Consolidated Fire Lake North Project - GOLDINVEST.de
Consolidated Fire Lake North Project - GOLDINVEST.de
Consolidated Fire Lake North Project - GOLDINVEST.de
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Oil Can <strong>Project</strong><br />
Initial Mineral Resource Estimate<br />
• Potential for low strip ratio < 1 : 1<br />
• Potential Bench width 150- 350m<br />
• 972 Mt of iron oxi<strong>de</strong> grading 33.2% at a<br />
15% iron cut-off<br />
• 924 Mt of mixed iron oxi<strong>de</strong><br />
mineralization with a silicate component<br />
• This <strong>de</strong>posit is open at <strong>de</strong>pth<br />
• Orientation metallurgical tests indicate a<br />
relatively coarse liberation grind size<br />
• Commercial gra<strong>de</strong> magnetite sinter feed<br />
concentrate can be produced<br />
• The 2011 drill program returned long<br />
magnetite-hematite iron formation<br />
intersections up to 545 metres in length<br />
• The 400 metre spaced drill program is<br />
completed<br />
To view a larger more <strong>de</strong>tailed version of this map please visit:<br />
http://www.championironmines.com/vns-site/page-oil_can.html<br />
22