09.01.2015 Views

View RFQ - Loudoun Water

View RFQ - Loudoun Water

View RFQ - Loudoun Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Loudoun</strong> <strong>Water</strong><br />

Request for Qualifications<br />

<strong>RFQ</strong># 2013-057-220A<br />

<strong>Loudoun</strong> <strong>Water</strong><br />

Request for Qualifications<br />

for the<br />

Raw <strong>Water</strong> Intake and Potomac Raw <strong>Water</strong> Pumping Station – Phase I<br />

I. NOTICE OF REQUEST FOR QUALIFICATIONS<br />

1. General<br />

<strong>Loudoun</strong> <strong>Water</strong> (“LW”) extends this Request for Qualifications (“<strong>RFQ</strong>”) to request<br />

Statement of Qualifications (“SOQ”) from interested Contractors (the<br />

“Proposers”) for the Raw <strong>Water</strong> Intake and Potomac Raw <strong>Water</strong> Pumping<br />

Station – Phase I (the “Project”). This Project is a part of <strong>Loudoun</strong> <strong>Water</strong>’s<br />

Potomac <strong>Water</strong> Supply Program (the “Program”), a multimillion dollar program<br />

aimed at withdrawing, storing, treating and distributing the Potomac River water<br />

to <strong>Loudoun</strong> <strong>Water</strong> customers.<br />

The procurement of the Project is a two step process. This is step one of the<br />

procurement process of the Project. The purpose of this <strong>RFQ</strong> is to request<br />

documentation that will enable <strong>Loudoun</strong> <strong>Water</strong> to determine which Proposers:<br />

(a) are qualified to successfully execute the construction of the Project; and (b)<br />

will be invited to submit bids in response to <strong>Loudoun</strong> <strong>Water</strong>’s Invitation for Bid<br />

(“IFB”) for the Project as Prequalified Bidders. Award of a Contract for the<br />

Project (the “Contract”) will be made in step two and award will be made to one<br />

of the Prequalified Bidders as determined by <strong>Loudoun</strong> <strong>Water</strong> under the criteria<br />

established in the IFB.<br />

2. Project Overview<br />

The Project includes:<br />

Construction and commissioning of a 40 million gallon per day (MGD) net<br />

capacity submerged raw water intake (RWI) and raw water pumping station<br />

(PRWPS) with all supporting facilities including a raw water transmission (RWT)<br />

system within the property boundaries.<br />

A detailed description of the scope of services is included in Section II of this<br />

document.<br />

1 of 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!