<strong>Quinquennial</strong> <strong>Inspection</strong> <strong>Report</strong><br />

Church <strong>of</strong> St James The Apostle, Owton Manor, Hartlepool.<br />

Archdeaconry <strong>of</strong> <strong>Durham</strong><br />

<strong>Diocese</strong> <strong>of</strong> <strong>Durham</strong><br />

1


<strong>Report</strong> prepared by:<br />

David Beaumont RIBA AABC<br />

Beaumont Brown Architects LLP, The Old Brewery, castle Eden, Co <strong>Durham</strong>. TS27 4SU<br />

dsb@beaumontbrownarchitects.co.uk<br />

01642 700803<br />

Date <strong>of</strong> inspection and weather conditions - 14 November 2011. Cloudy, cold.<br />

Date <strong>of</strong> report- February 2012<br />

Date <strong>of</strong> previous report – December 2006<br />

1. Executive summary<br />

The exposed concrete frames surrounding windows in the south nave are showing some signs <strong>of</strong><br />

movement albeit this is historical. As is the movement to the walling at the junction <strong>of</strong> the South and<br />

West elevations. The external concrete columns on the apse and South elevation <strong>of</strong> the chancel are<br />

spalling, as are previous repairs. The overhanging concrete s<strong>of</strong>fits <strong>of</strong> the nave, chancel and apse<br />

ro<strong>of</strong>s are also spalling. The nave glazing is troublesome in repair and is consequently draughty and<br />

insecure.<br />

The principal issue facing the church apart from routine items are:<br />

Repair <strong>of</strong> external concrete elements.<br />

Longer term solution to the nave glazing, particularly the South elevation.<br />

2. Previous Repairs<br />

The following repairs have been undertaken since the last report:<br />

Introduction <strong>of</strong> new altar.<br />

Creation <strong>of</strong> adjoining parish room (Stella Maris Room).<br />

Redecoration <strong>of</strong> church.<br />

Flashband flashing on porch to replace stolen lead.<br />

Cleaning <strong>of</strong> kitchen/disabled lavatory drainage.<br />

Removal <strong>of</strong> overgrown conifer hedge to West <strong>of</strong> garden <strong>of</strong> remembrance.<br />

Replacement kitchen units and window.<br />

Tree maintenance at East boundary <strong>of</strong> garden <strong>of</strong> remembrance.<br />

Creation <strong>of</strong> paved patio to French doors in the Stella Maris room.<br />

Repairs to hot water system.<br />

3. Description<br />

The church was completed in 1957 to the design <strong>of</strong> Cordingley and McIntyre Architects and consists<br />

<strong>of</strong>:<br />

Three bay nave; chancel with apse; vestry; toilets and kitchen (referred to as ancillary buildings in<br />

the report). There is a vestibule to the West End.<br />

The main body <strong>of</strong> the church is <strong>of</strong> concrete portal frame supporting a shallow pitched concrete ro<strong>of</strong><br />

clad in copper. Infill walls are facing brickwork. The North and South elevations are punctuated with<br />

tall concrete framed windows with exposed aggregate panels below.<br />

The ancillary areas are <strong>of</strong> load-bearing brickwork supporting flat concrete ro<strong>of</strong>s faced in mineral felt.<br />

The heating is by a gas-fired boiler situated in the remodelled parish rooms.<br />

2


The church has an open grassed frontage to the road and small enclosed memorial garden to the<br />

rear. The vicarage is adjacent to the north-west and outside the scope <strong>of</strong> the report.<br />

2010 saw the completion <strong>of</strong> the Stella Maris parish room by Burns Architects <strong>of</strong> Castle Eden which<br />

connects to the north Nave elevation and ancillary accommodation. It is constructed <strong>of</strong> cavity brick<br />

walls, concrete floor and timber flat ro<strong>of</strong> with high performance elastomeric membrane.<br />

St James's is one <strong>of</strong> other churches in the diocese by Cordingley and McIntyre:<br />

