30.01.2015 Views

Pavement Design Catalogue - LGED

Pavement Design Catalogue - LGED

Pavement Design Catalogue - LGED

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Plate UPR-BC1-BS-2<br />

This is a Upazila Road Bus stop option through a small market place It needs<br />

widening of Upazila Road pavement. It will contribute ease traffic flow through<br />

market place and durability of pavement life.<br />

Plate UPR-BC1-BS-3<br />

This is a Upazila Road Bus stop option through a large market place or built-up<br />

area. It needs widening of Upazila Road pavement. It will contribute ease traffic<br />

flow through market place or built-up area and durability of pavement life.<br />

ROAD JUNCTION AND BUS STOP AT UNION ROAD<br />

Similar drawing plates have been provided for road junction treatment and bus<br />

stop for Union Roads as well.<br />

ROAD EMBANKMENT PROTECTION AT CHAR AND HAOR AREA<br />

Plate UPR-UNR-EM1-1/2 & 2/2<br />

This is an option of Road Embankment Protection at Haor or waterlogged Areas<br />

where tremendous wave action results erosion on the Embankment due to storm<br />

and high-speed wind.<br />

Plate UPR-UNR-EM2-1<br />

This is an option of Road Embankment Protection at char area where lands are<br />

inundated due to normal floods and wave action results erosion to the<br />

Embankment during floods.<br />

Note: If char land remains above normal flood water level, embankment of road<br />

shall be lined with clayey soil (0.30m thick), PI value range 8 to 20%. Turfing or<br />

seedling with ‘Durba’ grass is a must over lining of side embankment.<br />

19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!