8.18 Organ<br />

The Vincent Organ Company, Sunderland. Regularly serviced.<br />

8.19 Churchyard and Environs<br />

The rear garden has been historically damp as it remains today. Drainage has been checked in the<br />

past and it appears to be simply a case <strong>of</strong> high water table. It is overshadowed by the church and the<br />

planting struggles to thrive in its shadow. Paving is uneven due to ground movement and should be<br />

relaid level. The grass is patchy at the west <strong>of</strong> the new parish room.<br />

8.20 Halls<br />

Stella Maris Room<br />

Item New Parish room<br />

Priority-D<br />

Description Lantern<br />

Condition Built 2011. Slight buckle to fascia.<br />

Repair needs Fix back fascia<br />

8.21 Ruins maintained by the PCC<br />

None<br />

8.22 Monuments, Tombs and Vaults<br />

None<br />

8.23 Boundary walls, railings and fencing, gates and lichgates and signage<br />

External signboard on lobby requires redecoration and brought back into use.<br />

8.24 Paths and Access Issues, Hardstanding Areas and Parking<br />

The tarmac turning area could be increased in width as there is a desire line in the grass.<br />

There are a couple <strong>of</strong> loose flagstones on the south, parallel to the nave.<br />

The footpath against the highway has been patch repaired (<strong>Durham</strong> County Council). The footpath<br />

crossing is showing signs <strong>of</strong> deformation.<br />

8.25 Trees.<br />

The tree to the west <strong>of</strong> the parish room not causing problems but as it is close to the building should<br />

be kept in check.<br />

Services, installations and other matters:<br />

8.26 Heating<br />

The twin gas boilers were installed in 1999 and were inspected and modified to accommodate the<br />

new parish room in 2010.<br />

8.27 Electrical<br />

The system was tested as part <strong>of</strong> the parish room works in 2010 including new distribution board.<br />