1938 Lobley Hill, All Saints<br />

1939 East Darlington, St Herbert<br />

1929 Bishopwearmouth, St Nicholas<br />

1954 Newton Aycliffe, St Clare<br />

1956 Stockton on Tees, St Chad<br />

1956 Peterlee, St Cuthbert<br />

1959 North Wearside, St Cuthbert, Red House<br />

1962 Leam Lane, St Andrew<br />

4. Plan <strong>of</strong> the church<br />

See rear <strong>of</strong> the report<br />

5. Listing grade<br />

St James is not listed<br />

6. Maintenance<br />

Maintenance <strong>of</strong> the building is the responsibility <strong>of</strong> the PCC. Guidance is given in the report.<br />

There is no churchyard.<br />

7. Limitations <strong>of</strong> the report<br />

The inspection has been made from the ground and readily accessible locations only. The inspection<br />

was visual and opening up the enclosed spaces has been excluded.<br />

List <strong>of</strong> items not inspected:Ro<strong>of</strong> surfaces and coverings. Attic space above the vestry.Basement<br />

boiler room (now redundant).<br />

The report is restricted to the general condition <strong>of</strong> the building and its defects<br />

8.<strong>Report</strong><br />

The following report is set out in the order that the church was examined; starting from the south,<br />

entrance elevation.<br />

Circuits are made for each element eg ro<strong>of</strong>, rainwater goods, wall, and the following defects are<br />

noted in the order the circuit was made.<br />

EXTERIOR<br />

8.1. Ro<strong>of</strong> Coverings<br />

South and North<br />

The copper sheeting is showing signs <strong>of</strong> rippling, as would be expected <strong>of</strong> its age. No action required.<br />

Some light green markings at ridge, possible birds. Not able to inspect Apse ro<strong>of</strong>.<br />

3


North Eaves<br />

Partially obscured by new parish room, but spalling at eaves overhang above window N10 and CN2.<br />

The new parish room eaves requires its decoration completing and removal <strong>of</strong> paint splashes on<br />

brickwork.<br />

South Eaves<br />

Chancel Eaves<br />

Priority-C<br />

Painted reinforced concrete with protective overhang.<br />

Inadequate concrete thickness has caused the metal<br />

reinforcement to expand and spall the concrete<br />

Investigate construction makeup. Identify remedial solution.<br />

Apse Eaves<br />

Priority-C<br />

Description As Above<br />

Condition As above<br />

Repair needs As above<br />

East Eaves<br />

Item Ancillary Buildings’ Eaves<br />

Priority-C<br />

Description S<strong>of</strong>fits failing in three areas, evidence <strong>of</strong> previous<br />

inappropriate repair.<br />

Condition Spalling<br />

Repair needs Investigate construction makeup. Identify<br />

remedial solution.<br />

North<br />

Item Ancillary Buildings’ Eaves<br />

Priority-C<br />

Description Invasive plants<br />

Condition In need <strong>of</strong> attention<br />

Repair needs Remove and maintain clear ro<strong>of</strong>s<br />

4


Western Porch<br />

Item Porch Ro<strong>of</strong><br />

Priority-A<br />

Description three-layer felt<br />

Condition Failure <strong>of</strong> felt at perimeter and in the middle,<br />

timber kerb rotten<br />

Repair needs Replace kerb and ro<strong>of</strong> covering<br />

Item Porch Ro<strong>of</strong><br />

Priority-A<br />

Description Flashing<br />

Condition Theft <strong>of</strong> flashing has resulted in temporary<br />

flashband replacement which is partially missing<br />

Repair needs Replace flashing<br />

8.2 Rainwater Gutters, Downpipes, Gullies and Below Ground Drainage<br />

West porch downpipe requires decoration. Ancillary building downpipes require decoration and<br />

gulley covers. Gulley at junction <strong>of</strong> new parish room and old single storey needs grid. Gulley at right<br />

hand side <strong>of</strong> parish room doorway requires a surround to retain the gully.<br />

