19.01.2015 Views

Report 44 Task 3 Data Logger Telemetry System

Report 44 Task 3 Data Logger Telemetry System

Report 44 Task 3 Data Logger Telemetry System

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

sites of the pilot project were carefully selected. All the sites are critical and have a major effect<br />

The<br />

water management, with an essential need for monitoring near real time data as most of them<br />

on<br />

water distribution problems. The site selection criteria helped in evaluating the<br />

encounter<br />

of the system and identifying achieved goals. At all selected sites the upstream and<br />

performance<br />

water levels and water flows are monitored. Water quality parameters are monitored<br />

downstream<br />

two sites. The pump monitoring system was installed at two sites. The pilot project is<br />

at<br />

Abou el-Akhadr Regulator<br />

•<br />

Meit Bera Regulator<br />

•<br />

Meluig Regulator<br />

•<br />

Hebeil Regulator<br />

•<br />

El-Ghawasa Regulator<br />

•<br />

Ismailia Intake<br />

•<br />

Mealaa Pumping Station (PS)<br />

•<br />

East Menofiya PS<br />

•<br />

El Selsala PS.<br />

•<br />

Daraw Regulator<br />

•<br />

GSM mobile communication network provided flexibility for data collection. <strong>Data</strong> can be<br />

The<br />

from any remote location provided that it is covered by the mobile network. The data<br />

collected<br />

be collected at the irrigation directorate office, or a water distribution engineer could use a<br />

might<br />

to collect data in the field. For now, the data are monitored at different levels from the<br />

laptop<br />

Berket el-Saab IWMD<br />

•<br />

Luxor IWMD<br />

•<br />

Zifta General Directorate<br />

•<br />

East Sharkiya General Directorate<br />

•<br />

West Sharkiya General Directorate<br />

•<br />

East Qena General Directorate<br />

•<br />

Aswan Directorate.<br />

•<br />

Aswan IWMD<br />

•<br />

Lower Egypt Water Distribution Directorates at Tanta<br />

•<br />

Central Directorate for <strong>Data</strong> Collection and Communication <strong>Telemetry</strong><br />

•<br />

The Livelihood and Income from the Environment (LIFE) Integrated Water<br />

•<br />

<strong>Task</strong> 3. <strong>Data</strong> <strong>Logger</strong> Based <strong>Telemetry</strong> Monitoring <strong>System</strong><br />

3. PILOT PROJECT SITES<br />

at the following sites:<br />

implemented<br />

Kilometer (km) 24 on Mous Regulator<br />

•<br />

locations:<br />

following<br />

Quesna IWMD<br />

•<br />

• El Selsala IWMD<br />

• Central Directorate for Water Distribution at the MWRI Building<br />

Resources Management Project.<br />

LIFE IWRM 3 INTERNATIONAL RESOURCES GROUP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!