Disincentivising overbidding for toll road concessions
Disincentivising overbidding for toll road concessions
Disincentivising overbidding for toll road concessions
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
REVIEW OF THE HEAVY VEHICLE SAFETY AND PRODUCTIVITY PROGRAM<br />
List of tables<br />
Table 2.1 Errors in <strong>toll</strong> <strong>road</strong> traffic <strong>for</strong>ecasts 12<br />
Table 2.2 VfM assessment 22<br />
Table 2.3 Summary of the explanations <strong>for</strong> <strong>overbidding</strong> in the literature 28<br />
Table 3.1 International examples of flexible-term highway <strong>concessions</strong> 37<br />
Table 4.1 Delivery plans in rail franchising 48<br />
Table 4.2 Winning bids in the UK 3G spectrum auctions 53<br />
Table 4.3 Ofwat’s CIS matrix 56<br />
List of figures<br />
Figure 2.1 Stages in the <strong>concessions</strong> process 21<br />
Figure 4.1 The Department <strong>for</strong> Transport’s revenue assessment guidelines 49<br />
Figure 5.1 Potential causes of <strong>overbidding</strong> 60<br />
Figure 5.2 Stages in the <strong>concessions</strong> process 61<br />
Figure A2.1 The winner’s curse 69<br />
Figure A2.2 The winner’s curse with bid discounting 70<br />
Figure A2.3 Rational bidding to overcome the winner’s curse 70<br />
List of boxes<br />
Box 2.1 Empirical evidence of optimism bias 16<br />
Box 2.2 UK value-<strong>for</strong>-money assessment guidance 22<br />
Box 2.3 Options <strong>for</strong> <strong>concessions</strong> design 23<br />
Box 2.4 Identifying and defining an incentive 26<br />
Box 3.1 UK PPP <strong>road</strong>s: the rise and fall of availability-based payment mechanisms 31<br />
Box 3.2 Portuguese SCUTs: a lesson in unaf<strong>for</strong>dability 34<br />
Box 3.3 Pass-through <strong>toll</strong>ing: Auto-Estradas do Baixo Tejo 35<br />
Box 3.4 Flexible-term <strong>concessions</strong> using the least present value of revenues 38<br />
Box 3.5 Construct-then-concession: 407ETR 40<br />
Box 3.6 The North Tarrant Express 42<br />
Box 3.7 The LBJ Express (IH 635) 43<br />
Box 4.1 The Intercity East Coast franchise 51<br />
Box 5.1 Interviews 59<br />
Box A2.1 Empirical evidence of the winner’s curse 71<br />
iv