Rutland 913 Windcharger Owners Manual - Marlec Engineering Co ...
Rutland 913 Windcharger Owners Manual - Marlec Engineering Co ...
Rutland 913 Windcharger Owners Manual - Marlec Engineering Co ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Rutland</strong> <strong>913</strong> <strong>Windcharger</strong><br />
Installation & Operation<br />
Specification and Performance<br />
Guideline Performance Curve<br />
Note : The curve shown below is for clear, non-turbulent wind conditions; this<br />
may not be achieved in some installations. Refer to the section on Siting to<br />
optimise performance at your site. Wind speeds are those flowing across the<br />
turbine of the <strong>Windcharger</strong> and may not reflect those measured at mast top or<br />
those reported by the Met. Office.<br />
20<br />
10<br />
18<br />
9<br />
16<br />
WINDSPEED CONVERSION<br />
8<br />
Charge into 12 V Battery (Amperes)<br />
14<br />
12<br />
10<br />
8<br />
6<br />
4<br />
2<br />
0<br />
MPH = Knots x 1.15<br />
M/S = Knots x .515<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
1<br />
0<br />
Charge into 24 V Battery (Amperes)<br />
0 5 10 15 20 25 30 35 40<br />
Windspeed (Knots)<br />
Doc No:SM-130 Iss. J 15.02.13 16 <strong>Marlec</strong> Eng <strong>Co</strong> Ltd