korong on JN college campus road near Principal East Siang 2.15 0.00 2.15 2.15 2.15 100%<br />

quarter (6.00 mtr span)<br />

ROAD FROM KOYU TO KADU VILLAGE, (24 KM )<br />

East Siang<br />

7 Soling, WBM, by the technique <strong>of</strong> stabilisation by using rice straw ash 1.00 East Siang 2.02 0.00 2.02 2.00 2.00 99%<br />

Km.<br />

22 Clearance <strong>of</strong> land slides & widening <strong>of</strong> curves at different places by B/Dozer East Siang 3.30 0.02 3.32 3.30 3.30 99%<br />

23 2KM POINT OF MEBO-DHOLLA ROAD TO SIGAR (Raising <strong>of</strong> road East Siang 1.25 1.89 3.14 3.10 3.10 99%<br />

level (13km).)<br />

MEBO-DHOLLA ROAD FROM SERAM TO PAGLAM TINALI VIA East Siang<br />

NAMSING 12KM<br />

25 Raising <strong>of</strong> road level, WBM, culverts East Siang 3.50 5.03 8.53 0.00 8.50 0.00 8.50 100%<br />

26 WBM & BT 0-5 km East Siang 5.80 10.56 16.36 0.00 11.30 11.30 69%<br />

27 WBM & BT (28-34km) East Siang 7.60 13.98 21.58 0.00 15.60 15.60 72%<br />

28 ROAD FROM RUKSIN TO DEBING(6.29KM) (Raising <strong>of</strong> road level & East Siang 6.00 13.01 19.01 10.00 10.00 53%<br />

culverts 6.29 - 16.29 km)<br />

29 ROAD FROM MEBO TO KOMLIGHAT, (13KM) (Re-carpeting (5 - 9 East Siang 2.85 3.00 5.85 3.85 3.85 66%<br />

km).<br />

PASIGHAT TOWNSHIP ROAD.<br />

East Siang


30 Road from NH - 52 to Shanker Mission I/c Public Bus station & state transport East Siang 3.00 3.77 6.77 6.75 6.75 100%<br />

colony (SH - RRL 1.00 km, S/C - 2 Nos, WBM & BT 0.90 km)<br />

31 Impvt. <strong>of</strong> Mirsam, Mirku, Mirbuk village road via Diking village. (SH-BT- East Siang 3.00 3.66 6.66 6.65 6.65 100%<br />

3.00Km, WBM - 0.45 km & S/C 2mtr.-3Nos)<br />

32 SIKA-TODE SIKA-BAMIN ROAD, (10.82KM) (Re-carpeting Sika-Tode East Siang 3.00 3.36 6.36 6.35 6.35 100%<br />

Sika-Bamin Road. (0 - 10.80 kms).)<br />

33 SILLE TOWNSHIP ROADS (WBM & BT (0-2km) road towards M.E.. East Siang 2.40 3.01 5.41 2.40 2.40 44%<br />

School at Rani.)<br />

34 C/O LINK ROAD FROM NH-52 TO SISIRI RIVER POINT VIA East Siang 3.00 4.21 7.21 4.20 4.20 58%<br />

AOHOLI VILLAGE ( 3. 00KM) (Soling, WBM & Black toping. (0.00 -<br />

1.60 km)<br />

SUB-TOTAL = 67.11 102.06 169.17 0.00 118.50 0.00 118.50<br />

Name <strong>of</strong> Ciricle : Boleng Circle<br />

Name <strong>of</strong> Division : Boleng Division<br />

PASIGHAT PANGIN ROAD(76 KM),UNDER BOLENG,28-76 KM.<br />

22 Widening <strong>of</strong> narrow port & Curves <strong>of</strong> different place I/c pavement & Drain on East Siang 2.01 0.00 2.01 2.01 2.01 100%<br />

wide portion (28 to 76 Kms) by Dozer.<br />

23 Improvement <strong>of</strong> drainage system at various location between 28 Kms to 76 East Siang 1.98 0.00 1.98 0.65 1.33 1.98 100%<br />

Kms.<br />

24 Repair <strong>of</strong> Pavement & Re-Caprt. 28 to 36 Km. East Siang 3.40 5.00 8.40 5.39 5.39 64%<br />

25 YEMBUNG-YEMSING ROAD(11.60 KM) (Wing Wall to protect Kemi East Siang 1.50 2.47 3.97 1.55 3.97 5.52 139%<br />

bridge on Yembung-Yemsing Road)<br />

BOLENG-SINE ROAD(25 KM)<br />

East Siang<br />

26 F/Cutting 5.00 to 15 Km. East Siang 4.60 9.40 14.00 0.00 0.00 0%<br />

27 Culverts, R/Wall, Drain, 0 to 5 Km East Siang 1.60 2.41 4.01 4.76 0.00 4.76 119%<br />

28 DITE-DIME RIEW ROAD(8.45 KM) (WBM & BT, 0-5 Km.) East Siang 1.25 1.69 2.94 1.10 1.84 2.94 100%<br />

29 DOSING-PARENG ROAD(10.50 KM) (WBM & BT, 0-6 Km) East Siang 1.97 0.00 1.97 1.97 1.97 100%<br />

30 YEKSHI-DAMDA-LORGING ROAD(10.00 KM) (F/C, 5 to 10 Km.) East Siang 6.00 13.65 19.65 6.79 6.79 35%<br />

RIEW BEGGING ROAD(8.45-18.45 kM)RIEW AT 8.45 kM.<br />

East Siang<br />

31 F/C, 18.45 to 23.00 KM East Siang 2.45 3.01 5.46 0.17 5.29 5.46 100%<br />

32 WBM, Side Drain (Ph-I), WBM & Side Drain 8.45 to 11.45 KM East Siang 2.00 2.88 4.88 4.23 4.23 87%<br />

33 Culverts, R/Wall and B/Wall (8.45 to 13.45 Km) Ph-I, 8.45 to 11.45 Km. East Siang 3.00 4.29 7.29 0.00 0.00 0%<br />

34 Soling, 14.00 to 16.00 km East Siang 2.20 3.98 6.18 0.00 0.00 0%<br />

35 GUNE-PEGGING-BOTE ROAD(8.22 KM) (F/C-0 to 8.22 Km.) East Siang 2.03 0.00 2.03 2.03 2.03 100%<br />

BOLENG TOWNSHIP ROAD.<br />

East Siang


36 Impvt. Of Junction point <strong>of</strong> Boleng approach (Simang end) SH: F/C, R/Wall & East Siang 4.30 9.00 13.30 4.29 6.13 0.00 10.42 78%<br />

P/Drain<br />

37 C/o protection work at at Boleng Township area East Siang 1.00 3.00 4.00 3.40 4.13 0.00 7.53 188%<br />

38 Approach road to newly created SE staff residential building for at Boleng East Siang 2.00 3.00 5.00 1.17 3.47 4.64 93%<br />

(0.70 Km) SH: F/C , Soling & S/Drain)<br />

39 C/O Road from BRTF road to Siang-Simang confluence (Length-2.00 km) Sh: East Siang 2.00 3.01 5.01 0.00 0.00 0%<br />

Soling & Metalling.<br />

40 PANGIN TOWNSHIP ROAD. (Jeepable road from Pangin Town to Pullung East Siang 2.00 2.46 4.46 0.00 0.00 0%<br />

S/Bridge (4 Km) Sh: F/C, 0 to 2 Km.)<br />

41 LINK ROAD FROM SITANG TO MODI (ON BRTF ROAD) VIA East Siang 3.00 5.02 8.02 0.00 0.00 0%<br />

LIPUNG ASING AREA TO PONGCHUNG S/BRIDGE NEAR RIGA<br />

(16.00 KM) (F/C, 0-3.00 Km (Ph-I : F/C-1.50 Km))<br />

42 PARONG-DOSING VIA BOMKONG (16.00 KM) (Survey & Investigation, East Siang 1.00 1.97 2.97 0.00 0.00 0%<br />

0-16 Km)<br />

43 TOWNSHIP ROAD PEGGING-BOTE (F/C, WBM & BT (1.00 Km)) East Siang 1.60 2.32 3.92 1.74 1.65 3.39 86%<br />

44 ROAD FROM YEMSING TO TARAK VILLAGE(41 KM) (Formation East Siang 2.50 4.02 6.52 0.00 0.00 0%<br />

cutting, 0 to 2 Km.)<br />

45 ROAD FROM PARONG TO PEGGI BOTE(18 KM) (F/Cutting 0 to 3 KM.) East Siang 2.70 4.02 6.72 0.00 0.00 0%<br />

46 DOSING PARENG ROAD TO PARENG VILLAGE (1.00 KM) (Soling & East Siang 2.00 2.98 4.98 5.52 0.00 5.52 111%<br />

Metalling, 0.00 to 1.00 Km.)<br />

47 PEGI-BOTE TOWNSHIP ROAD (Approach road from BRTF road to East Siang 3.00 5.00 8.00 0.00 0.00 0%<br />

Hambung Dere (SH: Widening, Soling & B/T - 1.00 Km))<br />

48 ROAD CONNECTING RIEW, JORSING, KOMSING UPTO SANGAM East Siang 2.28 0.00 2.28 2.28 2.28 100%<br />

BRIDGE VIA NEWLY CREATED C.O. HQ AT REBO(25 KM) (F/C 6.50<br />

to 8.00 Km.)<br />

SUB-TOTAL = 65.37 94.58 159.95 7.69 26.92 42.25 76.86 48%<br />

Bridges<br />

NAME OF CIRCLE : BOLENG CIRCLE<br />

NAME OF DIVISION : PASIGHAT DIVISION<br />

PASIGHAT PANGIN ROAD<br />

3 C/o RCC Bridge over Sille korong on Pasighat-Pangin road (span 15m) (SH: East Siang 3.00 1.54 4.54 4.50 4.50 99%<br />

Return wall, protection work and approach filling).<br />

4 C/O RCC Bridge at Sille Korong on Pasighat-Pangin Road (10m Span). East Siang 1.00 0.00 1.00 0.00 1.00 0.00 1.00 100%


TENE - KOYU ROAD, (24.00KM) East Siang<br />

5 C/o Bailey Bridge over Simen Korong (span 120 feet) East Siang 4.75 3.98 8.73 0.00 8.70 0.00 8.70 100%<br />

6 C/o RCC Bridge over Sosi Korong (10.50 mtr. span) East Siang 0.95 0.00 0.95 0.90 0.90 95%<br />

7 C/o Permanent bridge over Siju korong (span 49.60 mtr) East Siang 10.30 19.00 29.30 0.00 29.30 0.00 29.30 100%<br />

8 C/o RCC Bridge over Belak Korong (10m span) East Siang 0.85 0.00 0.85 0.80 0.80 94%<br />

9 C/O RCC Bridge over Jume Korong on Tene-Koyu Road (10.50 mtr. Span) at East Siang 5.10 0.02 5.12 5.10 5.10 100%<br />

Ch. 56.10 Km.<br />

SUB-TOTAL = 25.95 24.54 50.49 0.00 50.30 0.00 50.30<br />

Name <strong>of</strong> Ciricle : Boleng Circle<br />

Name <strong>of</strong> Division : Boleng Division<br />

DOSING-PARENG ROAD (10.50 KM)<br />

6 Conversion <strong>of</strong> Timber decking to steel decking <strong>of</strong> Nambung Bailey<br />

East Siang 5.30 0.00 5.30 0.00 0%<br />

bridge.(Span-30 Mtr.)<br />

7 Diversion Bridge construction at Ch. 10.70 Km East Siang 10.30 14.00 24.30 14.86 14.86 61%<br />

ROAD FROM PARENG YIBUK ROAD TO SINE (23.00 KM)<br />

East Siang<br />

8 Both side approach road to Pirak Bridge (SH: F/C, Soling & Metalling) East Siang 4.00 6.00 10.00 2.25 2.25 23%<br />

SUB TOTAL = 19.60 20.00 39.60 0.00 14.86 2.25 17.11<br />

Name <strong>of</strong> Ciricle : Boleng Circle<br />

Name <strong>of</strong> Division : Boleng Division<br />

SUSPENSION BRIDGES UNDER BOLENG DIVISION<br />

3 C/o F.S.B. across Siang river at Rahung (span 300 Mtr) East Siang 10.55 17.01 27.56 0.00 15.27 15.27 55%<br />

SUB TOTAL = 10.55 17.01 27.56 0.00 15.27 0.00 15.27<br />

NEC<br />

Name <strong>of</strong> Circle : BOLENG CIRCLE<br />

Name <strong>of</strong> Division : Pasighat Division<br />

1 Upgradation <strong>of</strong> Pasighat - Ledum - Tene - Koyu Road (60.00 Km) East Siang 195.50 100.00 295.50 345.50 345.50 117%<br />

