22.01.2015 Views

quality assurance project plan (qapp) - National Atmospheric ...

quality assurance project plan (qapp) - National Atmospheric ...

quality assurance project plan (qapp) - National Atmospheric ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NWS Stick Precipitation Gauge SOP<br />

Document No.: SOP-EPW07061-1430<br />

Revision No. 1<br />

Date: May 2008<br />

Page 13 of 14<br />

9.2 Computer Software<br />

The field computer will have a Microsoft Windows ® operating system. Microsoft Office ® and<br />

Microsoft Access ® will be used to develop the FSSD which will be the database used to manage<br />

the survey results. The FSSD and examples of the types of forms and screens have been<br />

discussed in Section 8.0 and subsections.<br />

10.0 Data Management and Records Management<br />

Data and records management procedures are presented in the AIRMoN Site Performance Survey<br />

Standard Operating Procedures (SOP-EPW07061-1030).<br />

11.0 Quality Control and Quality Assurance<br />

EEMS is acutely aware that the NADP Site Survey Program is one <strong>quality</strong> <strong>assurance</strong>/<strong>quality</strong><br />

control (QA/QC) role of the NADP program. As such, the internal site survey program QA/QC<br />

has added importance and consequence since not only data collected for the purpose of the<br />

survey, but data collected for the purpose of the NADP are jeopardized if the survey data are not<br />

accurate and <strong>quality</strong> assured.<br />

The EEMS personnel and Survey Technicians are aware of the significance of the survey<br />

program and the impact of the data collected. They are all experienced professionals and<br />

dedicated to the programs of the NADP and EPA Clean Air Markets Division. The following<br />

sections describe the <strong>quality</strong> process that is not only employed for NADP Site Performance<br />

Survey procedures, but for all <strong>project</strong>s at EEMS<br />

11.1 Review Verification and Vigilance<br />

The NADP Site Survey Program management structure ensures sufficient review and QA/QC<br />

procedures are applied. Prior to conducting any field work all procedures are documented and<br />

reviewed by experts in the field of deposition and precipitation monitoring. The consultants<br />

selected to assist with the <strong>quality</strong> <strong>assurance</strong> of the documentation and survey program are Dr.<br />

Peter Finkelstein and Scotty Dossett.<br />

As described in the previous sections throughout this SOP all data collected are reviewed and<br />

verified during the survey and data management process. This begins with the preparation of the<br />

survey kit materials for the site Survey Technician.<br />

File location<br />

EEMS, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!