General Terms and Conditions - Calcutta Telephones
General Terms and Conditions - Calcutta Telephones
General Terms and Conditions - Calcutta Telephones
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CLAUSES OF CONTRACT<br />
B S N L<br />
prejudice to any other liability, pay to the BSNL a sum not exceeding Rs.200/- for<br />
every default, breach or furnishing, making, submitting , filing such materially<br />
incorrect statements <strong>and</strong> in the event of the contractor (s) defaulting continuously in<br />
this respect, the penalty may be enhanced to Rs.200/- per day for each day of default<br />
subject to a maximum of 5 percent of the estimated cost of the work put to tender.<br />
The decision of the Engineer-in-Charge shall be final <strong>and</strong> binding on the parties.<br />
Should it appear to the Engineer-in-Charge that the contractor(s) is/ are not properly<br />
observing <strong>and</strong> complying with the provi sions of the Contractor’s Labour Regulations<br />
<strong>and</strong> Model Rules <strong>and</strong> the provisions of the Contract labour (Regulation <strong>and</strong> Abolition)<br />
Act, 1970, <strong>and</strong> the Contract Labour (R&A) Central Rules 1971, for the protection of<br />
health <strong>and</strong> sanitary arrangements for the work-people employed by the<br />
contractor(s)(hereinafter referred as”the said Rules”) the Engineer-in-Charge shall<br />
have power to give notice in writing to the contractor(s) requiring that the said Rules<br />
to be complied with <strong>and</strong> the amenities prescribed therein be provided to the workpeople<br />
within a reasonable time to be specified in the notice. If the contractor(s) shall<br />
fail within the period specified in the notice to comply with <strong>and</strong>/or observe the said<br />
Rules <strong>and</strong> to provide the amenities to the workpeople as aforesaid, the Engineer-in-<br />
Charge shall have the power to provide the amenities herein before mentioned at the<br />
cost of the contractor(s). The contractor(s) shall erect, make <strong>and</strong> maintain at his/their<br />
own expense <strong>and</strong> to approved st<strong>and</strong>ards all necessary huts <strong>and</strong> sanitary<br />
arrangements required for his/their work-people on the site in connection with the<br />
execution of the works, <strong>and</strong> if the same shall not have been erected or constructed,<br />
according to approved St<strong>and</strong>ards, the Engineer-in-Charge shall have power to give<br />
notice in writing to the contractor(s) requiring that the said huts <strong>and</strong> sanitary<br />
arrangements be re-modelled <strong>and</strong>/ or reconstructed according to approved<br />
st<strong>and</strong>ards, <strong>and</strong> if the contractor(s) shall fail to remodel or reconstruct such huts <strong>and</strong><br />
sanitary arrangements according to approved st<strong>and</strong>ards within the period specified in<br />
the notice, the Engineer-in-Charge shall have the power to remodel or reconstruct<br />
such huts <strong>and</strong> sanitary arrangements according to approved st<strong>and</strong>ards at the cost of<br />
the contractor(s).<br />
CLAUSE 19 H<br />
The contractor(s) shall at his/their own cost provide his /their labour with a sufficient<br />
number of huts (hereinafter referred to as the camp) of the following specifications on<br />
a suitable plot of l<strong>and</strong> to be approved by the Engineer-in-Charge.<br />
i)<br />
a) The minimum height of each hut at the eaves level shall be 2.10m (7 ft.) <strong>and</strong><br />
floor area to be provided will be at the rate of 2.7 Sq.ms. (30 Sq.Ft.) for each<br />
member of the workers family staying with the labourers.<br />
b) The contractor(s) shall in addition construct suitable cooking places having a<br />
minimum area of 1.80m X 1.50m(6’X5’) adjacent to the hut for each family.<br />
c) The contractor(s) shall also construct temporary latrines <strong>and</strong> urinals for the use<br />
of the labourers each on the scale of not less than four per each one hundred<br />
of the total strength, separate latrines <strong>and</strong> urinals being provided for women.<br />
d) The contractor(s) shall construct sufficient number of bathing <strong>and</strong> washing<br />
places, one unit for every 25 persons residing in the camp. These bathing <strong>and</strong><br />
washing places shall be suitably screened.<br />
ii)<br />
a) All the huts shall have walls of sun-dried or burnt-bricks laid in mud mortar or<br />
other suitable local materials as may be approved by the Engineer-in-Charge.<br />
41