18.01.2015 Views

Chapter 7 Drainage of Low-Volume Roads

Chapter 7 Drainage of Low-Volume Roads

Chapter 7 Drainage of Low-Volume Roads

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○<br />

Figur<br />

igure 7.4 Culvert cross-drains.<br />

Inlet<br />

Structure<br />

as Needed<br />

Spacing 30–150 m<br />

Berm<br />

0 o -30 o<br />

Place Outlet Pipe at<br />

Natural Ground<br />

Level or Riprap<br />

Armor the Fill<br />

Material.<br />

Figur<br />

igure e 7.5 Water bar construction. (Adapted from Wisonsin’s Forestry Best Management Practices<br />

for Water Quality. 1995, Publication FR093, Wisconsin Department <strong>of</strong> Natural Resources)<br />

Berm Tied into<br />

Embankment<br />

Spacing 10–75 m<br />

0-25 o<br />

Exit onto Stable<br />

or Armored<br />

Ground<br />

a. Perspective View<br />

30-60 cm 30-60 cm<br />

Road Grade<br />

1 - 2 m 1 - 2 m 1 - 2 m<br />

b. Cross-Section<br />

LOW-VOLUME ROADS BMPS : 59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!