27.01.2015 Views

Lindenberg Emirates Company Profile

Lindenberg Emirates Company Profile

Lindenberg Emirates Company Profile

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ongoing Projects – Water & Drainage<br />

Project Value (AED)<br />

• Water Transmission Pipeline in Dubai (2007) 85<br />

• Water Transmission Scheme inside Sadiyat Island (2008) 577<br />

• Water Transmission Pipeline in Baniyas (2008) 86<br />

• EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa<br />

Floating Reservoir Station – Lot D (2010)<br />

• Replacement of Existing Sewer Networks Inside Abu Dhabi Island (2010) 116<br />

174.5<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!