19.01.2015 Views

Report 44 Task 3 Data Logger Telemetry System

Report 44 Task 3 Data Logger Telemetry System

Report 44 Task 3 Data Logger Telemetry System

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Task</strong> 3. <strong>Data</strong> <strong>Logger</strong> Based <strong>Telemetry</strong> Monitoring <strong>System</strong><br />

Power Supply Scheduled Maintenance Form<br />

Maintenance Performed by:<br />

Date: / / Time:<br />

Is the battery voltage between 12 and 10 YES NO<br />

1. If the battery less then 12 voltage:<br />

2. Clean the solar panel.<br />

3. Is the solar panel voltage more then 15 volt DC YES NO<br />

4. If the voltage is very low, change solar panel.<br />

5. Is there AC supply at the side YES NO<br />

6. Is the output voltage 13 voltage from AC charger YES NO<br />

7. If there is no DC output from charger check the fuse.<br />

8. If the fuse burned, replace fuse.<br />

9. If there is still no output, replace charger.<br />

10. Is output from regulator IS 12 vdc YES NO<br />

11. If there is no output, replace regulator.<br />

12. If AC charger/solar panel/sun regulator are ok, and the battery voltage doesn’t<br />

increase, replace battery.<br />

LIFE IWRM 40 INTERNATIONAL RESOURCES GROUP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!