15.01.2015 Views

Consolidated Fire Lake North Project - GOLDINVEST.de

Consolidated Fire Lake North Project - GOLDINVEST.de

Consolidated Fire Lake North Project - GOLDINVEST.de

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

About Champion Iron Mines<br />

Advanced iron ore exploration and <strong>de</strong>velopment projects located in<br />

Canada’s principal iron ore district, the Labrador Trough<br />

Fermont <strong>Project</strong>s (747 km 2 )<br />

• 14 projects in the Fermont Iron Ore District<br />

• Flagship <strong>Consolidated</strong> <strong>Fire</strong> <strong>Lake</strong> <strong>North</strong> <strong>Project</strong><br />

with the feasibility study due in early Q4 2012<br />

• 4.7 billion tonnes of NI 43-101 compliant estimates of<br />

iron mineral resources on 3 projects (564 MT of Measured<br />

+ Indicated and 4,136 MT of Inferred Mineral Resources)<br />

• 100% direct interest, 3% NSR (C$1.5 million buyback<br />

for an additional 0.5% NSR)<br />

Attikamagen <strong>Project</strong> (310 km 2 )<br />

• Champion Iron Mines holds a 44% interest<br />

• Century Iron Mines Corp. subsidiary has a 56% interest<br />

and can earn up to a 60% interest by spending further $3<br />

million on exploration expenditures by May 2014 1<br />

• Sept. 25 th 2012: 1.7 billion tonnes @ 31.3% FeT and a<br />

plan for a DSO project of 1 Mtpy 2<br />

1. Investment by WISCO of 25% ($60M) and Minmetals of 5% ($12M)<br />

2. As reported by Champion Iron’s JV Partner on Sept 25th, 2012<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!