<strong>MIHAN</strong> <strong>India</strong> <strong>Limited</strong><br />

Dr. Babasaheb Ambedkar International Airport<br />

NAGPUR – 440 005<br />

Ref No: MIL/NGP/ENGG(E)/NIQ- 0 1/2012 - 1 3/ Date: 3 1 / 05/2012<br />

NOTICE INVITING QUOTATION- 0 1<br />

Sealed item rate quotations are invited by the Manager Engg. (E), MIL, Nagpur,<br />

Airport on behalf of Sr. APD & CEO, MIL Nagpur from Agency specialized in similar nature of<br />

work for the following works.<br />

No Name of work Estimated cost Completion period<br />

1. Supply of 2 Volt, 100AH, Rechargeable<br />

Batteries for HT Breaker Tripping System<br />

at New Service Block Dr. Babasaheb<br />

Ambedkar International Airport.<br />

Rs. 55,125/-<br />

15 Days<br />

Quotation will be issued from 0 1 - 0 6 -12 and received till 1 1 - 0 6 -12 up to 1530 hrs &<br />

opened on the same day at 1530 hrs. It will be issued to the contractors/ firms/ authorized<br />

dealers who produce certificates from clients of having satisfactorily completed at least Two<br />

works of Rs. 27,563/ - or one work of Rs.44,100/ - of similar nature during last three<br />

years and produce proof of annualized average financial turn over of Rs. 16,536/ - against<br />

work executed during the last three years. Consortiums/joint venture companies shall not<br />

be permitted.<br />

Application for issue of Quotation shall be submitted upto 11.06.2012 at 1400 Hrs<br />

along with self attested copies of valid Registration, Permanent Account Number (PAN), and Client's<br />

Certificate for experience indicating date of completion as per agreement and actual date of<br />

completion of work, Completion cost along with relevant work order and BOQ etc. The financial<br />

turnover should be supported with annual report (abridge balance sheet and profit & loss account) and<br />

list of T & P available for the use in the work shall be submitted.<br />

The original certificates shall be produced for verification before the issue of<br />

quotation.<br />

MIL reserves the right to accept or reject any or all quotations without assigning any<br />

reasons there of.<br />

COPY TO :<br />

Manager ( Engg.- E)<br />

For and on behalf of Sr. APD & CEO,<br />

MIL, Nagpur Airport, Nagpur<br />

Sr. Airport Director & CEO, MIL, Dr. Babasaheb Ambedkar Intl. Airport, Nagpur.<br />

Sr. Manager (Fin) MIL, Dr. Babasaheb Ambedkar Intl. Airport, Nagpur.<br />

Elect. Engineer (E-E), MIL, Dr. Babasaheb Ambedkar Intl. Airport, Nagpur.<br />

Concerned file<br />

Notice Board


<strong>MIHAN</strong> <strong>India</strong> <strong>Limited</strong><br />

Dr. Babasaheb Ambedkar International Airport<br />

NAGPUR – 440 005<br />

Ref No: MIL/NGP/ENGG(E)/NIQ-01/2012 - 1 3/<br />

Date:<br />

NOTICE INVITING QUOTATION<br />

To,<br />

---------------------------------------------------------<br />

--------------------------------------- -----------------<br />

---------------------------------------------------------<br />

Name of work: -<br />

Supply of 2 Volt , 1 0 0 AH, Rechargeable Batteries for HT<br />

Breaker Tripping Syst em at New Service Block Dr. Babasaheb<br />

Ambedkar International Airport.<br />

1. Sealed quotations are invited for the above work by the Manager Engg.(E). In the<br />

following address on behalf of Sr. APD & CEO, MIL, Nagpur Airport, Nagpur<br />

Manager (Engg-Elect)<br />

MIL, Dr. Babasaheb Ambedkar International Airport,<br />

Nagpur-05.<br />

2. You are requested to quote your rate against each item shown in schedule attached. The<br />

amount for each item shall be worked out and the requisite totals given. Special care<br />

shall be taken to write rates in figures as well as in words and the amounts in figures<br />

only in such a way that interpolation is not possible. The total amount shall be written in<br />

both figures and in words.<br />

3. Quotations, which should always be placed in sealed covers super-scribing the name of<br />

work, shall be received by Manager ( Engg-Elect) upto 15:00 hours on 1 1 - 0 6 -2012<br />

and shall be opened at 15:30 hours on the same day.<br />

4. You are advised to inspect and examine the site and satisfy yourself about the nature of<br />

work and the site before submitting the quotation. You shall be deemed to have full<br />

knowledge of the site. Whether you inspect it or not and no extra charges consequent on<br />

any misunderstanding or otherwise shall be allowed.<br />

5. Period of completion of the work is 15 ( Fifteen) Day which shall be reckoned from the<br />

date of placing the work order. If you fail to complete the work within the stipulated<br />

period and no justifiable reasons are found for the delay you shall be liable to pay the<br />

compensation for delay at the rate of one percent of the total value or work order per<br />

week of delay subject to maximum of Rs. 5,512/ - ( Rupees Five Thousand Five<br />

Hundred & Tw elve Only) The amount of compensation for delay or waived of<br />

compensation delay in case of justified reasons shall be decided at the discretion of<br />

competent Authority and same shall be final and biding on you.<br />

6. The work shall be executed as per C.P.W.D. specifications and shall be approved in<br />

stages by Manager (Engg-Elect) will be Engineer-in-charge for this job. The work shall<br />

be carried out to the entire satisfaction of Engineer-In-Charge. Materials not approved<br />

by the Engineer-in-charge shall not be used in executing the work.<br />

P.T.O.


-- 2 --<br />

7. The quantity shown schedule may vary during the actual execution of work. You shall<br />

carry out the work as per actual site requirement. Increase in quantity of item or items<br />

of work shall be executed by you at the quoted rates upto a limit so that the total<br />

increase does not exceed more than 10% of the work ordered value.<br />

8. On completion of work, each item of work shall be jointly measured by you or your<br />

authorized representative and the Engineer-in-charge and entered into the measurement<br />

Book. All debris, unused material, panting stains on walls or floors developed at site<br />

during the course of execution of work shall be removed and the area shall be left clean<br />

by you in all respect as directed by the Engineer-in-charge without any extra cost.<br />

9. You will be allowed payments for which bills shall be submitted by you to the Engineer-<br />

In-Charge. 10 % of the total value of work order shall be deducted as security deposit<br />

from the bills and IT, WT as applicable.<br />

10. On satisfactory completion of work Final bill shall be submitted by you to the Engineerin-charge<br />

and same shall be processed with following documents:<br />

a). Yours final bill.<br />

b). Measurement Book jointly signed by you and Engineer-In-Charge.<br />

c). Completion certificate issued by Engineer-in-charge.<br />

d). Other relevant documents if any.<br />

11. You shall be responsible to make good and ready at your own expense of any defect,<br />

which may develop or may be noticed within the defects liability period which shall be<br />

reckoned as 12 months from the days of completion. The security deposit shall be<br />

refunded only after expiry of defects liability period. However the warranty given by the<br />

manufacturers will remain in force even offer the expiry of defect liability period.<br />

12. The quotations shall be valid for 03 months from the date of opening.<br />

(Signature of Contractor with seal) Manager (Engg.- E)<br />

MIL, Nagpur Airport, Nagpur


This document was created with Win2PDF available at http://www.win2pdf.com.<br />

The unregistered version of Win2PDF is for evaluation or non-commercial use only.<br />

This page will not be added after purchasing Win2PDF.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!