CLAUSES OF CONTRACT<br />
B S N L<br />
CLAUSE 27<br />
conduct any litigation that may arise therefrom, provided that the contractor shall not<br />
be liable to indemnify the Bharat Sanchar Nigam Limited if the infringement of the<br />
patent or design or any alleged patents or design right is the direct result of an order<br />
passed by the Engineer-in-Charge in this behalf.<br />
Lumpsum<br />
Provisions<br />
in Tender<br />
When the estimate on which a tender is made includes lumpsum in respect of parts of<br />
the work, the contractor shall be entitled to payment in respect of the items of work<br />
involved or the part of the work in question at the same rates as are payable under<br />
this contract for such items, or if the part of the work in question is not, in the opinion<br />
of the Engineer-in-Charge, payable by measurement, the Engineer-in-Charge may at<br />
his discretion pay the lumpsum amount entered in the estimate, <strong>and</strong> the certificate in<br />
writing of the Engineer-in-Charge shall be final <strong>and</strong> conclusive against the contractor<br />
with regard to any sum or sums payable to him under the provisions of this clause.<br />
CLAUSE 28<br />
Action where<br />
no<br />
Specifications<br />
are specified<br />
In case of any class of work for which there are no such specifications as referred to<br />
in Clause 11,such work shall be carried out in accordance with the Bureau of Indian<br />
St<strong>and</strong>ards specifications. In case there is no such specifications in Bureau of Indian<br />
St<strong>and</strong>ards, the work shall be carried out as per manufacturer’s specifications. In case<br />
no such manufacturer’s specifications is available then as per District Specifications.<br />
In case there are no such specifications as required above, the work shall be carried<br />
out in all respects in accordance with the instructions <strong>and</strong> requirements of the<br />
Engineer-in-Charge.<br />
CLAUSE 29<br />
Withholding<br />
<strong>and</strong> lien in<br />
respect of<br />
sum due<br />
from the<br />
Contractor<br />
i) Whenever any claim or claims for payment of a sum of money arises out of or<br />
under the contract or against the contractor, the Engineer-in-Charge or the<br />
Government shall be entitled to withhold <strong>and</strong> also have a lien to retain such sum<br />
or sums in whole or in part from the security, if any, deposited by the contractor<br />
<strong>and</strong> for the purposes aforesaid, the Engineer-in-Charge or the Government shall<br />
be entitled to withhold the security deposit, if any, furnished as the case may be<br />
<strong>and</strong> also have lien over the same pending finalisation or adjudication of any such<br />
claim. In the event of the security being insufficient to cover the claimed amount<br />
or amounts or if no security has been taken from the contractor, the Engineer-in-<br />
Charge or the Government shall be entitled to withhold <strong>and</strong> have a lien to retain<br />
such claimed amount or amounts referred to above, from any sum or sums found<br />
payable or which may at any time thereafter become payable to the contractor<br />
under the same contract or any other contract with the Engineer-in-Charge of the<br />
Government or any contracting person through the Engineer-in-Charge pending<br />
finalisation of adjudication of any such claim.<br />
It is an agreed term of the contract that the sum of money or moneys so withheld<br />
or retained under the lien referred to above by the Engineer-in-Charge or<br />
Government will be kept withheld or retained as such, by the Engineer-in-Charge,<br />
till the claim arising out of or under the contract is determined by the arbitrator (if<br />
the contract is governed by the arbitration clause) or by the competent court, as<br />
the case may be <strong>and</strong> that the contractor will have no claim for interest or<br />
damages whatsoever on any account in respect of such withholding or retention<br />
under the lien referred to above <strong>and</strong> duly notified as such to the contractor. For<br />
the purpose of this clause, where the contractor is a partnership firm or a limited<br />
company, the Engineer-in-charge or the Government shall be entitled to withhold<br />
<strong>and</strong> also have a lien to retain towards such claimed amount or amounts in whole<br />