08.01.2015 Views

Catalogue - EVAPCO Europe NV

Catalogue - EVAPCO Europe NV

Catalogue - EVAPCO Europe NV

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STRUCTURAL STEEL SUPPORT<br />

SUGGESTED TWO “I” BEAM ARRANGEMENT<br />

Dimensions are in mm.<br />

(W)<br />

20,6<br />

Centerline of<br />

Mounting Holes<br />

20,6<br />

Unit Outline<br />

ENGINEERING<br />

End Elevation View<br />

Plan View<br />

(L)<br />

41,3<br />

20,6<br />

41,3<br />

20,6<br />

19<br />

Mounting<br />

Hole<br />

Section A – A<br />

19<br />

Mounting<br />

Hole<br />

A<br />

W<br />

A<br />

Model<br />

Unit Unit Centerline of Number of<br />

Width (W) Length (L) mounting holes mounting holes<br />

ESWA-72 2388 2731 2347 6<br />

ESWA-96 2388 3372 2347 6<br />

ESWA-142 2388 5486 2347 12<br />

ESWA-144 3607 3651 3566 6<br />

ESWA-216 3607 5486 3566 12<br />

Notes:<br />

1. These are suggested arrangements for preliminary layout purposes. Consult your <strong>EVAPCO</strong> representative or the <strong>EVAPCO</strong> website<br />

(www.evapco.eu) for certified steel support drawings.<br />

2. The recommended support is structural “I” beams under the entire lengths of the unit. The unit should be elevated for access<br />

underneath the unit and the supporting base. Mounting holes are 19mm diameter.<br />

3. Beams should be sized in accordance with accepted structural practices. Maximum deflection of beam under unit to be 1/360 of the<br />

unit length, not to exceed 13 mm.<br />

4. Deflection may be calculated by using 55% of the operating weight as a uniform load on each beam. Refer to unit certified print for<br />

the operating weight.<br />

5. Beams should be level before setting the unit in place. Do not level the unit by shimming between the unit and the support beam.<br />

6. Support beams and anchor bolts are to be supplied and installed by others.<br />

7. Dimensions, weights and data are subject to change without notice. Refer to the factory certified drawings for exact dimensions.<br />

8. If point isolation is to be used, the isolators must be installed under the supports beams, not between the unit and support beam.<br />

9. Consult your Evapco representative for alternate support beam layouts.<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!