29.01.2015 Views

SCG draft report on 2022 Common Case assumptions - Western ...

SCG draft report on 2022 Common Case assumptions - Western ...

SCG draft report on 2022 Common Case assumptions - Western ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Name<br />

San Luis Rio Colorado (SLRC)<br />

Project<br />

San Luis Valley-Calumet-<br />

Comanche<br />

South Orange County Reliability<br />

Upgrade Project (SOCRUP)<br />

Southline Transmissi<strong>on</strong> Project<br />

(Aft<strong>on</strong>-Apache)<br />

Southline Transmissi<strong>on</strong> Project<br />

(Apache-Saguaro)<br />

Sun Valley – Trilby Wash 230kV<br />

Line<br />

Sunrise Powerlink<br />

SunZia Southwest Transmissi<strong>on</strong><br />

Project<br />

Sp<strong>on</strong>soring<br />

Organizati<strong>on</strong>(s)<br />

North Branch<br />

Resources, Generadora<br />

del Desierto, SA de CV,<br />

and <strong>Western</strong> Area<br />

Power Administrati<strong>on</strong><br />

Public Service of<br />

Colorado (PSCo) and<br />

Tri-State G&T<br />

San Diego Gas &<br />

Electric<br />

Southline<br />

Transmissi<strong>on</strong>, L.L.C.<br />

Southline<br />

Transmissi<strong>on</strong>, L.L.C.<br />

Ariz<strong>on</strong>a Public Service<br />

Company<br />

San Diego Gas &<br />

Electric<br />

South<strong>Western</strong> Power<br />

Group, Salt River<br />

Project, Tucs<strong>on</strong> Electric<br />

Power, Shell<br />

WindEnergy, and Tri-<br />

State Generati<strong>on</strong> &<br />

Transmissi<strong>on</strong><br />

Associati<strong>on</strong><br />

Project<br />

voltage(s)<br />

Estimated Cost<br />

Primary<br />

Purpose<br />

200-300kV AC Ec<strong>on</strong>omic driven No<br />

200-300kV<br />

AC; 300-<br />

450kV AC<br />

450kV AC $1.9 billi<strong>on</strong> Ec<strong>on</strong>omic driven Yes Yes<br />

>450kV AC Ec<strong>on</strong>omic driven No<br />

SWIP North Great Basin >450kV AC TBD Ec<strong>on</strong>omic driven No<br />

No<br />

No<br />

<strong>2022</strong> CCTA<br />

Appendix C - 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!