(b) Transient<br />

Again from the summation tables the maximum start kVA transient requirement is 271 kVA.<br />

SECTION 4595<br />

January 1990<br />

Page 6<br />

The 271 kVA transient load must be checked against the voltage dip curve for the generator selected to<br />

determine the % transient voltage dip.<br />

If this level of voltage dip on starting the largest load is acceptable, then the frame size chosen also remains<br />

acceptable from a transient performance point of view.<br />

(c) Input Power<br />

The a.c. generator shaft input power is the same as the prime move shaft output power and can be estimated.<br />

The a.c. generator efficiency figures are given in the data sheet.<br />

From Section 4511:<br />

prime mover shaft = a.c. generator kW output rating<br />

power output appropriate a.c. generator efficiency