22.01.2015 Views

quality assurance project plan (qapp) - National Atmospheric ...

quality assurance project plan (qapp) - National Atmospheric ...

quality assurance project plan (qapp) - National Atmospheric ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NTN Site Performance Survey SOP<br />

Document No.: SOP-EPW07061-1010<br />

Revision No. 1<br />

Date: May 2008<br />

Page 9 of 26<br />

• Melissa Rury 202-343-9882 rury.melissa@epa.gov EPA Project Officer<br />

• Mark Rhodes 217-244-6413 Rhodes1@illinois.edu NADP QA Manager<br />

• Matt Layden 217-244-0372 ntn@sws.uiuc.edu CAL Liaison<br />

• Roger Claybrooke 217-244-2838 dclay@sws.uiuc.edu NADP PO<br />

In order to adhere to the schedule set forth in the NADP Site Survey Program QAPP, the above<br />

listed personnel must be contacted no less than one month prior to the <strong>plan</strong>ned date of the site<br />

survey. The initial communication must include the information contained in Table 1 for each<br />

<strong>plan</strong>ned site survey.<br />

Table 1. Preliminary Site Communication Information<br />

Site Name Site ID Survey Date Previous Survey Date NADP Network(s)<br />

Site #1<br />

NTN<br />

Site #2<br />

Site #3<br />

:<br />

Information obtained from the NADP liaisons during the preliminary communication should<br />

include the information contained in Table 2 below for each site.<br />

Table 2. Initial Site Information<br />

Site operator (name, address, phone, e-mail)<br />

Site supervisor (name, address, phone, e-mail)<br />

Site sponsor contact (name, address, phone, e-mail)<br />

Precipitation gauge (manufacturer, model)<br />

Collector (manufacturer, model)<br />

Balance (manufacturer, model)<br />

Site characteristics (i.e., solar power, remote, etc)<br />

Known problems (equipment and/or siting related)<br />

Additional requests (training issues, etc)<br />

Logistical concerns (i.e., passes or keys required, etc)<br />

Site sketch available and provided (pdf file name)<br />

Existing Information<br />

File location<br />

EEMS, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!