(b) Transient<br />
Again from the summation tables the maximum start kVA transient requirement is 271 kVA.<br />
SECTION 4595<br />
January 1990<br />
Page 6<br />
The 271 kVA transient load must be checked against the voltage dip curve for the generator selected to<br />
determine the % transient voltage dip.<br />
If this level of voltage dip on starting the largest load is acceptable, then the frame size chosen also remains<br />
acceptable from a transient performance point of view.<br />
(c) Input Power<br />
The a.c. generator shaft input power is the same as the prime move shaft output power and can be estimated.<br />
The a.c. generator efficiency figures are given in the data sheet.<br />
From Section 4511:<br />
prime mover shaft = a.c. generator kW output rating<br />
power output appropriate a.c. generator efficiency