2 Road from Laimekuri - Nari - Telam - Rema Camp (61.00 Km) East Siang 157.10 191.25 348.35 50.00 50.00 14%<br />

3 Upgradation <strong>of</strong> Road from Mottum Tinali to Maktunghat (8.05 Km) East Siang 12.10 30.00 42.10 12.00 12.00 29%<br />

SUB- TOTAL 364.70 321.25 685.95 0.00 407.50 0.00 407.50<br />

4 ROADS<br />

Total : (PWD : East Siang) 553.28 579.44 1132.72 0.00 576.30 0.00 576.30<br />

Name <strong>of</strong> Circle :- Boleng Circle<br />

Name <strong>of</strong> Division :- Mariyang Division<br />

YINGKIONG - DAMROH ROAD ( 62.00 KM )<br />

1 R&B/Wall,Culverts & Side Drains, (0-5.00 Km ) Upper Siang 2.85 3.02 5.87 0.00 0.00 0.00 0.00 0%


2 Recarpeting <strong>of</strong> road from 35.00-37.00 Km Upper Siang 5.55 7.99 13.54 0.00 0.00 13.54 13.54 100%<br />

3 Carpetting 27 - 35 Kms Upper Siang 1.75 2.57 4.32 0.00 0.00 4.32 4.32 100%<br />

4 PASIGHAT-DAMROH ROAD ( 76.00 KM ) (Restoration <strong>of</strong> road near Padu) Upper Siang 1.25 1.84 3.09 3.09 0.00 0.00 3.09 100%<br />

5 GEKU-SUMSING-SIBUM ROAD ( 40.00 KM ) (Soling,metalling,Carpetting Upper Siang 5.20 7.97 13.17 0.00 0.00 11.00 11.00 84%<br />

& drain ( 0 to 5.00 Km )<br />

6 ROAD FROM KOLUNG TO DALBING VILLAGE ( 10.50 KM ) Upper Siang 3.00 4.02 7.02 0.00 0.00 7.02 7.02 100%<br />

(F/Cutting,5.50 - 10.50 Km )<br />

7 MARIYANG - MILLANG ROAD ( 12.00 KM ) C/O Culvert,R&B/Wall<br />

from(C/O Culvert,R&B/Wall from Sidip to Millang - 5.00 Km)<br />

Upper Siang 3.70 6.00 9.70 0.00 0.00 9.70 9.70 100%<br />

KOMKAR TO LAGRU ROAD ( 18.00 KM )<br />

Upper Siang<br />

8 F/cutting, 4 to 7 Kms Upper Siang 1.60 2.42 4.02 0.00 0.00 4.02 4.02 100%<br />

9 Culverts,R&B/Wall, 0 to 4 Kms Upper Siang 2.80 3.99 6.79 0.00 0.00 2.15 2.15 32%<br />

10 MARIYANG TOWNSHIP ROAD(8.70KM) (Alternative approach road to Upper Siang 1.20 1.81 3.01 0.00 0.00 3.01 3.01 100%<br />

Mariyang township from Yingkiong-Damroh road.(WBM - 3 Kms).)<br />

11 ROAD FROM KATAN TO PADU. (F/Cutting 2.00 - 8.00 Km) Upper Siang 15.00 27.11 42.11 0.00 0.00 0%<br />

12 ROAD FROM KATAN TO REGLAT BRIDGE Upper Siang<br />

13 ROAD FROM KATAN TOA REGLAT BRIDGE POINT VIA JERU & Upper Siang 8.90 11.98 20.88 20.88 0.00 0.00 20.88 100%<br />

PONGGING ( 35 KM ) (F/Cutting, 17.00 to 19.00 km)<br />

14 APPROACH ROAD FROM GEKU-SUMSING-SIBUM ROAD TO Upper Siang 2.35 0.01 2.36 0.00 0.00 0%<br />

JOMOH VILLAGE(0.20 KM)(Earth work,Soling,mettaling & carpetting.)<br />

Sun- Total = (13 NOS SCHEMES) 55.15 80.73 135.88 23.97 0.00 54.76 78.73<br />

Name <strong>of</strong> Circle :- BOLENG CIRCLE<br />

Name <strong>of</strong> Division :- YINGKIONG PW DIVISION<br />

YINGKIONG-DAMROH ROAD, (UPTO GOBUK 27 KM) :-<br />

1 WBM from 16 to 26 Km (SH: Balance Metalling 6.00 Km & Carpt.-7.00 Km) Upper Siang 9.60 15.02 24.62 15.00 15.00 61%<br />

2 C/o road from Gobuk to Yiklek Hill (SH: Widening 0 to 3.00 Km) Upper Siang 4.00 5.65 9.65 9.65 9.65 100%<br />

3 PUGGING-LIKOR PALLING ROAD (50 KM) (Impvt. <strong>of</strong> Geometrics and Upper Siang 3.50 4.99 8.49 8.45 8.45 100%<br />

Culverts at various chainages from Pugging to Likor, 0 - 27 Km. (SH: Wid.,<br />

Nose cutting, culvert and S/Drain))<br />

YINGKIONG-GETTE-PUGGING ROAD, (20.65 KM) : -<br />

Upper Siang<br />

4 C/o road side drain from 8.60 to 15.00 Km from Sipit to Sirin village (SH: R.R. Upper Siang 1.00 1.00 2.00 2.00 2.00 100%<br />

Drain-6.40 Km)


5 C/o Drain from Sirin to Pugging village 15 to 21 Km (SH: R.R. Drain for 6 Km)Upper Siang 1.00 2.00 3.00 3.00 3.00 100%<br />

6 C/o 6 mtr span R.C.C. culverts on Sibi Nallah at 4.60 Km i/c approach Upper Siang 1.50 1.78 3.28 3.25 3.25 99%<br />

7 Re-Carpt.-0-3.00 Km on Yingkiong-Gette-Pugging road. Upper Siang 2.05 2.99 5.04 2.00 2.00 40%<br />

8 ROAD FROM JENGGING TO RIGA VIA SIKU VILLAGE, (42.00 Upper Siang 3.95 6.00 9.95 9.95 9.95 100%<br />

KM)(Soling, 3.00 to 6.00 Km.)<br />

9 ROAD FROM GANDHI BRIDGE TO RAMSING VILLAGE RIGHT Upper Siang 2.40 3.50 5.90 5.90 5.90 100%<br />

BANK OF SIANG RIVER (4.40 KM) (SH: RCC S/Cul.-6 Nos. & Drain-2.00<br />

Km.)<br />

10 ROAD FROM SIMONG TO SINGHA, (25.00 KM)( Formation Cutting, 0-5 Upper Siang 2.85 4.00 6.85 6.85 6.85 100%<br />

Km (Simong side))<br />

11 ROAD FROM JIDO TO ANGGING, (13.00 KM)(F/Cutting, 5 - 10 Km ) Upper Siang 2.00 2.95 4.95 4.94 4.94 100%<br />

12 LINK ROAD FROM TINOMOKA TO KIYIT (OKTA) VIA MOYING Upper Siang 3.85 5.98 9.83 9.80 9.80 100%<br />

(GOSANG) CONNECTION BRTF ROAD, (15.00 KM) (F/Cutting, 5 - 10<br />

Km )<br />

13 ROAD FROM BOMDO TO NYERING AREA, (0-10.00 KM) (C/o Culverts Upper Siang 3.00 5.01 8.01 8.00 8.00 100%<br />

& R/Wall, 0-2 km )<br />

YINGKIONG TOWNSHIP ROADS<br />

Upper Siang<br />

14 C/o R/Wall and B/Wall at Yingkiong Township Upper Siang 4.00 6.00 10.00 5.00 5.00 10.00 100%<br />

15 C/o Internal road to Upper Hill colony 1.00 Km (SH: F/Cutting) Upper Siang 4.00 6.00 10.00 10.00 10.00 100%<br />

16 TUTING TOWNSHIP ROADS (10.00 KM) (C/o <strong>of</strong> Approach road to Upper Siang 3.60 4.99 8.59 5.50 5.50 64%<br />

Pekong village, Vetenary colony and Police station at Tuting, 3.00 Km. (SH:<br />

Sol., Met., BT & Drain))<br />

17 ROAD FROM SARKOM POINT OF YINGKIONG-DAMROH ROAD Upper Siang 4.50 6.60 11.10 11.10 11.10 100%<br />

TO SINGHA VIA EGO-DUMPING (125.00 KM)(Formation Cutting, 2.00-<br />

4.00 km (Phase-II))<br />

18 GELLING TOWNSHIP ROAD (5.00 KM) (Link road from Gelling to Upper Siang 3.00 1.70 4.70 4.70 4.70 100%<br />

S/bridge at Bishing village (2 km))<br />

19 YINGKIONG TO GANDHI BRIDGE ON LEFT BANK OF SIANG. (C/o Upper Siang 1.25 2.00 3.25 3.25 3.25 100%<br />

R.C.C. Slab Culverts 8 Nos. (2 mtrs span each).)<br />

20 ROAD FROM BIMIK TO KOMKAR (25.00 KM) (Survey & Investigation, Upper Siang 1.10 2.02 3.12 3.10 0.00 3.10 99%<br />

25.00 Km.)<br />

21 ROAD FROM JIDO TO SINGHA (93.00 KM) (Survey & Investigation from Upper Siang 4.00 5.98 9.98 9.95 9.95 100%<br />

Nyering to Singha 65 Km. (Phase-II))<br />

Sub- Total = 66.15 96.16 162.31 44.54 101.85 0.00 146.39 90%


Bridges<br />

Name <strong>of</strong> Circle :- Boleng Circle<br />

Name <strong>of</strong> Division :- Mariyang Division<br />

YINGKIONG - DAMROH ROAD ( 62.00 KM )<br />

1 C/O Bridge on Silu Nallah (Span 8.00 mtr.)At Ch.1.54 Km Upper Siang 5.75 7.00 12.75 6.00 6.00 47%<br />

ROAD FROM KATAN TO RAGLAT BRIDGE POINT VIA JERU Upper Siang<br />

2 C/o R.C.C. Bridge over river Sirang Korong Ch. 4.00 Km (span 12 mtr). Upper Siang 6.80 10.00 16.80 8.00 8.00 48%<br />

Upper Siang<br />

Name <strong>of</strong> Circle :- BOLENG CIRCLE<br />

Upper Siang<br />

Name <strong>of</strong> Division :- YINGKIONG PW DIVISION<br />

Upper Siang<br />

PUGGING-LIKOR-PALLING ROAD (60 KM)<br />

Upper Siang<br />

1 C/o B/Bridge over Siri Nallah and Sitak Nallah at Ch. 23.50 Km and 25.20 Km Upper Siang 18.20 28.98 47.18 35.00 35.00 74%<br />