South<br />

Item RWPs<br />

Priority-B<br />

Description Plastic<br />

Condition South apse and sanctuary downpipes rocking on<br />

their fittings. Leaf build up.<br />

Repair needs Fix back rwps. Gulleys require sweeping out <strong>of</strong><br />

leaves and permanent mesh covering where missing<br />

Item Ancillary building RWPs<br />

Priority-B<br />

Description Socketed Cast Iron<br />

Condition Rusting<br />

Repair needs Fix gully covers and repaint<br />

5


East<br />

Apsidal end gutter showing possible corrosion to their s<strong>of</strong>fits, perhaps because <strong>of</strong> radial shape<br />

welds.<br />

8.3 Parapets, Upstand Walls, Finials, Crosses<br />

None<br />

8.4 Walling and Pointing<br />

East<br />

Apse brickwork with structural concrete portal frame columns, recess pointing is in good condition,<br />

some chipped cross-bricks. Generally good order.<br />

Item Apse concrete portal columns. Two <strong>of</strong> which adjoin the<br />

East wall. Five are exposed.<br />

Priority-C<br />

Description All have had repairs in the past in ill-matching<br />

mortar.<br />

Condition. It’s mostly the repairs that are breaking away.<br />

Repair needs The reinforcement has about 10mm cover and<br />

will continue to be a major problem unless remedied.<br />

South<br />

Recessed pointed brickwork with large window panels and pre-cast concrete frames, with exposed<br />

green aggregate. Pointing below is okay.<br />

The low-level bushes and grass should be removed from the base <strong>of</strong> the south wall as this creates a<br />

damp microclimate. Lighter colour to the brickwork at lower level – reason<br />

Item South Nave Wall<br />

Priority-D<br />

Description Brickwork<br />

Condition 2mmVertical Crack in joints. But not seeming to be<br />

moving. Appears historical. At the west corner there is a glass<br />

tell-tale still intact, as noted on previous quinquennial.<br />

Repair needs Repoint and monitor<br />

North Church<br />

General good condition, minor loss <strong>of</strong> lower pointing to the brickwork below Window N10 frame and<br />

pointing washed to the sides at lower level.<br />

North ancillary building<br />

Has seen cement repairs in the past, lower level is washed out and damp. Some pointing required at<br />

junction <strong>of</strong> ro<strong>of</strong>.<br />

6


8.5 Windows, Doors and Surrounds<br />

South Nave<br />

Window Frame<br />

Priority-C<br />

Precast concrete ribs- smooth finish in pale aggregate,<br />

chamfer detail, cement type pointing<br />

Some movement <strong>of</strong> ribs (no change since last inspection).<br />

Some pointing loose and some lost.<br />

Monitor. Repoint junction in material to match existing.<br />

S4, slight thermal movement has caused 1mm cracking to the frame abutment to brickwork, needs<br />

minor re-pointing at lower level. The concrete frames are reasonably intact. The glazing is a mixture<br />

<strong>of</strong> obscure glass types with siliconed repairs to the lead cames, which have been buckled and<br />

overturned as the glass had been replaced.<br />

S3, same loss <strong>of</strong> lower level pointing, both at the frame abutment to the brickwork and the pre-cast<br />

ribs.<br />

Item WindowS2, the worst <strong>of</strong> the three,<br />

Priority-C<br />

Description Precast concrete ribs- smooth finish in pale<br />

aggregate, chamfer detail, cement type pointing<br />

Condition Reasonable amount <strong>of</strong> frame pointing missing, at<br />

higher level to the East.<br />

Spalling at the ventilator fixings, not broken away yet; daylight<br />

visible under the bottom ventilator. Polycarbonate<br />

replacement glazing at lower level and very easily punched in.<br />

Repair needs Removal <strong>of</strong> rusting fixings, repair <strong>of</strong> frame.<br />

Reconsider remedial glazing in polycarbonate. Improve<br />

security.<br />

South Chancel<br />

Item Window S1<br />

Priority-C<br />

Description Metal ventilator<br />

Condition loss <strong>of</strong> pointing to ventilator and perimeter glazing.<br />

Some loss <strong>of</strong> pointing to brick ribs below.<br />

Repair needs Renew putty and redecorate<br />

North<br />

Window N10 general good condition, minor loss <strong>of</strong> lower pointing to the frame,<br />

Windows CN1 and CN2 overhauled during the development <strong>of</strong> the new parish room below.<br />

