Energy Production<br />

Power plant availability at 90.8% exceeds planned levels.<br />

Cumulative generation of 9,559 GWH.<br />

Continued power plant modernization plans:<br />

• Supervision and control system at four<br />

units of the San Carlos Power Plant.<br />

• Completed modernization of the San Carlos<br />

and Jaguas generators.<br />

Total generation for<br />

the year increased<br />

3.2% compared<br />

to 2009, thanks to<br />

effective operational<br />

management<br />

and timely<br />

maintenance plan<br />

implementation.