The Cost<br />
TOTAL PROJECT COST: $154,200<br />
SCAQMD GRANT FUNDING: - $137,800<br />
COST TO LACSD: $16,400<br />
FUEL SAVINGS OVER 9,000 HRS<br />
~ $23,400 or 17%