Track Record 1, August to December 1999 - Public Transport Victoria
Track Record 1, August to December 1999 - Public Transport Victoria
Track Record 1, August to December 1999 - Public Transport Victoria
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Track</strong> <strong>Record</strong><br />
Vic<strong>to</strong>ria’s Train and Tram Services<br />
Table 5. Concession fare <strong>to</strong>p-up and free travel ($’000)<br />
29 Aug.–Sept. <strong>1999</strong> Oct.–Dec. <strong>1999</strong> Total per company<br />
Bayside Trains 1,137 2,471 3,608<br />
Hillside Trains 886 1,877 2,763<br />
V/Line Passenger 954 2,567 3,521<br />
Swans<strong>to</strong>n Trams 535 1,144 1,679<br />
Yarra Trams 391 849 1,240<br />
Total 3,903 8,908 12,811<br />
3.3 Total payments<br />
Table 6. Total payments ($’000)<br />
29 Aug.–Sept. <strong>1999</strong> Oct.–Dec. <strong>1999</strong> Total<br />
Bayside Trains 7,858 21,162 29,020<br />
Hillside Trains 9,524 25,887 35,411<br />
V/Line Passenger 8,084 22,560 30,644<br />
Swans<strong>to</strong>n Trams 4,956 13,324 18,280<br />
Yarra Trams 3,457 9,353 12,810<br />
Grand Total 33,879 92,286 126,165<br />
The key points <strong>to</strong> make about these figures are:<br />
Metropolitan trains<br />
––– The metropolitan train opera<strong>to</strong>rs earned bonuses for a substantial improvement in on-time running and reduced<br />
cancellations compared <strong>to</strong> the Government’s targets. For the four months since franchising, net incentive<br />
payments <strong>to</strong> the metropolitan train opera<strong>to</strong>rs have <strong>to</strong>talled $1.9 million.<br />
V/Line Passenger and trams<br />
––– V/Line Passenger and the tram opera<strong>to</strong>rs each paid penalties <strong>to</strong> the Government since the Operational<br />
Performance Regime came in<strong>to</strong> effect at the end of <strong>August</strong> <strong>1999</strong>. While service delivery by these opera<strong>to</strong>rs has<br />
generally been better than the average performance during 1998, it has not yet consistently exceeded the<br />
targets established by government.<br />
8