Consolidated Fire Lake North Project - GOLDINVEST.de
Consolidated Fire Lake North Project - GOLDINVEST.de
Consolidated Fire Lake North Project - GOLDINVEST.de
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Oil Can <strong>Project</strong><br />
Exploration Upsi<strong>de</strong><br />
Central Zone<br />
(Facing <strong>North</strong>west)<br />
191.7m @<br />
28.2%<br />
OC11-14 OC11-16<br />
OC11-03<br />
OC11-10<br />
Ovb<br />
311.4m @ 27.6%<br />
incl. 269.0m @<br />
29.2%<br />
224.0m @ 28.1%<br />
incl. 140.0m @<br />
30.0%<br />
IF<br />
472.2m @ 28.0%<br />
incl. 119.6m @<br />
35.2%<br />
200 metres<br />
24