(Span 42 mtr. & 30 mtr. respectively)<br />

YINGKIONG-GETTE-PUGGING ROAD, (20.65 KM) : - Upper Siang<br />

2 C/o Steel Bridge (Span 8 mtr. each) on Gerang-Korang, Dotang-Korang & Upper Siang 6.40 10.03 16.43 3.50 1.50 5.00 30%<br />

Pugging-Korang at Ch. 13,17 & 20.50 respectively<br />

YINGKIONG TO GANDHI BRIDGE ON LEFT BANK OF SIANG. Upper Siang<br />

3 C/o Bridge over river siking (Span-25 mtrs.) Upper Siang 14.40 20.95 35.35 18.40 16.95 35.35 100%<br />

4 Constn. <strong>of</strong> Motorable Suspension Bridge over river Siang at the site <strong>of</strong> Gandhi Upper Siang 8.00 12.02 20.02 20.00 20.00 100%<br />

Bridge (320.00 mtr. span) (SH: Sub-Soil Investigation, Feasibility study and<br />

preparation <strong>of</strong> DPR along with Designs & Drawing)<br />

C/O MOTORABLE BRIDGE OVER RIVER SIANG AT LADUM Upper Siang<br />

(TUTING) TO CONNECT SINGHA<br />

5 Sub-Soil Investigation & feasibility study, consultancy services for design & Upper Siang 2.15 3.98 6.13 6.10 6.10 100%<br />

drawing.<br />

FOOT SUSPENSION BRIDGE UNDER MARIYANG DIVISION<br />

Name <strong>of</strong> Circle :- Boleng<br />

Name <strong>of</strong> Division :- Mariyang.<br />

FOOT SUSPENSION BRIDGE UNDER MARIYANG DIVISION<br />

1 C/O F.S.B. across siang river at Pamak (Span-300 Mtr). Upper Siang 7.80 10.01 17.81 17.81 0.00 0.00 17.81 100%<br />

2 C/o F.S.B. over river Yamne at Loggeng (Span 300 mtr) Upper Siang 12.30 16.98 29.28 10.00 10.00 34%<br />

Name <strong>of</strong> Circle :- Boleng<br />

Name <strong>of</strong> Division :- Yingkiong<br />

FOOT SUSPENSION BRIDGE UNDER YINGKIONG DIVISION


1 Improvement <strong>of</strong> Log Bridge <strong>of</strong> Porter/Mule Track leading to the International<br />

Border under Tuting Administrative HQ (424 mtr)<br />

2 Improvement <strong>of</strong> Foot Suspension Bridge on Porter/Mule Track leading to<br />

International Border under Tuting Administrative HQ (1700 mtr)<br />

Upper Siang 4.00 6.00 10.00 0.00 10.00 0.00 10.00 100%<br />

Upper Siang 11.00 19.00 30.00 0.00 30.00 0.00 30.00 100%<br />

SUB- TOTAL = 96.80 144.95 241.75 27.81 40.00 0.00 67.81 28%<br />

PORTER TRACK UNDER YINGKIONG DIVISION<br />

CIRCLE : BOLENG<br />

DIVISION : YINGKIONG<br />

PORTER TRACK UNDER YINGKIONG DIVISION<br />

1 C/o Porter/Mule Tracks from Jido to Bishing (97.00 Km) Upper Siang 4.00 6.00 10.00 0.00 10.00 0.00 10.00 100%<br />

NLCPR<br />

NAME OF CIRCLE : BOLENG CIRCLE<br />

NAME OF DIVISION : YINGKIONG DIVISION<br />

1 Construction <strong>of</strong> Motorable Suspension Bridge over river Siang at the site <strong>of</strong> Upper Siang 20.00 160.30 180.30 61.00 119.30 0.00 180.30 100%<br />

Gandhi Bridge.<br />

2 Construction <strong>of</strong> Steel Suspension Bridge over Siang River and Approach Roads Upper Siang 31.60 40.00 71.60 25.40 46.20 0.00 71.60 100%<br />

at Kodak near Tuting.<br />

3 Construction <strong>of</strong> Road from Jengging to Ramsing in Upper Siang District (35.00 Upper Siang 53.62 0.04 53.66 0.00 53.66 0.00 53.66 100%<br />

Km)<br />

SUB- TOTAL = 105.22 200.34 305.56 86.40 219.16 0.00 305.56 100%<br />

RIDF & CRF<br />

MARIYANG DIVISION<br />

PASIGHAT-DAMROH-MARIYANG ROAD (87.00 KM).<br />

1 E/Work, Culverts, Drain, Soling, WBM, B/Topping, R&B Wall i/c 7 nos<br />

Bridges.<br />

Upper Siang 45.00 59.98 104.98 0.00 0%<br />

YINGKIONG DIVISION<br />

1 RECONSTRUCTION OF 207 M LONGSTEEL SUSPENSION BRIDGE Upper Siang 163.30 200.02 363.32 0.00 330.04 330.04 91%<br />

OVER RIVER SIANG AT NUBO ON ROAD FROM 12 KM POINT OF<br />

YINGKIONG-ALONG BRTF ROAD TO RIGA AND KARKO<br />

SUB- TOTAL = 208.30 260.00 468.30 0.00 330.04 0.00 330.04


Total(PWd : Upper Siang) 535.62 788.18 1323.80 182.72 701.05 54.76 938.53 71%<br />

3 Roads<br />

NAME OF CIRCLE : TEZU CIRCLE<br />

NAME OF DIVISION : ANINI DIVISION<br />

73 KM POINT ON HUNLI - ANINI BRTF ROAD TO ANELIEH ( 15.00<br />

KM).<br />

1 Construction and Development <strong>of</strong> quarry road at Dibang (Dree) river bridge site Dibang valley 9.00 14.93 23.93 17.90 17.90 75%<br />

at Ch.5.00 Km on 173 Km BRO road to Anelieh (SH: F/Cutting & Soling - 2.50<br />

Km)<br />

2 Widening and improvement <strong>of</strong> curves and narrow road on 173 Km point on Dibang valley 8.25 11.03 19.28 14.00 14.00 73%<br />

BRTF road to Anelieh CO HQ (SH: Widening and improvement <strong>of</strong> curves and<br />

narrow reaches 5.40 Km & R/Wall & B/Wall-150 Mtr i/c slip clearance)<br />

3 Formation cutting 8.50 to 10.99Km (Ph-III) Dibang valley 6.35 10.00 16.35 8.35 8.35 51%<br />

4 Formation cutting. 12.99 - 14.85 Km. (Ph-V) Dibang valley 5.00 7.22 12.22 12.20 12.20 100%<br />

5 Soling and metalling 0 to 3.60 Km. Dibang valley 10.25 17.72 27.97 15.50 15.50 55%<br />

6 Black Topping '0 - 5.40 Km Dibang valley 9.10 13.98 23.08 9.00 8.75 17.75 77%<br />

7 Soling metalling 3.60 to 5.40Km (Balance phase-II Dibang valley 7.20 10.77 17.97 13.75 13.75 77%<br />

8 Both side approach road to Dibang Bridge Dibang valley 4.50 6.81 11.31 0.60 6.50 7.10 63%<br />

9 36.15 KM POINT OF HUNLI -ANINI BRTF ROAD TO KRONLI (21 Dibang valley 12.00 23.46 35.46 17.00 17.00 48%<br />

KM). (Formation cutting 0 - 7.00 km.)<br />

10 ANELIEH TOWNSHIP ROAD. (F/cutting, culvert, R&B Wall, soling 1.50 Dibang valley 4.00 0.02 4.02 3.40 3.40 85%<br />

Km & Log bridges 3 nos.)<br />

11 APPROACH ROAD FROM 56 KM HUNLI - ANINI BRTF ROAD TO Dibang valley 2.20 5.02 7.22 7.20 7.20 100%<br />

ARZOO PROPOSED CO HQ (1.50KM).(Metalling & Black topping (0.80<br />

Km))<br />

ANINI TOWNSHIP ROADS<br />

12 C/O Road from Assam Rifles camp to Cao village, (SH: Formation cutting 5.00Dibang valley 8.30 15.00 23.30 2.00 3.00 5.00 21%<br />

km).<br />

13 Improvement <strong>of</strong> Anini Township road (Lonka, Forest Colony Helipad, HS Dibang valley 10.00 20.98 30.98 6.10 24.00 30.10 97%<br />

School, Kopchi Line) (SH: F/C, Soling, WBM & Culverts)<br />

14 Improvement <strong>of</strong> Road from Old Bazar to Kango village Ph-II SH:-<br />

Dibang valley 5.50 9.00 14.50 2.60 11.90 14.50 100%<br />

WBM,S/C(1.5m span 2Nos,2m span 1No)<br />

15 ROAD FROM ANINI TO MALINYE VIA ATHRONLI ( 45.00 KM). Dibang valley 5.20 8.00 13.20 10.00 10.00 76%<br />

(C/O Mipi township road (SH: F/C 2.00 Km)<br />

16 ALINYE TOWNSHIP ROAD (SH : F/C, Soling & Drain 5.00 Km.) Dibang valley 8.40 18.98 27.38 1.55 20.35 21.90 80%


17 ETALIN TOWNSHIP ROAD (1.50 KM) (Improvement & widening <strong>of</strong> Dibang valley 7.30 11.02 18.32 0.00 12.00 12.00 66%<br />

Helipad road (SH: Widening, Soling & Metalling).)<br />

SUB-TOTAL = 122.55 203.94 326.49 21.85 205.80 0.00 227.65 70%<br />

Bridges<br />

NAME OF CIRCLE : TEZU CIRCLE<br />

NAME OF DIVISION : ANINI DIVISION<br />

ALINYE MATULI ROAD (13.50 KM)<br />

1 C/o RCC bridge at Ch. 10.33 km (Span-10 mtr) Dibang valley 10.30 12.83 23.13 2.50 10.00 12.50 54%<br />

ANINI TOWNSHIP ROAD<br />

2 C/o RCC bridge over Kopchi Nallah to DC <strong>of</strong>fice at Anini (span-10.00 mtr) Dibang valley 10.10 3.99 14.09 3.95 5.00 8.95 64%<br />

SUB-TOTAL = 20.40 16.82 37.22 6.45 15.00 0.00 21.45 58%<br />

Suspension Bridges<br />

CIRCLE : TEZU CIRCLE<br />

DIVISION : ANINI DIVISION<br />

FOOT SUSPENSION BRIDGES UNDER ANINI DIVISION.<br />

1 C/O suspension bridges on porter track from 173km BRTF road to Wanli Dibang valley 13.76 0.00 13.76 8.75 5.00 13.75 100%<br />

village 1 no.(span 140 mtrs.) Modified (200 mtrs.span)<br />

2 C/O supension bridge on porter track from Alinye 132 km BRTF road to Athro Dibang valley 19.60 20.01 39.61 14.25 25.36 39.61 100%<br />

