MWG: Modeling Work Group - The MWG evaluates and proposes improved models for producti<strong>on</strong> cost<br />

simulati<strong>on</strong>.<br />

NERC: North American Electric Reliability Corporati<strong>on</strong> - NERC is the electric reliability organizati<strong>on</strong><br />

certified by the Federal Energy Regulatory Commissi<strong>on</strong> to establish and enforce reliability standards for<br />

the bulk-power system.<br />

OTC: Once-Through-Cooling - To withdraw water using a single-pass system to cool power plant<br />

processing equipment.<br />

Path - Path, or Transmissi<strong>on</strong> Path, is a single or set of transmissi<strong>on</strong> lines with an established rating. There<br />

are 66 WECC-rated paths in the <strong>Western</strong> Interc<strong>on</strong>necti<strong>on</strong>. Paths are analogous to the term “flowgate”<br />

used in other parts of North America.<br />

PCM: Producti<strong>on</strong> Cost Model - An analytic representati<strong>on</strong> of an electrical generati<strong>on</strong> and transmissi<strong>on</strong><br />

system used to determine the most efficient dispatch of generati<strong>on</strong> to meet system loads within the<br />

reliability c<strong>on</strong>straints <strong>on</strong> power system operati<strong>on</strong>s.<br />

RAS: Remedial Acti<strong>on</strong> Scheme - An automatic protecti<strong>on</strong> system designed to detect abnormal or<br />

predetermined system c<strong>on</strong>diti<strong>on</strong>s, and take corrective acti<strong>on</strong>s other than and/or in additi<strong>on</strong> to the<br />

isolati<strong>on</strong> of faulted comp<strong>on</strong>ents to maintain system reliability. Such acti<strong>on</strong> may include changes in<br />

demand, generati<strong>on</strong> (MW and Mvar), or system c<strong>on</strong>figurati<strong>on</strong> to maintain system stability, acceptable<br />

voltage, or power flows. A RAS does not include (a) underfrequency or undervoltage load shedding or<br />

(b) fault c<strong>on</strong>diti<strong>on</strong>s that must be isolated or (c) out-of-step relaying (not designed as an integral part of<br />

an SPS). Also called a Special Protecti<strong>on</strong> System.<br />

Renewable Generati<strong>on</strong> - Energy derived from resources that are regenerative or for all practical<br />

purposes cannot be depleted.<br />

ROW: Right of Way - A corridor of land <strong>on</strong> which electric lines may be located. The Transmissi<strong>on</strong> Owner<br />

may own the land in fee, own an easement, or have certain franchise, prescripti<strong>on</strong>, or license rights to<br />

c<strong>on</strong>struct and maintain lines.<br />

RPS: Renewable Portfolio Standard - A regulati<strong>on</strong> that requires an established level of producti<strong>on</strong> or<br />

purchase of energy from renewable energy sources, such as wind, solar, biomass, and geothermal.<br />

Scenario - A plausible future that is defined by various ec<strong>on</strong>omic, social, political, and technological<br />

factors.<br />

<str<strong>on</strong>g>SCG</str<strong>on</strong>g>: SPG Coordinati<strong>on</strong> Group - Coordinates SPG activities of mutual interest related to TEPPC activities.<br />

<str<strong>on</strong>g>SCG</str<strong>on</strong>g> Foundati<strong>on</strong>al Projects List - The <str<strong>on</strong>g>SCG</str<strong>on</strong>g> facilitated the preparati<strong>on</strong> of and developed the criteria for the<br />

<str<strong>on</strong>g>SCG</str<strong>on</strong>g> Foundati<strong>on</strong>al Transmissi<strong>on</strong> Projects List. The list identified projects having a high-probability of<br />

being c<strong>on</strong>structed by 2020. These projects provide an assumed minimum transmissi<strong>on</strong> system starting<br />

point for TEPPC’s future planning studies, and are included as inputs into the WECC 10-Year Regi<strong>on</strong>al<br />

Transmissi<strong>on</strong> Plan.<br />