7


Item Window N3<br />

Priority-C<br />

Description Crittal type galvanised steel, single glazed obscure<br />

glass<br />

Condition Loss <strong>of</strong> decoration and pointing<br />

Repair needs redecoration and putty re-pointing<br />

INTERIOR<br />

Nave<br />

Fibreboard ceiling under draws concrete panel ro<strong>of</strong>. Plaster walls repainted in 2011. Herringbone<br />

block flooring in good order<br />

Radiators are all sound, but it would be wise to vacuum the tops, as they’ve gathered quite a lot <strong>of</strong><br />

dust. The prayer book rest at the front <strong>of</strong> the loose seating is rickety.<br />

Item Windows<br />

Priority-C<br />

Description Much repaired in various types <strong>of</strong> obscure glass<br />

and polycarbonate<br />

Condition Timber facings <strong>of</strong> windows are dirty. Pointing to<br />

ventilators pointing is missing in certain windows. The<br />

window panes are noticeably loose. The window glass is<br />

quite sooty.<br />

Repair needs. Timber facings require decoration. Repoint<br />

ventilators. Fix panes in firmly (not easily achieved due to<br />

design). Clean glass.<br />

The windows, in time, will become a greater issue for<br />

security.<br />

Chancel<br />

Step up in stone, some pointing missing. Herringbone flooring more highly varnished than the nave.<br />

Further step up to the central altar (altar repositioned from other church), carpet losing a little <strong>of</strong> its<br />

colour and has some staining. Walls are okay. Clear storey glazing seems okay. No change to the wall<br />

tears on the South, previously noted.<br />

8


Lobby<br />

Recess doormat coir matting badly worn.<br />

Inside there is a redundant post box, undecorated. Window N11 decoration required to the<br />

horizontal glazing bars. Door 2, the keep to the lock needs recessing to enable the door to close<br />

properly.<br />

8.6 Tower, Spire<br />

None<br />

8.7 Clocks, Bells and Frames<br />

None<br />

8.8 Ro<strong>of</strong> and ceiling voids and ventilation<br />

N/A<br />

8.9 Presence <strong>of</strong> Bats or other Protected Species<br />

Not Known<br />

8.10 Ro<strong>of</strong> Structures and Ceilings<br />

Portal ro<strong>of</strong> in nave and Chancel appears serviceable. The ancillary building is asphalt ro<strong>of</strong>ed onto<br />

concrete flat ro<strong>of</strong>. No insulation. Suffers condensation and occasional leaks. Will need replacement<br />

when funds allow.<br />

Defects to ceilings in the porch and corridor noted elsewhere. Minor leak recently reported in<br />

ancillary ro<strong>of</strong> encapsulated in new parish room rero<strong>of</strong>ing.<br />

9


8.11 Upper Floors, Balconies and Access Stairways<br />

None<br />

8.12 Partitions, Screens, Panelling, Doors<br />

Rear door needs resetting for bolting properly. Corridor door doorstop required.<br />

The porch entrance double doors require remedial joinery to fix the rotten and broken panel in the<br />

bottom left hand corner. Nave double door master door requires easing into the lock.<br />

8.13 Floors and Platforms<br />

Comments within the room reports<br />

8.14 Internal Wall and Ceiling Finishes<br />

Item Lobby<br />

Priority-C<br />

Description Fibreboard<br />

Condition Coming down due to ro<strong>of</strong> leaks<br />

Repair needs Repair ro<strong>of</strong> and renew ceiling finish<br />

8.15 Monuments and Tombs<br />

None<br />

8.16 Toilets, Kitchen, Vestries, Meeting Rooms<br />

Boiler Cupboard<br />

Could do with further shelving out to take loose items, and redecoration.<br />

Vestry Corridor<br />

Item Ceiling<br />

Priority-C<br />

Description Fibre board<br />

Condition Joints are coming apart. Walls require decoration.<br />

Repair needs Repair ceiling joints and redecorate<br />

Vestry<br />

Item Vestry<br />

Priority-D<br />

Description Water staining on ceiling and wall surfaces<br />

Condition Damp<br />

Repair needs Redecorate<br />

10


Item Safe Room<br />

Priority-D<br />

Condition Water staining from previous major condensation.<br />

Water penetration showing in the safe room alongside Vestry.<br />

Repair needs Redecorate. Door requires easing into frame.<br />

WC<br />

Requires general decoration and updating.<br />

Disabled WC<br />

Item Disabled WC<br />

Priority-C<br />

Description Used as flower vestry<br />

Condition Holes in door which is sticking. Damp showing at<br />

low level on brickwork, plaster coming away from the wall,<br />

skirting board appears rotten. Steel windows decoration poor.<br />

The plaster reveal’s rusting, some damp at high level boxingprobably<br />

condensation.<br />

Repair needs Filling holes and ease into frame. Provide<br />

heating or dehumidifier. Investigate damp. Redecorate.<br />

Kitchen<br />

Broken ceiling tile. The wall painting requires further finish. Some <strong>of</strong> the wall tiling is not well<br />

