26.01.2015 Views

Public reports pack PDF 4 MB - East Lindsey District Council

Public reports pack PDF 4 MB - East Lindsey District Council

Public reports pack PDF 4 MB - East Lindsey District Council

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Planning Committee<br />

18.04.2013<br />

9) The dwellings hereby permitted must only be occupied by a person<br />

or persons allocated by the <strong>Council</strong>’s Housing Advice Service (or<br />

equivalent) or a Registered Provider, and subject to a Local<br />

Cascading Provision, details of which must first be submitted to and<br />

approved in writing by the Local Planning Authority prior to the first<br />

occupation of any of the dwellings hereby permitted. The Local<br />

Cascading Provision shall include details of the following:<br />

• The arrangements to ensure that such provision is affordable for<br />

both first and subsequent occupiers of the affordable housing; and<br />

• The occupancy criteria to be used for determining the identity of<br />

occupiers of the affordable housing and the means by which such<br />

occupancy criteria will be enforced. Those criteria shall accord with<br />

local cascading provisions.<br />

10) Prior to the first occupation of any of the dwellings hereby<br />

permitted the walls, fences and other means of enclosure shall be<br />

erected in accordance with the details as shown on approved plans<br />

0067/PA/003, Revision B, and 0067/PA/010 both received by the<br />

Local Planning Authority on 11th February 2013, and retained as<br />

such thereafter.<br />

11) Prior to the first occupation of any of the dwellings hereby<br />

permitted, the foul water disposal from the dwellings shall be<br />

connected to the mains system as set out in the planning<br />

application.<br />

12) Prior to the first occupation of any of the dwellings hereby<br />

permitted, full details of the proposed soakaway system(s) for the<br />

disposal of surface water from the development hereby permitted,<br />

including percolation test results, shall be submitted to and<br />

approved in writing by the Local Planning Authority. Should the<br />

percolation test results be considered unacceptable by the Local<br />

Planning Authority details of an alternative means of providing for<br />

surface water drainage shall be submitted for consideration. The<br />

approved means of surface water drainage shall be implemented in<br />

full before the development hereby permitted is first brought into<br />

use.<br />

13) Prior to the first occupation of any of the dwellings hereby<br />

permitted, the development must be carried out in complete<br />

conformity with the approved plans and specifications, unless<br />

otherwise indicated or to a timetable to be submitted to and agreed<br />

in writing by the Local Planning Authority (the development must<br />

be completed in accordance with any such timetable). In particular,<br />

the development should be constructed in accordance with the<br />

requirements of the Flood Risk Assessment, received by the Local<br />

Planning Authority on 4th January 2013, including the following<br />

mitigation:<br />

PL 18<br />

Page 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!