19.01.2015 Views

BIM e – Submission Guideline Structural - Corenet

BIM e – Submission Guideline Structural - Corenet

BIM e – Submission Guideline Structural - Corenet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.6. Project Elevation Datum<br />

Project Elevation Datum must be aligned to “Singapore Standard Elevation Datum (>100m)”, and not<br />

placed on ground zero (Elev +0.0). There is no need to physically move the model to the actual elevation<br />

because one can establish this value in the <strong>BIM</strong> software.<br />

Figure 3 – Project Elevation Datum<br />

*Note: Unit of measurements for “Singapore Standard Datum” is usually represented in<br />

“meters” while <strong>BIM</strong> unit settings maybe in “millimeters”.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!