finished against the wall. The lintel area is poor, needs finishing with a more sanitary finish. Door<br />

catches the worktop and the keep needs fixing back firmly.<br />

8.17 Fittings, Fixtures, Furniture and Moveable Articles<br />

It is worth noting that the Font, Candle stands and Lectern are designed by Cordingley and McIntyre<br />

and are an integral feature <strong>of</strong> St James.<br />

11


8.18 Organ<br />

The Vincent Organ Company, Sunderland. Regularly serviced.<br />

8.19 Churchyard and Environs<br />

The rear garden has been historically damp as it remains today. Drainage has been checked in the<br />

past and it appears to be simply a case <strong>of</strong> high water table. It is overshadowed by the church and the<br />

planting struggles to thrive in its shadow. Paving is uneven due to ground movement and should be<br />

relaid level. The grass is patchy at the west <strong>of</strong> the new parish room.<br />

8.20 Halls<br />

Stella Maris Room<br />

Item New Parish room<br />

Priority-D<br />

Description Lantern<br />

Condition Built 2011. Slight buckle to fascia.<br />

Repair needs Fix back fascia<br />

8.21 Ruins maintained by the PCC<br />

None<br />

8.22 Monuments, Tombs and Vaults<br />

None<br />

8.23 Boundary walls, railings and fencing, gates and lichgates and signage<br />

External signboard on lobby requires redecoration and brought back into use.<br />

8.24 Paths and Access Issues, Hardstanding Areas and Parking<br />

The tarmac turning area could be increased in width as there is a desire line in the grass.<br />

There are a couple <strong>of</strong> loose flagstones on the south, parallel to the nave.<br />

The footpath against the highway has been patch repaired (<strong>Durham</strong> County Council). The footpath<br />

crossing is showing signs <strong>of</strong> deformation.<br />

8.25 Trees.<br />

The tree to the west <strong>of</strong> the parish room not causing problems but as it is close to the building should<br />

be kept in check.<br />

Services, installations and other matters:<br />

8.26 Heating<br />

The twin gas boilers were installed in 1999 and were inspected and modified to accommodate the<br />

new parish room in 2010.<br />

8.27 Electrical<br />

The system was tested as part <strong>of</strong> the parish room works in 2010 including new distribution board.<br />

12


8.28 Insulation and air leakage<br />

St James has little or none insulation in the church fabric and suffers from significant air leakage<br />

from the nave windows to the south.<br />

8.29 Water supply, harvesting and conservation<br />

There is no harvesting or conservation<br />

8.30 Sound system<br />

No defects reported.<br />

8.31 Fire protection<br />

The church has adequate extinguishers and is covered by a detection system.<br />

8.32 Lightning Protection<br />

None. There are no high features. It has a metal ro<strong>of</strong> and is within an urban setting.<br />

9.0 Summary <strong>of</strong> repairs<br />

The church remains sound and is cared for. Its internal presentation is much improved since the last<br />

inspection however the ancillary rooms now need attention after the development <strong>of</strong> the Parish<br />

Room.<br />

There are two problems which will give rise to significant expenditure in the future:<br />

Nave glazing- It is just serviceable but it draughty and leaky and a security concern.<br />

Concrete Repairs- The eaves and vertical ribs to the apse require repair along with repairs to nave<br />

window frames.<br />

Most <strong>of</strong> the other recommendations are <strong>of</strong> a routine maintenance.<br />

