29.01.2015 Views

details..... - Chennai Telephones - BSNL

details..... - Chennai Telephones - BSNL

details..... - Chennai Telephones - BSNL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Name of work: Replacement of scrapped split AC unit with 8 nos 1.5 TR S/T AC units<br />

at St Thomas Mount, chennai (SW: AC Wiring )<br />

ii) The tenderer shall submit the original computer printout of the tender documents<br />

downloaded from the internet. Photocopy shall not be accepted.<br />

iii) The Tender documents shall not be sent through the Courier/Post. Tender<br />

documents received through Courier/post shall not be opened / considered at all.<br />

All communication with the bidders shall be in writing. Fax / E-mail shall be covered<br />

under this category and considered as adequate means of communication.<br />

25. The Notice Inviting Tender shall form part of the contract document, in accordance<br />

with clause-1 of the contract. The contract shall be deemed to have come into effect on<br />

issue of communication of acceptance of tender. On such communication of acceptance,<br />

the successful tenderer /contractor shall within 15 days from such date, formally sign the<br />

contract consisting of:-<br />

a) The Notice Inviting Tender, all the documents including additional conditions,<br />

specifications and drawings, if any, forming part of the tender and as issued at<br />

the time of invitation of tenders and acceptance thereof together with any<br />

correspondence leading thereto.<br />

b) Standard E.W.-8 Form.<br />

25(ii) EPF PROVISIONS:-<br />

The agency has to comply with the provisions of EPF and miscellaneous provisions Act-<br />

1952 and employees provident fund scheme-1952 as amended up to date in respect of<br />

labours/employees engaged by them for this work. Any consequence arising due to noncomplying<br />

of provisions as specified above shall be the sole responsibility of the firm only.<br />

The agency shall give an undertaking to this effect as per the prescribed proforma<br />

(UNDERTAKING REGARDING EPF PROVISIONS)<br />

.<br />

26. ELIGIBILITY CRITERIA: - As per tender notification in page 3.<br />

Sub Divisional Engineer (E)<br />

Electrical Sub Division - VII <strong>Chennai</strong><br />

For and on behalf of<br />

Bharat Sanchar Nigam Limited.<br />

Contractor Internet Downloaded copy Sub Divisional Engineer (E)<br />

Page No. 16 of 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!