Post Games Report - Commonwealth Games Federation
Post Games Report - Commonwealth Games Federation
Post Games Report - Commonwealth Games Federation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
D1.3.2 Total Vehicles used by Day<br />
250<br />
200<br />
Number of Vehicles<br />
150<br />
100<br />
Buses (First)<br />
Coaches (Dunn-Line)<br />
Mini Buses<br />
Total<br />
50<br />
0<br />
15-Jul<br />
16-Jul<br />
17-Jul<br />
18-Jul<br />
19-Jul<br />
20-Jul<br />
21-Jul<br />
22-Jul<br />
23-Jul<br />
24-Jul<br />
25-Jul<br />
26-Jul<br />
27-Jul<br />
28-Jul<br />
29-Jul<br />
30-Jul<br />
31-Jul<br />
1-Aug<br />
2-Aug<br />
3-Aug<br />
4-Aug<br />
5-Aug<br />
6-Aug<br />
7-Aug<br />
D1.3.3 Ceremonies Transport: Arrival Operations<br />
Client Client No. Total Movements Total Vehicles No. of First No. of DunnLine Window of Operation* Duration<br />
OPENING CEREMONY<br />
Athletes 4,52 111 111 74 37 19:00 – 21:15 2hrs 15mins<br />
Tech Officials 950 19 19 19 17:30 – 19:00 1hr 30mins<br />
VIPs 1,980 44 44 44 17:00 – 19:00 2hrs<br />
TOTAL 7,782 174 174 93 81<br />
Media<br />
Increased Media services included a 5-minute frequency between G-Mex, Press Hotels and Sportcity<br />
between 17:00 and 19:00 and 15 minutes there after.<br />
CLOSING CEREMONY<br />
Athletes 4,870 101 77 67 10 18:30 – 20:15 1hr 45mins<br />
Tech Officials 800 18 18 2 16 17:30 – 18:50 1hr 20mins<br />
VIPs 1,800 40 40 40 17:00 – 18:50 1hr 50mins<br />
TOTAL 6,800 159 135 69 66<br />
Media<br />
Increased Media services included a 5-minute frequency between G-Mex, Press Hotels and<br />
Sportcity between 17:00 and 19:00 and 15 minutes there after.<br />
* Window of operation is defined from the start of loading of the first bus to the arrival of the last client to their required destination.<br />
D1.4 Spectator Transport<br />
D1.4.1 Typical Mode Split at Sportcity Evening ‘Bump Out’<br />
Park and Ride 27%<br />
City Centre Shuttles 21%<br />
Regular Public Transport 13%<br />
Citylink then Public Transport 13%<br />
Park & Walk 8%<br />
Fly & On-street Parking 5%<br />
Coaches 5%<br />
Walk/Cycle 4%<br />
Kiss & Ride 3%<br />
Taxis 1%<br />
MANCHESTER 2002 THE XVII COMMONWEALTH GAMES • POST GAMES REPORT 39<br />
VOLUME 5