18.01.2015 Views

standard form of bidding documents for epc/turnkey - Pakistan ...

standard form of bidding documents for epc/turnkey - Pakistan ...

standard form of bidding documents for epc/turnkey - Pakistan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(f)<br />

clearance <strong>of</strong> debris, maximum @ 5 % <strong>of</strong> minimum amount <strong>of</strong> Third Party<br />

Liability Insurance<br />

Plus 30% to cover any additional costs resulting from loss or damage there<strong>of</strong>.<br />

Sub-Clause 43.1.3 General<br />

Should a loss be sustained, the Contractor shall replace or repair any loss or damage at his own<br />

cost and complete the Works in accordance with the Contract as soon as possible after occurrence<br />

<strong>of</strong> such loss or damages, without waiting <strong>for</strong> the settlement <strong>of</strong> the insurance claim.”<br />

Sub-Clause 43.2 Contractor's Equipment<br />

The text <strong>of</strong> Sub-Clause 43.2 is deleted and substituted by the following:<br />

“The Contractor shall insure the Contractor's Equipment <strong>for</strong> its full replacement value while on the<br />

Site against all loss or damage caused by any <strong>of</strong> the Contractor's Risks.”<br />

Sub-Clause 43.7 Remedies on the Contractor’s Failure to Insure<br />

In 3rd line after the word, “purpose”, the expression “and reasonable costs including the manhours<br />

costs <strong>of</strong> Employer’s Personnel” is added.<br />

The following new Sub-Clauses 43.9 to 43.12 are added:<br />

Sub-Clause 43.9 Currency <strong>of</strong> Insurance<br />

All policies <strong>of</strong> Insurance <strong>of</strong> the Plant shall provide <strong>for</strong> payment <strong>of</strong> indemnity to be made in<br />

such amounts as will allow making good <strong>of</strong> loss <strong>of</strong> or damage to the whole or any part <strong>of</strong> the<br />

Works.<br />

Sub-Clause 43.10 Contractor to Notify<br />

It shall be the responsibility <strong>of</strong> the Contractor to notify the insurance company <strong>of</strong> any changes in<br />

nature and extent <strong>of</strong> the Works and to ensure the adequacy <strong>of</strong> the insurance coverage at all times in<br />

accordance with the provisions <strong>of</strong> the Contract.<br />

Sub-Clause 43.11 Procurement <strong>of</strong> Insurance Policies<br />

The Contractor shall procure and submit the insurance cover under this Clause within a<br />

period <strong>of</strong> twenty eight (28) days from the date <strong>of</strong> receipt <strong>of</strong> Letter <strong>of</strong> Acceptance from the<br />

Employer.<br />

Sub-Clause 43.12 Insurance Company<br />

The policies <strong>of</strong> marine insurance and all other insurances with respect to Contractor’s operations in<br />

<strong>Pakistan</strong> shall be effected with any <strong>of</strong> the insurance company acceptable to the Employer operating<br />

in <strong>Pakistan</strong> with financial strength rating <strong>of</strong> AA approved by <strong>Pakistan</strong> Credit Rating Agency<br />

(PACRA) or JCR including National Insurance Corporation (NIC) <strong>of</strong> <strong>Pakistan</strong>.”<br />

Sub-Clause 44.6 Damage Caused by Force Majeure

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!