11.01.2015 Views

Micropiles – An Overview Micropiles – An Overview - AGC

Micropiles – An Overview Micropiles – An Overview - AGC

Micropiles – An Overview Micropiles – An Overview - AGC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Grouting (Including Post-Grouting)<br />

Methods Vary But Can Have Major Impact on Micropile Capacity<br />

• “Most” Important Considerations<br />

‣ Water/cement (w/c) ratio 0.40 to 0.50;<br />

Pre-construction testing, specifications (grout QC plan),<br />

construction monitoring<br />

‣ After completion of grouting, no significant loss of grout in<br />

load bearing zone;<br />

Monitor grout take, grout to refusal, pre-grout, re-grout<br />

‣ For Type B micropiles, consider possibility that target<br />

pressure may not be fully obtained during installation<br />

Include verification load test program and proof testing of<br />

suspect piles in specifications

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!