09.01.2015 Views

Combined Sewer System Long Term Control Plan - DC Water

Combined Sewer System Long Term Control Plan - DC Water

Combined Sewer System Long Term Control Plan - DC Water

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix E – Basis for Cost Opinions<br />

Source of Data<br />

Finished<br />

Diameter (ft)<br />

Unit Cost<br />

($/LF, ENR=6383)<br />

15 $ 2,210<br />

20 $ 2,455<br />

25 $ 3,069<br />

30 $ 3,683<br />

Dr. G. Sauer Corp. Hand Mine, New<br />

Austrian Tunneling Method, 5-10,000' long<br />

tunnel 10 $ 2,937<br />

15 $ 3,304<br />

20 $ 3,671<br />

25 $ 4,589<br />

30 $ 5,507<br />

Dr. G. Sauer Corp. Hand Mine, New<br />

Austrian Tunneling Method, >10,000' long<br />

tunnel 10 $ 2,863<br />

15 $ 3,221<br />

20 $ 3,579<br />

25 $ 4,474<br />

30 $ 5,369<br />

Dr. G. Sauer Corp., Weathered Rock, Hand<br />

Mine, New Austrian Tunneling Method ,<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!