Ashambra 2 nos. (span 160 mtr.)<br />

3 Spl. Repair <strong>of</strong> various FSB under Anini Division. (SH: Replacement <strong>of</strong> wire Dibang valley 14.35 10.00 24.35 11.00 13.35 24.35 100%<br />

rope, timber & Ballies etc.) for 40 nos FSB, total span 1500 mtr.<br />

4 C/o FSB over river Dibang on P/Track from Etalin to Ambolin via Asuli, Dibang valley 16.40 15.01 31.41 9.50 21.00 30.50 97%<br />

Apronli span 150mtr.<br />

5 C/o Foot suspension bridge over river Dree at Kaduli on Anini-Matuli porter Dibang valley 16.25 20.02 36.27 12.50 23.75 36.25 100%<br />

track (span-150.00 mtr)<br />

6 Improvement and strengthening <strong>of</strong> existing FSB over river Dibang at Ch. 5.40 Dibang valley 14.30 0.02 14.32 10.00 4.30 14.30 100%<br />

Km on 173 Km point on BRO road to Anelieh (span 150 mtrs) (SH:<br />

Improvement and strengthening 150 mtr and protection <strong>of</strong> left and right bank)<br />

7 C/o Foot Suspension Bridge on Porter/Mule Track from Dambuine to Dibang valley 15.00 25.00 40.00 0.00 39.50 39.50 99%<br />

Anzamkhola Pass via Bruni-5 Nos (370 mtr) (leading to international border).<br />

SUB-TOTAL (7 Nos Schemes)= 109.66 90.06 199.72 66.00 132.26 0.00 198.26 99%<br />

Porter Track


CIRCLE : TEZU<br />

DIVISION : ANINI<br />

PORTER TRACK/MULE TRACK UNDER ANINI DIVISION.<br />

1 C/o Mule Track from Aneliehto Chepe via Akuli, Genli & Adane (87 Km). Dibang valley 9.05 18.01 27.06 15.00 15.00 55%<br />

2 C/o P/Track from Etalin to Amboli via Asuli, Apronli 45 km. Dibang valley 3.32 0.00 3.32 3.30 3.30 99%<br />

3 C/o P/Track and Suspension bridge from Dambuine to Kangri via Bruni, Aguila Dibang valley 6.26 13.79 20.05 5.00 15.05 20.05 100%<br />

& Lama Camp (China border) - 104.00 Km<br />

4 C/o Mule Track from Malinye to Popu valley (105.00 Km) (Ph-I : 0 to 15.00 Dibang valley 8.31 0.00 8.31 8.30 8.30 100%<br />

Km)<br />

5 Special repair & Restoration <strong>of</strong> various Porter / Mule Tracks under Anini Dibang valley 1.89 0.00 1.89 0.90 0.90 48%<br />

Division.<br />

6 C/o Porter/Mule Track from Dambuine to Kangri & Lama camp (72.00 Km) Dibang valley 6.00 9.00 15.00 15.00 15.00 100%<br />

Sub- Total (5 Nos Schemes) 34.83 40.80 75.63 5.00 57.55 0.00 62.55 83%<br />

Total (PWD : Dibang Valley District)) 287.44 351.62 639.06 99.30 410.61 0.00 509.91 80%<br />

3 Roads<br />

NAME OF CIRCLE : TEZU CIRCLE<br />

NAME OF DIVISION : ROING DIVISION<br />

1 IDILI-JIA-ABALI ROAD, (13 KM)( Black Topping, 1.00 to 8.00 Km.) L/Dibang<br />

5.00 6.98 11.98 5.00 6.98 0.00 11.98 100%<br />

Valley<br />

2 ROAD FROM HUNLI-ANINI ROAD TO ALONI VILLAGE, (6 KM) L/Dibang<br />

1.96 0.00 1.96 0.00 1.96 0.00 1.96 100%<br />

(C/O 5 Nos slab culvert from ( 0 to 1 Km))<br />

Valley<br />

ROING TOWNSHIP ROADS<br />

L/Dibang<br />

Valley<br />

3 Road from Roing-Hunli Road to Sedimantation Tank via forest park (SH F/C, L/Dibang<br />

5.20 7.79 12.99 3.50 9.49 0.00 12.99 100%<br />

pavement carpeting & Cul- 1 No<br />

Valley<br />

4 Re-carpeting <strong>of</strong> colony road L/Dibang<br />

6.50 25.05 31.55 5.00 8.00 13.00 41%<br />

Valley<br />

DAMBUK TOWNSHIP ROAD<br />

L/Dibang<br />

Valley<br />

5 Recarpeting L/Dibang<br />

3.40 6.00 9.40 9.40 9.40 100%<br />

Valley<br />

6 Improvement <strong>of</strong> approach road to Helipad (Widening, culvert & Pavements). L/Dibang<br />

Valley<br />

4.45 5.98 10.43 9.00 1.43 10.43 100%


7 3.60 KM POINT OF ROING SIMARI BRTF ROAD TO ABALI, ( 8KM) L/Dibang<br />

1.40 2.02 3.42 0.85 1.65 2.50 73%<br />

(WBM & Recarpetting, 0 to 5.00 Km.)<br />

Valley<br />

8 BIZARI TOWNSHIP ROAD(Recarepting) L/Dibang<br />

1.45 1.00 2.45 2.45 2.45 100%<br />

Valley<br />

9 IDULI-HORUPAHAR ROAD ( 11 KM) (RCC slab culvert 0-26 Km 6 nos) L/Dibang<br />

2.80 0.00 2.80 1.00 1.80 2.80 100%<br />

Valley<br />

10 ROAD FROM BOMJIR TO AMARPURGHAT (E/Work & culvers(0-5 L/Dibang<br />

2.40 3.01 5.41 5.41 5.41 100%<br />

Km))<br />

Valley<br />

11 ROAD FROM DESALI TO RUNLI VIA MITAKA,(16 KM) (Formation L/Dibang<br />

5.55 7.00 12.55 12.55 12.55 100%<br />

cutting (2-5 Km))<br />

Valley<br />

12 LINK ROAD TO INTAYA VILLAGE (Formation cutting 0-5.00 Kms PH:-I L/Dibang<br />

3.60 5.42 9.02 0.00 8.40 8.40 93%<br />

0 to 3.210 Km)<br />

Valley<br />

13 LINK ROAD FROM ABALI TO HORUPAHAR, (5 KM) (WBM & Black L/Dibang<br />

2.50 3.48 5.98 1.75 2.30 4.05 68%<br />

Topping, 0 to 5.00 Km.)<br />

Valley<br />

14 EXTENSION & IMPROVEMENT OF IDULI - ABALI HORUPAHAR L/Dibang<br />

7.35 11.01 18.36 9.00 9.00 49%<br />

ROAD (2.30 TO 5.00 KM) (Soling & Metalling)<br />

Valley<br />

Sub- Total 53.56 84.74 138.30 37.95 68.97 0.00 106.92 77%<br />

Bridges<br />

NAME OF CIRCLE : TEZU CIRCLE<br />

NAME OF DIVISION : ROING DIVISION<br />

DAMBUK-PAGLAM ROAD (62.82 KM)<br />

1 Sub-Soil & Investigation for C/O 10 Nos. <strong>of</strong> bridges on realigned portion <strong>of</strong><br />

Dambuk - Paglam road i/c consultancy for Detail Design & Drawings <strong>of</strong> substructure,<br />

superstructure & protection works.<br />

L/Dibang<br />

Valley<br />

17.50 25.8 43.30 40.00 3.30 0.00 43.30 100%<br />

ABALI - HORUPAHAR ROAD<br />

2 C/O R.C.C. Bridge over Pulu Nallah 25 mtr span L/Dibang<br />

20.50 25.33 45.83 10.00 22.50 32.50 71%<br />

Valley<br />

Sub-Total 38.00 51.13 89.13 50.00 25.80 0.00 75.80 85%<br />

FOOT SUSPENSION BRIDGES UNDER ROING DIVISION<br />

CIRCLE : TEZU<br />

DIVISION : ROING<br />

FOOT SUSPENSION BRIDGES UNDER ROING DIVISION<br />

1 C/O Foot Suspension Bridge over Tamakang on Bizari Mopak (span 200 mtr) L/Dibang<br />

Valley<br />

13.30 0.00 13.30 5.00 10.00 15.00 113%


RIDF & CRF<br />

ROING DIVISION<br />

1 RCC BRIDGE OVER RIVER SISSRI ON DAMBUK-PAGLAM ROAD L/Dibang 220.00 330.08 550.08 55.00 160.00 215.00 39%<br />

Valley<br />

2 HUNLI-DESALI ROAD 138.80 209.13 347.93 160.00 187.93 347.93 100%<br />

Sub-Total 358.80 539.21 898.01 215.00 347.93 0.00 562.93 63%<br />

Total(PWD : Lower Dibang Valley District) 463.66 675.08 1138.74 307.95 452.70 0.00 760.65 67%<br />

3 Roads<br />

NAME OF CIRCLE : TEZU CIRCLE<br />

Name <strong>of</strong> Division :- Namsai Division<br />

1 MEDO TINGUA ROAD ( 9.64 KM ) (SBC, BC - 5.00 to 8.00 Km ) Lohit 5.50 10.50 16.00 0.17 15.83 16.00 100%<br />

2 MANMAO-MANFAISENG ROAD (4.00Km) (F/C-0 to 4.00Km.) Lohit 2.00 3.00 5.00 5.00 5.00 100%<br />

3 NAMSAI-DIYUN ROAD(32 KM.) UNDER NAMSAI (16 KM.) Lohit<br />

4 Recarpetting at various chainages Lohit 4.10 7.99 12.09 2.97 9.12 12.09 100%<br />

5 Re-carpeting at various colony road & culverts during 05-06 (SH: Re-carpeting- Lohit 4.05 6.00 10.05 4.05 6.00 10.05 100%<br />

