19.01.2015 Views

Report 44 Task 3 Data Logger Telemetry System

Report 44 Task 3 Data Logger Telemetry System

Report 44 Task 3 Data Logger Telemetry System

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

future plan is to extend the system to cover most critical points along the MWRI irrigation<br />

The<br />

The extension will include having a water quality-monitoring network starting from Aswan<br />

network.<br />

security is an issue that will be considered in future plans. Securing equipment is also another<br />

<strong>Data</strong><br />

issue.<br />

important<br />

relations between the collected data parameters is a promising task that should be considered<br />

The<br />

the future plan. This relation could help in saving hardware installation of some sensors as some<br />

in<br />

data flow between collection points and remote sites has to be planned especially when the<br />

The<br />

of sites increases. Defining data flows between different points is an important task.<br />

number<br />

<strong>Task</strong> 3. <strong>Data</strong> <strong>Logger</strong> Based <strong>Telemetry</strong> Monitoring <strong>System</strong><br />

13. RECOMMENDATIONS AND FUTURE PLAN<br />

to the Delta. During this year, Aswan Directorate will be provided with two data logger sites.<br />

The GPRS will be considered as an alternative to GSM data, in which running cost will be minimal.<br />

additional information could be calculated from the measured data.<br />

LIFE IWRM 26 INTERNATIONAL RESOURCES GROUP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!