The following order <strong>of</strong> priority sets out the relative urgency <strong>of</strong> foreseeable repairs over the next 5<br />

years. It is not a definitive programme <strong>of</strong> work and subject to funding, items further down the list<br />

could be brought forward if desired.<br />

To assist the Parish, the <strong>Diocese</strong> and potential funders, the following approximation <strong>of</strong> costs<br />

provides a guide for budgeting purposes. The costs are based on typical costs for the works<br />

described currently at the date <strong>of</strong> the report. Savings may be made by undertaking the work in<br />

groups. No allowances have been made for pr<strong>of</strong>essional or other fees.<br />

13


PRIORITY Headings<br />

A-Urgent, B- within 1 Year, C- within 2 years, D- within 5 years, E- Improvement with no timescale,<br />

M- routine maintenance<br />

Security<br />

Disabled Access<br />

Category Comment Broad Budget<br />

Costs<br />

A- URGENT £<br />

Porch Ro<strong>of</strong> coverings repair 3,800<br />

Ancillary Ro<strong>of</strong> Repair minor leak 200<br />

B- Within 1 Year<br />

Rainwater Goods Fix back rwps, install gully covers, gully surround,<br />

300<br />

redecorate<br />

Shrubs Remove south base wall shrubs and ancillary ro<strong>of</strong> plants. -<br />

Radiators Clean radiator tops -<br />

Matting Renew lobby door mat 40<br />

Decoration Redecorate porch rear window internally 50<br />

Porch Ceiling Renew lobby ceiling 250<br />

Porch Joinery The porch entrance double doors require remedial joinery 250<br />

to fix the rotten and broken panel in the bottom left hand<br />

corner.<br />

Nave Doors Adjust lock on Nave double doors 75<br />

Ancillary ro<strong>of</strong> Renew ancillary building felt ro<strong>of</strong> covering 3,000<br />

Rear Door<br />

Rear door needs resetting for bolting properly. Corridor 250<br />

door doorstop required.<br />

Nave Prayer book The most easterly- at the front- needs firmly fixing 75<br />

rest<br />

C- Within 2 Years<br />

Eaves, Apse ribs,<br />

Nave window<br />

frames<br />

Nave Glazing<br />

Walling<br />

Windows<br />

Inadequate cover to reinforcement and spalling to window<br />

frame fixings will require specialist repair. Probably not<br />

able to match aggregate so probably all overpainted.<br />

It is just serviceable but it draughty and leaky and a<br />

security concern. It has had multiple glass/polycarbonate<br />

replacements which do not fix back well. New work will<br />

require guards. Difficult to estimate as design not known.<br />

Repoint north wall brickwork at N10, repoint ancillary at<br />

junction to nave<br />

Repoint and redecorate galvanised ancillary building<br />

windows<br />

15,000<br />

20,000<br />

Corridor Ceiling Fix back and decorate corridor ceiling 125<br />

Disabled WC General redecoration and updating 150<br />

Kitchen<br />

Replace broken tile, finish <strong>of</strong>f wall tiling, refinish the lintel 150<br />

area, adjust door to avoid striking worktop, fix back keep.<br />

Paving Relay rear paving and fix loose south slabs 250<br />

Parish Room Eaves Finish painting <strong>of</strong> Parish room eaves and clean <strong>of</strong>f splashes 150<br />

300<br />

500<br />

14


D- Within 5 Years<br />

Walling Repair SW crack 750<br />

Chancel Steps Repoint chancel steps 200<br />

Ancillary Rooms Redecorate ancillary rooms 250<br />

Parish Room Fix back lantern fascia 75<br />

E- Improvement<br />

with no time scale<br />

Could do with further shelving out to take loose items, and<br />

redecoration.<br />

Boiler Cpd Shelving 200<br />

Drive Extend turning area 1500<br />

Pavement Highways to repair crossing -<br />

M- Maintenance See schedule <strong>of</strong> maintenance below<br />

Security See comments re nave windows above -<br />

Disabled Access<br />

The church is level throughout apart from the chancel<br />

steps. Extending the parish room paving to the vicarage<br />

would improve disabled access for garden events.<br />

750<br />

10. Maintenance plan<br />

Although the measure requires the church to be inspected every 5 years, it should be realized that<br />

serious trouble may develop in between these surveys if minor defects are left unattended.<br />