1.50 Km)<br />

6 ROAD MANTHI TOWARDS TINGUA VIA INJO (15 KM.) (F/C- (10 to Lohit 6.25 12.00 18.25 17.25 17.25 95%<br />

15 Km.))<br />

7 ROAD FROM TOWAN VILLAGE TO GLOW LAKE (30 KM.) (F/C, 2 to Lohit 4.99 0.00 4.99 4.99 4.99 100%<br />

5 Km.)<br />

8 MAHADEVPUR TOWNSHIP ROADS. (Improvement <strong>of</strong> Mahadevpur<br />

Lohit 4.30 9.01 13.31 0.12 11.29 11.41 86%<br />

township road i/c new colony under Lekang circle (SH : WBM & B/T)<br />

9 ROAD FROM DOWSHUK VILLAGE AND NH - 52 VIA SENGSAP Lohit 4.50 6.50 11.00 0.90 10.10 11.00 100%<br />

VILLAGE (6.00Km.) (F/Filling (embankment) 0.00 to 3.56 Km.)<br />

10 APPROACH ROAD FROM BRTF TO PANKAO VILLAGE(2KM)<br />

Lohit 5.00 7.00 12.00 12.00 12.00 100%<br />

(E/Work & Culvert-0 to 2.00Km)<br />

11 IMPROVEMENT OF CHOWKHAM, ALUBARI & MOMONG<br />

Lohit 10.45 21.01 31.46 20.58 20.58 65%<br />

TOWNSHIP ROAD (3.50 KM) (SH: Soling, metalling, carpetting & WBM -<br />

3.50 Km)<br />

12 Road from "T" JUNCTION ROAD-DEBEN ROAD (47.15 KM)<br />

Lohit 2.55 0.00 2.55 2.46 2.46 96%<br />

(Formation Cutting & H/Pipe Culvert 0 to 4.00 km)<br />

13 ROAD FROM NAMSAI-DIYUN ROAD TO PANGEN VILLAGE (4.00<br />

KM) SBC & BC 4.00 Km (PH-I : J/C, Earthen embankment & SBC (0 to 2.00<br />

Km))<br />

Lohit 4.60 8.00 12.60 1.35 11.25 12.60 100%


14 ROAD FROM 3.50 Km. OF PIYONG -WINKO ROAD TO<br />

Lohit 9.75 12.99 22.74 0.00 0%<br />

NANGTAWSHYAM AND NANGTAWKHAMTI,(12 Km.) (E/W &<br />

culverts (2.00 to 5.705 Km.))<br />

Sub Total = 68.04 104.00 172.04 9.56 125.87 0.00 135.43 79%<br />

NAME OF CIRCLE : TEZU CIRCLE<br />

NAME OF DIVISION : TEZU DIVISION<br />

15 BRTF ROAD TO VKV VIA TAFRAGAM VILLAGE (9.00 KM) (Recarpetting<br />

Lohit 4.60 9.02 13.62 4.00 9.62 13.62 100%<br />

0 to 4.00 Km.)<br />

ROAD TO YEALIANG CIRCLE HQ (2.95 Km)<br />

Lohit<br />

16 C/O RCC slab 1 mtr span 6 Nos., 2 mtr span 4 Nos. & 4 mtr span 1 No. Lohit 8.50 10.48 18.98 12.00 6.98 18.98 100%<br />

17 Recarpetting <strong>of</strong> internal link road <strong>of</strong> Yealiang C.O. HQ from Tezu-Sunpura Lohit 2.00 4.00 6.00 2.00 10.00 12.00 200%<br />

road (SH: Recarptg - 1.25 km)<br />

18 Extension <strong>of</strong> road to Yealiang village & <strong>Govt</strong>. middle school from Yealiang Lohit 5.00 8.00 13.00 2.00 11.00 0.00 13.00 100%<br />

C.O. HQ (Length- 1.50 km) (Ph-I) (SH:- Rd. formation., SBC, BC & BT =<br />

0.70 Km)<br />

19 ROAD TO DOORAH NALLAH MHS AT TAFRAGAM (5 KM)<br />

Lohit 2.50 3.50 6.00 0.00 0.00 0%<br />

(Improvement <strong>of</strong> road from BRO road to Doorahnallah hydel (PCL) via<br />

Changliang village (SH:- Pot holles repair, carpetting & Re-carptg. 1.00 Km (0<br />

- 1.00 Km))<br />

TEZU TOWNSHIP ROAD(30 KM)<br />

Lohit<br />

20 C/o RCC slab culvert 4 m span 1 no & 1 m span 3 nos. Lohit 2.10 3.99 6.09 6.09 6.09 100%<br />

21 Approach road to Magazine bldg. At Tezu from Shivijinagar Road (0-3 Km) Lohit 1.99 0.00 1.99 1.99 1.99 100%<br />

SH:- FC, Sol, WBM, BT (0.24 Km)<br />

22 Improvement <strong>of</strong> road in Nirman Sadan complex Tezu (SH: Re-carpetting & Lohit 1.30 0.00 1.30 1.30 0.00 1.30 100%<br />

side drain - 1.50 Km)<br />

23 C/o road from BRO road to Mepo basti via Danglat village(L= 2 Km) Ph-I- (0 Lohit 2.50 3.50 6.00 6.00 6.00 100%<br />

to 0.70 Km) (SH:- Rd. formation, SBC)<br />

24 C/o road from Pomliang village to upper Loiliang village via Huchakailiang Lohit 1.60 2.30 3.90 3.90 0.00 0.00 3.90 100%<br />

village & Loiliang primary health centre- 2.20 km Ph-I- 0 to 0.70 Km (SH:-<br />

RD. formation, Soling)<br />

25 Approach road from <strong>Govt</strong>. Sec. School to Steel Bridge over Denning Nallah Lohit 1.38 0.00 1.38 0.00 1.38 0.00 1.38 100%<br />

(0.40 Km) (SH: Base Course - 0.40 Km & B/T-0.40 Km)<br />

26 Improvement <strong>of</strong> Tamlanagar colony road, Length- 2.50 km (SH:- BC= 0.20 Lohit 3.15 5.00 8.15 3.00 5.15 8.15 100%<br />

Km, BT= 1.50 km) at Ch. 0 km - 1.50 km.<br />

TEZU SUNPURA ROAD (16.27 KM)<br />

Lohit


27 Impvt. Of old NH-52 upto take <strong>of</strong>f point <strong>of</strong> New alignment road near Kalikholla<br />

7.62 Km. SH:-E/W-2.98 Km, Metalling-4.495 Km,Surfacing-4.495 Km.<br />

Lohit 5.60 8.49 14.09 5.00 9.09 0.00 14.09 100%<br />

28 Improvement <strong>of</strong> Tezu Sunpura road (16.165 Km) SH:- Soling, WBM, BT Lohit 10.35 18.01 28.36 5.00 23.36 28.36 100%<br />

between chainage - 13.165 km to 16.165 km<br />

29 C/o road from Tezu-Sunpura road to Chailing vill Length= 1 Km (Ph-I) (SH:- Lohit 2.00 4.00 6.00 6.00 6.00 100%<br />

R/F & SBC - 0.70 km)<br />

30 C/o road from Tezu-Sunpura road to Chailing vill Length= 1.00 Km (SH:- C/o Lohit 1.40 2.02 3.42 3.30 0.12 0.00 3.42 100%<br />

RCC slab culvert <strong>of</strong> 2 mtr span-1 No. & 1 mtr span-1 No at chainages 0.25 km<br />

& 0.580 km)<br />

31 ROAD TO 19TH MILE AND 2OTH MILE AT SUNPURA CIRCLE (1.00 Lohit 1.40 2.02 3.42 3.42 3.42 100%<br />

KM) (C/o RCC S/Cul-1 mtr span- 1 No. and 2 mtr span-1 No. at Ch. 0.005 km<br />

& 0.680 km)<br />

32 SUNPURA TOWNSHIP ROAD (Re-carpetting <strong>of</strong> Sunpura Township road Lohit 4.50 6.50 11.00 3.00 8.00 11.00 100%<br />

(2.50 Km))<br />

33 IMPROVEMENT OF ROAD FROM TEZU TRIJUNCTION TO<br />

Lohit 15.85 32.01 47.86 15.00 32.86 47.86 100%<br />

LOHITPUR (12.00 KM) (Re-carpetting )<br />

34 C/O 4 Nos RCC Slabs/Culverts in Tezu - Sunpura Road Lohit 3.40 4.01 7.41 0.00 7.41 0.00 7.41 100%<br />

Sub- Total = 81.12 126.85 207.97 58.20 149.77 0.00 207.97 100%<br />

Bridges<br />

Name <strong>of</strong> Circle :- Tezu Circle<br />

Name <strong>of</strong> Division :- Namsai Division<br />

PIYONG-JENGLAI-WINKO ROAD (8.00 KM.).<br />

1 C/o W/ing walls approach road & protection work at Ch:- 3.45 Km. Lohit 12.40 0.00 12.40 6.20 6.20 12.40 100%<br />

EMPHONG TO EMPHUM VIA MANKAO ROAD (3.52 KM.)<br />

2 C/O B/Bridge over river Tissue at Ch:- 1.50 Km. (Span 40.00 Mtrs.) Lohit 26.20 42.25 68.45 0.00 30.84 30.84 45%<br />

CHOWKHAM TO EMPHUM ROAD VIA NAMLIANG MIMI<br />

3 C/o RCC bridge over river Mimey at Ch:- 9.27 Km. (Span 10 Mtr.) Lohit 12.67 0.00 12.67 0.00 9.06 9.06 72%<br />

PIYONG TO PANGEN ROAD (12.00 KM)<br />

4 C/o Steel/RCC bridge over Jenthu Nallah at Ch. 8.50 km (span 40 mtrs) Lohit 30.40 115.62 146.02 2.04 80.31 82.35 56%<br />

PIYONG -WINKO ROAD<br />

5 Reconstruction <strong>of</strong> steel bridge (span-25.00 mtr) over Jenthu on Piyong-Jenglai-<br />

Winko road on 3.45 km.<br />

Lohit 10.15 17.01 27.16 27.16 27.16 100%<br />

NAME OF CIRCLE : TEZU CIRCLE<br />

NAME OF DIVISION : TEZU DIVISION<br />

ROAD FROM LOHITPUR TO PAYA VIA BEKHULIANG (25 KM)


7 C/o Causeway on river Haju on Paya Bekhuliang Road, length-200 mtr. Lohit 7.60 12.01 19.61 19.61 19.61 100%<br />

TEZU TOWNSHIP ROAD (28.53 KM)<br />

8 C/O Causeway length-70 Mtr at Denning Nallah on Bypass road from Tezu Lohit 8.90 12.02 20.92 0.00 0%<br />

Shivijingar Road to Makaliang & New Mekaliang Village.<br />

ROAD FROM HATIDHUBA FROM TEZU SUNPURA ROAD (L-4.200<br />

KM)<br />

9 SH:C/o Bailey/ steel bridge over nallah 16th Mile <strong>of</strong> 15mtr span 1 No. at<br />

Ch.4.200 Km<br />

Lohit 10.50 15.94 26.44 15.00 11.44 0.00 26.44 100%<br />

FOOT SUSPENSION BRIDGES UNDER TEZU DIVISION<br />

CIRCLE : TEZU<br />

DIVISION : TEZU<br />

124 C/o FSB over Tezu Kholla between Tezugam & Shivajinagar at Tezu (Span-50 Lohit 9.98 7.60 17.58 0.00 0%<br />

mtr)<br />

Sub- Total = 128.80 222.45 351.25 23.24 184.62 0.00 207.86 59%<br />

NEC<br />

Name <strong>of</strong> Circle : TEZU CIRCLE<br />

Name <strong>of</strong> Division : Namsai Division<br />

7 Upgradation <strong>of</strong> Digboi - Pengri - Bordumsa - Namchik - Mahadevpur Road Lohit 55.70 100.01 155.71 20.88 115.98 136.86 88%<br />

(13.00 Km)<br />

Total (PWD : Lohit District) 333.66 553.31 886.97 111.88 576.24 0.00 688.12 78%<br />

