Table 15-3<br />

Phase 3 Monitoring<br />

Post Construction Monitoring<br />

Monitoring Type Anacostia River Potomac River Rock Creek Frequency<br />

Rain Fall Monitoring 1 gage in Northeast<br />

Boundary<br />

1 gage in Tiber Creek<br />

1 gage in Slash<br />

Run<br />

1 gage in College<br />

Pond<br />

1 gage in Piney<br />

Branch<br />

Continuous<br />

CSO Overflow<br />

Monitoring and<br />

Diversion to Storage<br />

Monitoring<br />

Tunnel Storage Level<br />

Monitoring<br />

CSO Overflow<br />

Sampling<br />

Receiving water<br />

Monitoring- Dissolved<br />

Oxygen<br />

Receiving <strong>Water</strong><br />

Monitoring- Bacteria,<br />

Field Parameters<br />

Northeast Boundary<br />

CSO 019<br />

Fort Stanton CSO 007<br />

B ST/ NJ Ave Pumped<br />

Overflow CSO 010<br />

Potomac Pumping<br />

Station CSO 021<br />

College Pond CSO<br />

029<br />

Piney Branch<br />

CSO 049<br />

Continuous<br />

1 sensor in Tunnel 1 sensor in Tunnel 1 sensor in<br />

Tunnel<br />

Continuous<br />

1 sampling station at 1 sampling station<br />

-- 4 storms per year<br />

Northeast Boundary at CSO 021<br />

Approx 1 hour<br />

sample interval<br />

<br />

<br />

D.O. monitors<br />

operated by DOH<br />

Use data from other<br />

existing programs<br />

D.O. monitors<br />

operated by DOH<br />

Use data from<br />

other existing<br />

programs<br />

for each storm<br />

-- Approx 30<br />

minute intervals<br />

-- Frequency of<br />

existing<br />

programs<br />

Phase 3 monitoring will be conducted for 12 months.<br />

15.7 NPDES PERMIT CONDITIONS<br />

Because the operation of the District’s combined sewer system is addressed in NPDES Permit No.<br />

<strong>DC</strong>0021199, permit conditions will need to be developed to monitor and measure compliance based<br />

on operation of the LTCP. A potential framework for defining an acceptable level of performance<br />

and permit compliance would contain the requirements such that the CSO control system would be in<br />

compliance when:<br />

<br />

<br />

<br />

Transfer facilities from CSO outfalls to storage are conveying flow up to prescribed rates.<br />

An outfall is not discharging when its associated storage facility is not filled to capacity and<br />

the transfer facility is conveying flow up to prescribed rates.<br />

The BPWWTP is operating at prescribed treatment rates and capacities.<br />

An outline of permit conditions is as follows:<br />

<br />

Discharges from permitted individual combined sewer system outfalls are prohibited except<br />

during wet weather events when:<br />

o The associated combined sewer overflow storage facilities are filled to capacity:<br />

\\Gh-wash\ENG 1160\LTCP\LTCP Final\Sec 15.doc 15-7 FINAL - July 2002