Churchwardens are required by the Care <strong>of</strong> Churches and Ecclesiastical Jurisdiction Measure 1991 to<br />

make an annual inspection <strong>of</strong> the fabric and furnishings <strong>of</strong> the church, and to prepare a report for<br />

consideration by the meeting <strong>of</strong> the PCC before the Annual Parochial Church Meeting. This then<br />

must be presented with any amendments made by the PCC, to the Annual Parochial Church<br />

Meeting. The PCC are strongly advised to enter into contract with a local builder for the cleaning<br />

out <strong>of</strong> gutters and downpipes twice a year.<br />

It is good practice for the PCC to appoint a fabric <strong>of</strong>ficer to take care <strong>of</strong> the routine maintenance <strong>of</strong><br />

the church. This <strong>of</strong>ficer must report to the PCC and remain subject to its control and direction.<br />

Further guidance on the inspection and the statutory responsibilities are contained in How to Look<br />

After Your Church. The Churchwarden’s Year gives general guidance on routine inspections and<br />

housekeeping, and general guidance on cleaning is given in Handle with Prayer, both published for<br />

the CCC by Church House Publishing.<br />

The following list gives an indication <strong>of</strong> the time <strong>of</strong> year when certain jobs should be done. It is not<br />

exhaustive.<br />

Spring, early summer<br />

Whenever necessary inspect gutters and ro<strong>of</strong>s from ground level and inside especially when it is<br />

raining.<br />

Clear snow from vulnerable areas.<br />

Clear concealed valley gutters.<br />

Make full inspection <strong>of</strong> the church for annual meeting.<br />

Check church inventory and update log book.<br />

Check bird-pro<strong>of</strong>ing to meshed openings.<br />

15


Sweep out any high level spaces. Check for bats and report any finds to English Nature.<br />

Cut any ivy starting to grow up walls and poison.<br />

Spray around the base <strong>of</strong> the walls to discourage weed growth.<br />

Check heating apparatus and clean flues.<br />

Summer<br />

Arrange for routine service <strong>of</strong> heating equipment.<br />

Check interior between second week <strong>of</strong> April and second week <strong>of</strong> June for active beetle infestation<br />

and report findings to the pr<strong>of</strong>essional adviser.<br />

Check all ventilators in the floor and elsewhere and clean out as necessary.<br />

Spring clean the church.<br />

Cut any church grass.<br />

Cut ivy growth and spray (again).<br />

Recheck heating installation before autumn and test run.<br />

Arrange for any external painting required.<br />

Autumn<br />

Check gutters, downpipes, gullies, ro<strong>of</strong>s etc after leaf fall.<br />

Rod out any drain runs to ensure water clears easily, especially under pavements.<br />

Inspect ro<strong>of</strong>s with binoculars from ground level, counting number <strong>of</strong> slipped slates, etc for repair.<br />

Clean rubbish from ventilation holes inside and out.<br />

Check heating installation, lagging to hot water pipes etc and repair as necessary.<br />

Winter<br />

Check ro<strong>of</strong> spaces and under floors for vermin and poison.<br />

Check under valley gutters after cold spells for signs <strong>of</strong> leaking ro<strong>of</strong>s.<br />

Bleed radiators and undertake routine maintenance to heating systems.<br />

Check temperatures in different areas <strong>of</strong> the building to ensure even temperature throughout and<br />

note any discrepancies.<br />

Annually<br />

Arrange for servicing <strong>of</strong> fire extinguishers.<br />

Inspect abutting buildings to ensure there is no build up <strong>of</strong> leaves or other debris against the walls.<br />

Check the condition <strong>of</strong> outside walls, windows, sash cords, steps and any other areas likely to be a<br />

hazard to people entering the building.<br />

Check the extent <strong>of</strong> any insurance cover and update as necessary.<br />

Every 5 years<br />

Arrange for testing <strong>of</strong> the electrical systems.<br />

Arrange for the testing <strong>of</strong> any lightning protection.<br />

It is vital, especially with older buildings, to keep them warm and well ventilated at all times. The<br />

fabric <strong>of</strong>ficer should ensure that such ventilation is taking place, especially after services.<br />

16


11. Advice to the PCC<br />

<br />

<br />

<br />

<br />

<br />

This is a summary report; it is not a specification for the execution <strong>of</strong> the work and must not be<br />

used as such.<br />

The pr<strong>of</strong>essional adviser is willing to advise the PCC on implementing the recommendations and<br />

will if so requested prepare a specification, seek tenders and oversee the repairs.<br />