4 Roads<br />

Name <strong>of</strong> Circle : Tezu Circle<br />

Name <strong>of</strong> Division : Hayuliang Division<br />

HAYULIANG-GOILIANG ROAD (15.00 KM)<br />

1 Clearing <strong>of</strong> land slides and slips etc. from 12.00 to 15.00 Km Anjaw 5.85 11.02 16.87 0.00 0%<br />

2 C/o Magazine Building for PWD at Hayuliang Anjaw 5.20 8.00 13.20 13.00 13.00 98%<br />

3 HAYULIANG - CHEQUENTY BRTF ROAD TO SUPPLIANG, (10.05 Anjaw 2.50 3.50 6.00 0.69 0.69 12%<br />

KM) (Formation cutting ,6.50-8.50 km.)<br />

4 KHUPA TAFRALIANG ROAD (5.00 KM) (C/O R/Wall, B/wall and<br />

Anjaw 2.45 2.99 5.44 5.40 5.40 99%<br />

Culvert.)<br />

5 CHUNGUNG-WALLA TO HAWAI TOWNSHIP ROAD TO PROTECT<br />

ROAD AND CHUNGUNG WALLA VILLAGE (SH: R/Wall & B/Wall 210<br />

mtr length and 6 mtr height)<br />

Anjaw 0.99 0.00 0.99 0.12 0.12 12%


6 ROAD FROM TAFRALIANG TO TAHOGAM, (8.00 KM). (Formaton Anjaw 3.60 4.99 8.59 0.00 8.59 0.00 8.59 100%<br />

cutting (2-3.30 km).)<br />

7 KHUPA-TAFRALIANG - CHUNGA ROAD (Foration cutting, 3.50 kms (Ph-<br />

Anjaw 5.25 6.00 11.25 10.22 10.22 91%<br />

I : F/C 0.1.87 kms).)<br />

8 HAYULIANG TOWNSHIP ROADS, (3.12 KM). (Extension <strong>of</strong> road from Anjaw 2.00 2.83 4.83 2.38 2.38 49%<br />

Hayuliang Township toThanda- pani (1.50 km))<br />

KHUPA TOWNSHIP ROAD Anjaw 0.00<br />

9 C/O approach Road to newly constructed PWD. staff Qtr (SH: F/C, WBM, BT, Anjaw 2.55 4.50 7.05 6.48 6.48 92%<br />

Culvert 0.50km)<br />

10 Khupa Township road culvert & Storm water Drain 2.00 km Anjaw 10.05 27.00 37.05 36.72 36.72 99%<br />

11 HAWAI TOWNSHIP ROAD (C/o approach road form Hawai township to Anjaw 3.00 4.03 7.03 0.00 7.03 0.00 7.03 100%<br />

Chungung & Walla villages (E/Work 0-3.00km))<br />

12 ROAD FROM 50 KM POINT OF HAYULIANG - WALONG BRTF Anjaw 3.80 5.59 9.39 0.00 0%<br />

ROAD TO SUNG VIA MANGKHONG AND CHANDUN (16.00 KM)(<br />

Formation Cutting, 0 to 1.50 km)<br />

13 ROAD FROM HAWAI EAC HQ TO MANCHAL ADMINISTRATIVE<br />

CENTRE, (32 KM). (Formation cutting 0 to 2.00 kms)<br />

Anjaw 2.00 2.97 4.97 0.00 0%<br />

14 ROAD FROM CHEQUENTY TO HALAIKRONG VIA SURNUNG,18.00<br />

KM. (C/o road from BRTF road to Tenai bridge point via Halipad and<br />

School,(E/Work 1.34 km) (SH: Widening & S/ Filling-2.26 km)<br />

15 WALONG TOWNSHIP ROAD (C/o Road from BRTF road to I.B. 2.00 km<br />

(SH: Widening, Culverts-2 Nos, R/Wall and B/Wall-2.00 km.)<br />

16 YATONG TOWNSHIP ROAD. (Extertion <strong>of</strong> Yatong township road (SH : E/<br />

Work,(Soling & R&B Wall1.80 kms).<br />

17 KHERANG TOWNSHIP ROAD. (C/o approach road from BRTF road to<br />

kherang town, 1.20 km (E/Work &R/Wall).<br />

18 ROAD TO HAWAI FROMCHEQUENTY POINT ON HAYULIANG -<br />

WALONG BRTFROAD ( 7.86KM ) (C/O Approach Road including<br />

construction <strong>of</strong>breast wall at Chequentyside ( 160 mtr )<br />

19 INTERNAL ROAD TO V.K.V AMLIANG (Recarpeting side drainage and<br />

Culvert,)<br />

20 ROAD FROM GOILIANG TONILANG, ( 3 KM) (Formation Cutting - 1 to<br />

3 km.)<br />

21 GOILIANG TOWNSHIP ROAD (Goiliang Township road-1.00 km (F/C,<br />

Sol, WBM & BT)<br />

Anjaw 3.00 4.38 7.38 6.56 6.56 89%<br />

Anjaw 1.00 0.00 1.00 0.00 0%<br />

Anjaw 2.00 2.46 4.46 0.00 0%<br />

Anjaw 3.00 5.02 8.02 7.45 7.45 93%<br />

Anjaw 4.70 6.99 11.69 5.82 5.82 50%<br />

Anjaw 1.00 1.02 2.02 0.00 0%<br />

Anjaw 2.00 2.51 4.51 0.00 0%<br />

Anjaw 8.15 16.01 24.16 8.17 8.17 34%


22 ROAD FROM 103 KM POINT OFBRTF ROAD TO BARFOO<br />

Anjaw 3.30 4.98 8.28 0.00 0%<br />

VILLAGE(35 KM) (Formation Cutting 0 to 3 kms.)<br />

Sub - Total 77.39 126.79 204.18 18.40 100.23 0.00 118.63 58%<br />

Bridges<br />

Name <strong>of</strong> Circle : Tezu Circle<br />

Name <strong>of</strong> Division : Hayuliang Division<br />

ROAD TO HAWAI FROM CHEQUENTY POINT ON HAYULIANG-<br />

WALONG BRTF ROAD 7.86 KM.<br />

1 C/o Approach road on Hawai side (SH : C/o <strong>of</strong> viaduct <strong>of</strong> span 51 mtr.) Anjaw 12.55 17.99 30.54 0.00 0%<br />

Suspension Bridges<br />

Name <strong>of</strong> Circle : TEZU<br />

Name <strong>of</strong> Division : HAYULIANG<br />

FOOT SUSPENSION BRIDGE UNDER HAYULIANG DIVISION.<br />

1 C/o foot suspension bridge over river Lohit at Ampani point to connect<br />

Anjaw 6.95 0.02 6.97 0.00 0%<br />

Khrolang, 285 mtrs.<br />

2 C/O FSB over river Lohit at Paya to connect Zapaliang Lamaliang & other Anjaw 20.00 30.93 50.93 21.12 21.12 41%<br />

villages on the left bank.<br />

3 C/O FSB on Chakrapani to connect Krosam & Jong (span-110mtr) Anjaw 5.20 7.00 12.20 3.09 3.09 25%<br />

4 C/O FSB over river Kulung at Bhaw(span - 80mtr) Anjaw 6.20 6.02 12.22 6.27 6.27 51%<br />

5 C/o F.S.B. over river Tol Pani in between Naraliang to Khroliang (span 90 mtr) Anjaw 8.05 7.99 16.04 10.64 10.64 66%<br />

6 C/o foot suspension bridge over river Lohit to connect Khrowti village (span Anjaw 20.30 29.02 49.32 16.70 16.70 34%<br />

210 mtr)<br />

7 C/o foot suspension bridge over river Lohit to connect Lautal and Wamliang Anjaw 23.85 29.99 53.84 12.86 12.86 24%<br />

(span 195 mtr)<br />

8 C/o foot suspension bridge over river Lohit at Swami Camp to connect<br />

Anjaw 20.25 26.02 46.27 36.89 36.89 80%<br />

Kimtong, Netong & Neluliang village on the left bank (span 230.00 mtr).<br />

9 C/o foot suspension bridge over river Lathi in between Nukung & Hawai to Anjaw 15.00 19.99 34.99 1.96 1.96 6%<br />

connect Lathi village (span 150.00 mtr)<br />

10 C/o foot suspension bridge over river Lohit to connect Kaho village (span 220 Anjaw 28.20 30.16 58.36 19.39 19.39 33%<br />

mtr)<br />

11 C/o Foot Suspension Bridge over river Dalai at Chaglagam (span 120 mtr) Anjaw 20.00 28.00 48.00 19.60 19.60 41%<br />

Sub - Total 174.00 215.14 389.14 0.00 148.52 0.00 148.52 38%


Porter Tracks<br />

CIRCLE : TEZU<br />

DIVISION : HAYULIANG<br />

PORTER TRACKS UNDER HAYULIANG DIVISION.<br />

1 C/o porter track from phanglonglat to Sangung via Thong, Khromblaighat, Anjaw 0.89 0.00 0.89 0.83 0.83 93%<br />

Kanji, Chambab, Khlamuk & Loilang, (48 km).<br />

2 C/o Porter Track from Pagung to Longjan via Gap, Hologung & Chowoliang, Anjaw 0.64 0.00 0.64 0.25 0.25 39%<br />

(31 km).<br />

3 Special repair <strong>of</strong> P/T from Thuchu & Thichu village (110 km) under Kibithoo Anjaw 8.25 9.99 18.24 0.00 0%<br />

Circle.<br />

4 C/o P / Track from Shirong to Yasung via Krowti on left bank <strong>of</strong> Lohit river Anjaw 5.42 0.00 5.42 0.00 0%<br />

30.00 km<br />

5 C/o P / Track from Shirong Pass to Burma Border Anjaw 8.10 6.99 15.09 8.37 8.37 55%<br />

6 C/o P / Track from Chequenty to Hoot Pass (50.00 km) Anjaw 5.00 5.01 10.01 0.00 10.01 0.00 10.01 100%<br />

7 C/o Porter/Mule Track from Kibithoo to Faulad Pass via Parkar, Tasi (60.00 Anjaw 6.00 9.00 15.00 8.31 8.31 55%<br />

Km)<br />

Sub - Total 34.30 30.99 65.29 0.00 27.77 0.00 27.77 43%<br />

NLCPR<br />

NAME OF CIRCLE : TEZU CIRCLE<br />

NAME OF DIVISION : HAYULIANG DIVISION<br />

1 Construction <strong>of</strong> Motorable Bridge over river Lohit to connect Manchal<br />

Administrative Circle (span 156.55 Mtr)<br />

Anjaw 22.70 49.98 72.68 0.00 72.68 0.00 72.68 100%<br />

Total (PWD; Anjaw District) 320.94 440.89 761.83 18.40 349.20 0.00 367.60 48%<br />

4 Roads<br />

Name <strong>of</strong> Circle : Jairampur Circle<br />

Name <strong>of</strong> Division : Jairampur Division<br />

1 KAMCHI-KAMDU ROAD (10.50 KM) (SBC - 1.46 to 5 Km & BC - 0 to 3 Changlang 4.20 8.00 12.20 12.20 12.20 100%<br />

Km.)<br />

2 KOVIN-TAIPONG-HONGKAP (3.60 KM) (S/Culvert 2 mtr span-2 nos & Changlang 3.00 5.00 8.00 7.99 7.99 100%<br />

H/P Cul-6 nos)<br />

3 RIMA-MOTONGSA ROAD (30 KM) (F/Cutting 0 to 5 Km) Changlang 4.60 5.99 10.59 10.58 10.58 100%<br />

4 MIAO-VIJOYNAGAR ROAD (157 KM) (Consultancy Services for<br />

Environmental impact assessment and clearance from Central Ministry.)<br />

Changlang 10.70 18.01 28.71 0.01 0.01 0%


5 NAMSAI-DIYUN ROAD (16.00 KM UNDER JAIRAMPUR DIVISION)<br />

(Recarpeting 0 to 2.00 Km (from Diyun end) (Ph-I : strengthening <strong>of</strong> base<br />

course by repair <strong>of</strong> pot holes & resurfacing, 0.20 Km to 1.37 Km))<br />

