Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Roadway<br />
Figur<br />
igure 7.14 Wet meadow road crossing options. (From Managing <strong>Roads</strong> for Wet Meadow Ecostream<br />
Recovery by Wm. Zeedyk, 1996)<br />
PERMEABLE FILL WITH CULVERTS<br />
(for periodic high flows on flood plains and meadows)<br />
a.<br />
Berm<br />
Culverts<br />
Flow<br />
Flow<br />
Meadow<br />
b.<br />
Roadway<br />
Meadow<br />
surface<br />
Berm<br />
Geotextile<br />
Flow<br />
10-15 cm minus rock<br />
c.<br />
Geotextile<br />
ROCK FILL WITHOUT CULVERTS<br />
(for minimal overland flow)<br />
Roadway<br />
15 cm Thick<br />
Aggregate<br />
Base Course<br />
15 cm Minus Rock<br />
Course Placed Approx.<br />
30 cm Thick<br />
Flow<br />
Flow<br />
LOW-VOLUME ROADS BMPS:72