Public reports pack PDF 4 MB - East Lindsey District Council
Public reports pack PDF 4 MB - East Lindsey District Council
Public reports pack PDF 4 MB - East Lindsey District Council
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Planning Committee<br />
18.04.2013<br />
<strong>Council</strong>lor Mrs. P.M. Cooper requested that it be noted that in respect of<br />
Minute Nos. 172,173,175,176 and 182 that she was the Ward Member<br />
and remained in the Meeting during discussion and voting thereon.<br />
<strong>Council</strong>lor J.M. Swanson requested that it be noted that in respect of<br />
Minute No. 178 he was the Ward Member and remained in the Meeting<br />
during discussion and voting thereon.<br />
166. MINUTES:<br />
The Minutes of the Meeting held on 14 March 2013, were confirmed and<br />
signed as a correct record.<br />
167. N/133/00586/12:<br />
Application Type: Full Planning Permission<br />
Proposal: The erection, 25 year operation and<br />
subsequent decommissioning of three wind<br />
turbines up to 113.5m tall to the tip of a blade<br />
in a vertical position, control/substation<br />
building, installation of underground electrical<br />
cables, formation of access tracks and<br />
upgraded access from the A1031 Fen Lane,<br />
meteorological monitoring mast of up to 78m<br />
height, crane hard standings areas, re-design<br />
of vehicular access into the Environments<br />
Agency’s flood reservoir and a temporary<br />
construction/storage compound together with<br />
other works ancillary to the main development<br />
including landscaping, fencing and habitat<br />
management enhancements.<br />
Location:<br />
Land at Louth Canal, Fen Lane, North Thoresby<br />
Applicant:<br />
PFR (Louth Canal) Limited<br />
Mr. Newman spoke in objection to the application.<br />
Mr. Pocklington spoke in support of the application.<br />
Members received an application for the erection, 25 year operation and<br />
subsequent decommissioning of three wind turbines up to 113.5m tall to<br />
the tip of a blade in a vertical position, control/substation building,<br />
installation of underground electrical cables, formation of access tracks<br />
and upgraded access from the A1031 Fen Lane, meteorological monitoring<br />
mast of up to 78m height, crane hard standings areas, re-design of<br />
vehicular access into the Environments Agency’s flood reservoir and a<br />
temporary construction/storage compound together with other works<br />
ancillary to the main development including landscaping, fencing and<br />
habitat management enhancements at land at Louth Canal, Fen Lane,<br />
North Thoresby.<br />
PL 2<br />
Page 2