Changlang 2.00 3.00 5.00 5.00 5.00 100%<br />

6 NAMPONG TOWNSHIP ROAD (F/C & WBM (1.00 km) Changlang 3.20 4.79 7.99 0.00 8.19 0.00 8.19 103%<br />

7 NAMPHAI-II TO NEW KHAMLANG VIA PLONE VILLAGE, OLD Changlang 4.00 4.99 8.99 8.99 8.99 100%<br />

CHAMPU - I & II (10 KM) (Soling & Metalling - 0 to 2 Km.)<br />

8 APPROACH ROAD TO ITI COMKPLEX AT BALINANG (3 KM) Changlang 6.00 10.99 16.99 16.97 16.97 100%<br />

(F/Filling - 2 Km & Soling - 3 Km.)<br />

9 APPROACH ROAD FROM ENGINEERING COLONY ROAD TO Changlang 1.99 0.00 1.99 1.99 1.99 100%<br />

CATHOLIC CHURCH AT UPPER COLONY MIAO (S.B.C., B.C. &<br />

Carpeting - 0.200 Km)<br />

10 ROAD FROM NINGRANG TO SANGWAL KHAMLANG VIA TIKHAK Changlang 3.70 4.02 7.72 0.00 7.72 0.00 7.72 100%<br />

KHAMLANG (6.00 KM) (Formation Cutting, 0 to 2.00 Km)<br />

11 APPROACH ROAD FROM 0.200 KM POINT AT JAGUN-MIAO ROAD Changlang 3.00 4.00 7.00 7.00 7.00 100%<br />

TO LISU COMPLEX (SBC & WBM-1.00 Km (Ph-I : F/F-0.90 Km, GSB &<br />

WBM-0.60 Km)<br />

12 ROAD FROM JAIRAMPUR TO CHAMRO VILLAGE VIA NEW Changlang 4.10 5.99 10.09 10.09 10.09 100%<br />

KHAMDU VILLAGE (2.08 KM) F/Filling and F/Cutting - 2.08<br />

Km(F/Filling and F/Cutting - 2.08 Km)<br />

13 BORDUMSA-LALUNG VILLAGE ROAD (8 KM) Bordumsa to Lalung<br />

Village (F/Filling 0 to 8 Km) (SW: F/F = 2 km, B.C = 2 km & HPC = 8 nos.))<br />

Changlang 1.60 2.41 4.01 4.01 4.01 100%<br />

14 LUNGPONG POINT TO NEW TIKHAK-PUTOK (9.57 KM).(Ph-I 0 to 2 Changlang 3.35 4.00 7.35 7.35 7.35 100%<br />

Km Resoling - 2 Km.)<br />

Sub- Total = 55.44 81.19 136.63 0.00 108.09 0.00 108.09 79%<br />

NAME OF CIRCLE :- JAIRAMPUR CIRCLE<br />

NAME OF DIVISION :- CHANGLANG DIVISION<br />

15 ROAD TO OLD-LINGOK, (20 Km) (Formation cutting, 0-5.00 Km (5.00 Changlang 2.00 0.00 2.00 2.00 2.00 100%<br />

Km)<br />

ROAD TO NAMTOK - NGOITANG-THAMIYANG FROM 37 KM<br />

0.00 0.00<br />

POINT OF M.C. ROAD (55 KM)<br />

16 Formation cutting - 5-10 km. Changlang 5.00 9.00 14.00 0.00 14.00 0.00 14.00 100%<br />

17 Slab Culverts 0.000 to 5.000 km (1 m span - 2 Nos. & 2m span-1No.) Changlang 3.05 3.99 7.04 3.05 3.99 7.04 100%<br />

CHANGLANG-KHONSA ROAD, (23 KM UNDER CHANGLANG<br />

DIVISION)


18 WBM & B/T, 0 to 16.00 Km (Ph-I : 1.35 Km to 2.85 Km) Changlang 4.55 9.00 13.55 4.55 9.00 13.55 100%<br />

19 C/o R.C.C slab Culverts 0- 17.40 Km (Span - 3 mtr) 15 Nos. Changlang 6.20 11.80 18.00 6.20 11.80 18.00 100%<br />

20 C/o R/Wall & B/Wall up to 16 km - 100 mtrs. Changlang 3.55 4.02 7.57 3.55 3.55 7.10 94%<br />

CHANGLANG-KENGKHU-RANGKATOO ROAD, 12 KM<br />

21 Protection <strong>of</strong> sinking zone at Ch.0.000 - 5.000 km (R/Wall-100 m, B/Wall - 100 Changlang 3.00 4.01 7.01 3.00 4.01 7.01 100%<br />

m & C.C. Drain - 100 mtr) boulder created wall (SH:- R/wall - 90 mtr)<br />

22 Soling at Ch. 4.700 km to 5.700 km near Simrang Village. Changlang 2.70 0.02 2.72 0.00 0.00 0%<br />

23 C/o R.C.C box culvert - 4 mtr span - 1 No. at Ch.- 1.300 km Changlang 3.20 0.01 3.21 0.00 3.20 0.00 3.20 100%<br />

CHANGLANG-KHIMIYANG ROAD (35.10 Km)<br />

25 SH:- Slab culverts, R/Wall & B/Wall in between chainage 6.00 to 8.50 km. Changlang 1.55 2.52 4.07 1.55 2.52 4.07 100%<br />

26 SH:- Base course from 27.000 km to 32.000 km (SH:- 27.000 to 30.500 km) Changlang 4.95 8.00 12.95 0.00 12.95 0.00 12.95 100%<br />

27 KHIMIYANG - SANGKHUHAVI ROAD ( 23.680 KM) (SH:- F.C. 23.000 Changlang 10.70 18.60 29.30 0.00 29.30 0.00 29.30 100%<br />

to 27.000 km.)<br />

28 ROAD TO LANGCHUK (10 KM) (SH:- F.C. 4.500 km to 6.000 km) Changlang 2.50 3.72 6.22 3.72 0.00 3.72 60%<br />

YANMAN-THAMIYANG ROAD, (15.20 Km)<br />

29 BT, 0-3 Km Changlang 3.48 0.00 3.48 0.00 3.48 0.00 3.48 100%<br />

30 Formation Cutting - 9.50 to 13.00 km. Changlang 8.20 13.81 22.01 0.00 22.01 0.00 22.01 100%<br />

31 CHANGLANG TOWNSHIP ROADS (SH:- Soling, Metalling & Carpetting<br />

in New Officer's colony (SBC,BC & BT-2 Km) (PH:-I-1.170 km))<br />

Changlang 2.00 3.00 5.00 2.00 3.00 5.00 100%<br />

32 CHANGLANG-KHIMIYANG ROAD TO YANMAN VILLAGE( 1 KM) Changlang 3.25 0.02 3.27 3.27 0.00 3.27 100%<br />

(SH:- S.B.C - 0.000 to 1.000 km.)<br />

NAMTOK TOWNSHIP ROAD<br />

33 Soling & metalling <strong>of</strong> Namtok Township road (Ph-III) Changlang 3.05 4.00 7.05 7.05 0.00 7.05 100%<br />

34 Soling, metalling & Carpetting <strong>of</strong> Namtok Township road (2.00 km) Changlang 4.70 7.00 11.70 4.70 7.00 11.70 100%<br />

35 Road from Namtok to C.O. Office & Helipad (SH:- Soling & metalling <strong>of</strong> Changlang 3.55 4.99 8.54 3.55 4.99 8.54 100%<br />

Namtok Township road) ( L-0.600 km Ph:-II)<br />

36 R.C.C Slab Culverts (2 m span - 1 No. & 4 m span- 1 No) Changlang 3.45 3.99 7.44 3.45 3.99 7.44 100%<br />

Sub- Total = 84.63 111.50 196.13 0.00 136.58 53.85 190.43 97%<br />

Bridges<br />

Name <strong>of</strong> Circle : Jairampur Circle<br />

Name <strong>of</strong> Division : Jairampur Division<br />

KAMCHI-KAMDU ROAD ( 10.50 KM)<br />

1 C/O 2 nos. steel bridge at ch. 5 km & 7.80 km ( span 10 & 8 mtr respectively)<br />

Actual span 15 mtr each<br />

Changlang 10.58 15.26 25.84 3.48 14.98 18.46 71%


ROAD FROM NAMPONG TO TENGPONG VIA RIMA TIKHAK<br />

PUTHAK (26.00 KM)<br />

2 C/O 3 nos steel bridge 15 mtr span each at Ch. 15.90 Km, 17.70 Km & 20.93 Changlang 13.67 0.00 13.67 0.24 11.09 11.33 83%<br />

Km. (SH - 5 Nos RCC S/Cul 6 mtr span each at Ch. 15.90, 17.10, 17.30, 17.96<br />

& 20.93 Km)<br />

MIAO-VIJOYNAGAR ROAD (157 KM)<br />

3 C/O Steel Bridges at 50.65 Km (Span 18.75 mtr) Changlang 8.00 12.82 20.82 13.30 13.30 64%<br />

MANMAO-TENGMAN ROAD.<br />

4 C/O Steel Bridge over Namchik River (Span 40 Mtr.) (Actual Span 36 Mtr.). Changlang 6.90 8.01 14.91 14.50 0.40 14.90 100%<br />

NAMPHAI-I TO NEW KHAMLANG ROAD.<br />

5 C/O RCC Bridge over Namphai Nallah at Ch. 0.10 Km (Span 20 Mtr.) Changlang 12.55 17.86 30.41 30.00 0.41 30.41 100%<br />

NAME OF CIRCLE :- JAIRAMPUR CIRCLE<br />

NAME OF DIVISION :- CHANGLANG DIVISION<br />

LONGKAI-MOKTOWA ROAD (9.10 KM)<br />

6 C/o Steel/Bailey Bridge over River Chitung <strong>of</strong> 30 mtr span Changlang 8.70 13.01 21.71 8.70 13.01 21.71 100%<br />

Sub- Total = 60.40 66.96 127.36 44.50 26.53 39.08 110.11 86%<br />

RIDF & CRF<br />

JAIRAMPUR DIVISION<br />

1 IMPROVEMENT OF NAMPONG TO RIMA PUTOK ROAD IN<br />

CHANGLANG DISTRICT<br />

Changlang 63.30 70.01 133.31 133.00 0.31 133.31 100%<br />

NEC<br />

Name <strong>of</strong> Circle : JAIRAMPUR CIRCLE<br />

Name <strong>of</strong> Division : Jairampur Division<br />

1 Upgradation <strong>of</strong> Digboi - Pengri - Bordumsa - Namchik - Mahadevpur Road<br />

(27.00 Km)<br />

Changlang 128.60 200.00 328.60 71.95 224.09 0.00 296.04 90%<br />

Name <strong>of</strong> Circle : JAIRAMPUR CIRCLE<br />

Name <strong>of</strong> Division : Changlang Division<br />

2 Changlang - Margherita Road (37.48 Km) Changlang 1.00 0.00 1.00 0.00 0%


Sub- Total = 129.60 200.00 329.60 71.95 224.09 0.00 296.04 90%<br />

Total( PWD : Changlang District) 393.37 529.66 923.03 249.45 495.60 92.93 837.98<br />