The PCC is advised to seek ongoing advice from the pr<strong>of</strong>essional adviser on problems with the<br />

building.<br />

Contact should be made with the insurance company to ensure that cover is adequate.<br />

The repairs recommended in the report will (with the exception <strong>of</strong> some minor maintenance<br />

items) be subject to the faculty jurisdiction. Guidance on whether particular work is subject to<br />

faculty can be obtained from the DAC.<br />

Fire safety advice can be found at www.churchcare.co.uk/building.phpCDE<br />

A minimum <strong>of</strong> 2 water type fire extinguishers (sited adjacent to each exit) should be provided plus<br />

additional special extinguishers for the organ and boiler house, as detailed below.<br />

Large churches will require more extinguishers. As a general rule <strong>of</strong> thumb, one water extinguisher should<br />

be provided for every 250 square metres <strong>of</strong> floor area.<br />

Location and Type <strong>of</strong> Extinguisher:<br />

General area- Water<br />

Organ-CO²<br />

Boiler House, Solid fuel boiler-Water<br />

Gas fired boiler-Dry powder<br />

Oil fired boiler-Foam (or dry powder if electricity supply to boiler room cannot easily be isolated)<br />

All extinguishers should be inspected annually by a competent engineer to ensure they are in good<br />

working order.<br />

<br />

<br />

<br />

<br />

Electrical Installation<br />

Any electrical installation should be tested at least every five years in accordance with the<br />

recommendations <strong>of</strong> the Church Buildings Council. The inspection and testing should be carried<br />

out in accordance with IEE Regulations, Guidance Note No. 3, and an inspection certificate<br />

obtained in every case. The certificate should be kept with the Church Log Book. For further<br />

details including who is qualified to undertake the inspection, please see<br />

www.churchcare.co.uk/building.phpCDE<br />

This present report is based upon a visual inspection <strong>of</strong> the main switchboard and <strong>of</strong> certain<br />

sections <strong>of</strong> the wiring selected at random, without the use <strong>of</strong> instruments.<br />

Heating Installation<br />

A proper examination and test should be made <strong>of</strong> the heating system by a qualified engineer<br />

each summer before the heating season begins, and the report kept with the Church Log Book.<br />

Lightning Protection<br />

Any lightning conductor should be tested at least every five years in accordance with the current<br />

British Standard by a competent engineer. The record <strong>of</strong> the test results and conditions should<br />

be kept with the Church Log Book.<br />

Asbestos<br />

A suitable and sufficient assessment should be made as to whether asbestos is or is liable to be<br />

present in the premises. Further details on making an assessment are available on<br />

17


www.churchcare.co.uk/building.phpCDE. The assessment has not been covered by this report<br />

and it is the duty <strong>of</strong> the PCC to ensure that his has been, or is carried out.<br />

Disability Discrimination Act<br />

The PCC should ensure that they have understood their responsibilities under the Disability<br />

Discrimination Act 1995. Further details and guidance are available at<br />

www.churchcare.co.uk/legal<br />

Health and Safety<br />

Overall responsibility for the health and safety <strong>of</strong> the church and churchyard lies with the<br />

incumbent and PCC. This report may identify areas <strong>of</strong> risk as part <strong>of</strong> the inspection but this does<br />

not equate to a thorough and complete risk assessment by the PCC <strong>of</strong> the building and<br />

churchyard.<br />

Bats and other protected species<br />

The PCC should be aware <strong>of</strong> its responsibilities where protected species are present in a church.<br />

Guidance can be found on www.churchcare.co.uk<br />

Sustainable Buildings<br />

A quinquennial inspection is a good opportunity for a PCC to reflect on the sustainability <strong>of</strong> the<br />

building and its use. This may include adapting the building to allow greater community use,<br />

considering how to increase resilience in the face <strong>of</strong> predicated changes to the climate, as well<br />

as increasing energy efficiency and considering other environmental issues. Further guidance is<br />

available on www.churchcare.co.uk and www.shrinkingthefootprint.c<strong>of</strong>e.anglican.org<br />

18


Church Plan<br />

19