3 Roads<br />

Name <strong>of</strong> Circle : Jairampur Circle<br />

Name <strong>of</strong> Division : Khonsa Division<br />

BOGAPANI-NAKFAN ROAD (6.10 KM)<br />

1 C/o Both side approach road to bridge over river Dilli/Tissa (SH: Protection Tirap 3.95 6.02 9.97 8.22 8.22 82%<br />

Wall, WBM & B/T-200 Mtr)<br />

2 SBC, 0.00-6.00 Km (Sh: 0.00-2.800 Km). Tirap 2.65 0.00 2.65 1.00 1.00 38%<br />

NAMSANG-KHELA ROAD<br />

3 R/Wall & B/Wall, 0.00 to 10.50 km Tirap 2.40 3.60 6.00 1.34 1.34 22%<br />

4 F/C, 23.00 to 25.70 km (2.70 km) Tirap 3.60 5.38 8.98 9.52 5.46 14.98 167%<br />

5 SOHA-NAMTOK ROAD (38.00 Km).(Formation Cutting, 18.00-16.00 km Tirap 3.25 4.82 8.07 0.00 14.75 0.00 14.75 183%<br />

(SH: 18.080 to 16.680 Km))<br />

CHANGLANG-KHONSA (41.00 KM UNDER KHONSA DIVISION)<br />

6 Re-construction <strong>of</strong> RCC slab culvert at Ch. 13.05 Km (SH: Slab Culvert 4.00 Tirap 5.01 0.00 5.01 0.00 5.00 0.00 5.00 100%<br />

mtr span-1 No)<br />

7 Improvement <strong>of</strong> existing pavement (SH: Ph-I : WBM-II 0.00 to 8.00 Km) Tirap 6.95 11.99 18.94 0.00 0.13 10.00 10.13 53%<br />

ROAD TO LONGBOO VILLAGE, (22.00 KM).<br />

8 Culverts, 7.20-11.00 Km. Tirap 2.95 1.02 3.97 0.00 3.97 3.97 100%<br />

9 Slab Culverts 4 mtr span - 6 nos between 7.20 to 12.00 km (SH: C/o 4 mtr span Tirap 2.05 3.02 5.07 0.00 0.00 0%<br />

2 nos)<br />

10 Realignment 0.00 to 3.00 Km Tirap 2.75 4.01 6.76 9.16 9.16 136%<br />

11 ROAD TO NGOITANG, (15.00 KM). (Culvert, 0 to 3.00 Km (SH: HP C ul- Tirap 4.00 7.99 11.99 5.00 6.99 11.99 100%<br />

10 Nos))<br />

12 TUPI-DADAM ROAD (9.50 KM) (Re-alignment - 1.00 Km from chainage Tirap 3.20 4.80 8.00 3.16 0.00 3.16 40%<br />

5.00 to 6.00 Km (Formation Cutting-1.00 Km))<br />

DADAM-TISSA ROAD (20.00 Km )<br />

13 C/O Culverts 0.00-5.00 Km. (Sh: 0.00-3.00 Km). Tirap 4.55 5.99 10.54 5.23 5.23 50%<br />

14 Formation Cutting, 0 to 2.00 Km Tirap 4.05 7.98 12.03 8.00 8.00 67%<br />

15 LAZU-KUTHUNG ROAD (21.00 KM) (SBC, 0.00 to 4.00 km (SH: SBC-0 to Tirap 3.55 5.98 9.53 5.50 5.50 58%<br />

3.00 km))<br />

KHONSA TOWNSHIP ROAD<br />

16 CC Drain from Petrol Pump to S.P. Office. Tirap 1.98 0.00 1.98 2.37 2.37 120%


17 Road from IB to SSB Camp-2.00 Km (SH: Boulder crated Wall at Ch. 0.80 Km Tirap 1.20 1.90 3.10 4.03 4.03 130%<br />

& 1.10 Km)<br />

18 Road from Khonsa-Longding road to SB Office (SH: C/o Slab Culvert 2 mtr Tirap 1.49 0.00 1.49 0.48 0.48 32%<br />

span-1 No)<br />

19 APPROACH ROAD TO KHONSA VILLAGE ROAD 1.50 KM (SBC/BC- Tirap 1.27 1.97 3.24 3.20 3.20 99%<br />

1.50 km)<br />

APPROACH ROAD TO DADAM-TISSA ROAD C.O. HEAD QUARTER Tirap<br />

(4.00 KM)<br />

20 F/Cutting, 0-2.00 km, Jungle Clearance & Kutcha Drain. Tirap 6.20 11.79 17.99 19.16 19.16 107%<br />

21 C/o RCC Slab Culvert-3 Nos Tirap 3.55 5.00 8.55 11.21 11.21 131%<br />

Name <strong>of</strong> Circle:- Jairampur Circle<br />

Tirap<br />

Name <strong>of</strong> Division:- Longding Division<br />

Tirap<br />

LONGSOM-CHANU-OZAKHO-CHAITONG-CHOPSA-NOKFAN<br />

Tirap<br />

ROAD (55 KM)<br />

22 C/o S/culvert & HP Culvert 2.00 - 6.00 km. Tirap 4.00 5.98 9.98 9.95 0.00 9.95 100%<br />

23 SBC, 0.00 to 3.00 km Tirap 4.40 6.83 11.23 11.20 0.00 11.20 100%<br />

24 Cattle Track (span 2.50 Mtr) at Ch. 0.30 Km Tirap 2.75 0.02 2.77 2.75 0.00 2.75 99%<br />

25 BANFERA WANU ROAD (10.00 KM.) (Culverts 1.00 - 3.00 Km) Tirap 5.21 12.94 18.15 0.00 5.00 12.70 17.70 98%<br />

26 ROAD FROM MOPAGHAT TO RINGPONG VIA LONGHUA (15 KM) Tirap 8.20 14.88 23.08 0.00 8.00 0.00 8.00 35%<br />

(Cul 5.00-9.70 km)<br />

27 RANGLUA-NOKFAN ROAD (20 KM) (SBC 1.00 - 3.50 KM & Culvert 1.10 Tirap 3.95 6.01 9.96 0.00 2.00 0.00 2.00 20%<br />

- 3.00km)<br />

28 ASSAM PWD ROAD TO KANUBARI (8.50 KM) (BC & BT 8.50 km) Tirap 8.05 13.99 22.04 0.00 5.00 17.04 22.04 100%<br />

29 OLINGTONG-LUKSIM ROAD (3 KM)(SBC & BC 0.00-3.00KM(SH:Ph-I Tirap 4.40 6.61 11.01 0.00 5.00 0.00 5.00 45%<br />

SBC &BC 0.00 - 2.50 KM))<br />

30 APPROACH ROAD TO VKV NIAUSA(2.50 KM) (SBC ,BC &BT 1.00 - Tirap 1.51 0.00 1.51 0.00 1.51 0.00 1.51 100%<br />

2.00 KM restricted - 1.00 - 1.50 km.)<br />

LONGDING - PUMAO - MAIHUA ROAD (29 KM)<br />

Tirap<br />

31 F/C 21.00 - 25.00 Km. (Pumao to Maihua) Tirap 5.40 10.59 15.99 0.00 0.00 0.00 0%<br />

32 BC 8.00 - 9.750 KM & Addl. Cul. - 8 Nos. in between 18.00 - 21.00 km Tirap 4.45 10.99 15.44 0.00 0.00 0.00 0%<br />

33 R/wall & B/wall 8.00 - 18.00 km Tirap 1.83 0.00 1.83 0.00 0.00 0.00 0%<br />

34 R/wall & B/wall 18.00 km Tirap 1.95 2.02 3.97 0.00 0.00 0.00 0%<br />

35 R/wall at Ch. 0.050 Km (50 mtr) Tirap 1.00 2.00 3.00 0.00 0.00 0.00 0%<br />

36 Culverts - 2 nos Tirap 2.29 0.00 2.29 1.00 1.29 2.29 100%<br />

37 LONGDING TOWNSHIP ROAD ( 8 .00 KM ) (Culvert-2 Nos) Tirap 1.99 0.00 1.99 2.00 0.00 2.00 101%<br />

PONGCHAU TOWNSHIP ROAD ( 3.00 KM )<br />

Tirap<br />

38 Formation cutting from boys hostel to BRTF road 0.60 km (SBC 1.98 - 2.58<br />

Km).<br />

Tirap 2.05 2.95 5.00 5.00 0.00 5.00 100%


39 Improvement <strong>of</strong> Pongchau Township Road (SH: Storm Water Drain) Tirap 3.25 5.00 8.25 3.00 0.00 3.00 36%<br />

40 MOPAGHAT - SANGSATHAM ROAD ( 5.30 KM ) (Cul. 12 Nos at verious Tirap 2.40 3.61 6.01 2.00 4.00 6.00 100%<br />

reaches wherever necessary )<br />

Sub - Total 139.68 197.68 337.36 0.00 166.37 74.95 241.32 72%<br />

Bridges<br />

Name <strong>of</strong> Circle : Jairampur Circle<br />

Name <strong>of</strong> Division : Khonsa Division<br />

LONGKAI-MOKTOWA ROAD (9.10 KM)<br />

77 C/o Steel/Bailey Bridge over River Chitung <strong>of</strong> 30 mtr span Tirap 5.00 0.00 5.00 0.00 1.25 5.00 6.25 125%<br />

Name <strong>of</strong> Circle:- Jairampur Circle<br />

Name <strong>of</strong> Division:- Longding Division<br />

RANGLUA-NOKFAN ROAD (20.00 KM)<br />

78 Steel bridge at Ch.6.00 Km over river Tiru (span 25 mtr) Tirap 10.00 5.00 15.00 10.00 10.00 67%<br />

MINTONG - KHASA - KONSA ROAD (45 KM)<br />

79 C/o Steel Bridge at Ch. 25.60 Km span 10.00 mtr Tirap 8.00 13.73 21.73 10.00 11.73 21.73 100%<br />

SUB TOTAL = 23.00 18.73 41.73 0.00 21.25 16.73 37.98 2.92<br />

Suspension Bridges<br />

CIRCLE : JAIRAMPUR<br />

DIVISION : LONGDING<br />

FOOT SUSPENSION BRIDGES UNDER LONGDING DIVISION<br />

125 C/o Suspension Bride for defence personal connecting two villages Ojakho and<br />

Chopnu (span 50 mtr)<br />

Tirap 6.00 6.00 12.00 0.00 12.00 0.00 12.00 100%<br />

RIDF & NEC<br />

KHONSA DIVISION<br />

19 MUKTOWA - BARAF ROAD (20.00 KM) IN TIRAP DISTRICT Tirap 76.80 100.00 176.80 0.00 0%<br />

LONGDING DIVISION<br />

20 KANUBARI - LONGDING ROAD (52.80KM) IN TIRAP DISTRICT Tirap 201.75 200.00 401.75 60.00 305.00 365.00 91%<br />

SUB TOTAL = 278.55 300.00 578.55 60.00 0.00 305.00 365.00 63%


Total (PWD : Tirap District) 447.23 522.41 969.64 60.00 199.62 396.68 656.30 68%<br />

TOTAL GRAND TOTAL 9565.97 12226.59 21792.56 4908.80 7036.54 3275.65 15220.99 70%