2010 Full Year Results Presentation - Antofagasta plc
2010 Full Year Results Presentation - Antofagasta plc
2010 Full Year Results Presentation - Antofagasta plc
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Production and realised prices analysis – <strong>2010</strong><br />
Copper (‘000 tonnes)<br />
Copper, molybdenum and gold production<br />
2009 <strong>2010</strong> <strong>2010</strong>H1 <strong>2010</strong>H2 <strong>2010</strong>B* 2011E**<br />
Los Pelambres 311.6 384.6 186.1 198.5 407.3 419.2<br />
Esperanza - - - - - 159.1<br />
El Tesoro 90.2 95.3 47.3 48.0 96.3 96.1<br />
Michilla 40.6 41.2 19.5 21.7 40.1 40.5<br />
Group total 442.5 521.1 252.9 268.2 543.7 714.8<br />
Molybdenum (‘000<br />
tonnes)<br />
Los Pelambres 7.8 8.8 4.4 4.4 9.6 9.3<br />
Gold (‘000 ounces)<br />
Los Pelambres 23.5 35.1 15.5 19.6 14.3 37.6<br />
Esperanza 0.0 0.0 0.0 0.0 0.0 286.4<br />
Group total 23.5 35.1 15.5 19.6 14.3 324.0<br />
Realised copper price (c/lb) and molybdenum<br />
price (US$/lb)<br />
Copper 2009 <strong>2010</strong> <strong>2010</strong>H1 <strong>2010</strong>H2<br />
Los Pelambres 286.8 371.7 304.1 422.4<br />
El Tesoro 246.3 351.9 319.7 382.7<br />
Michilla 195.7 263.8 244.2 282.5<br />
LME price 234.2 342.0 323.4 350.4<br />
Molybdenum<br />
Los Pelambres 11.3 16.2 16.8 15.6<br />
Market price 11.1 15.7 16.1 15.4<br />
•Original forecast for <strong>2010</strong><br />
** Initial forecast for 2011 production depends on a number of factors including the precise timing of the completion of ramp-up at Esperanza<br />
35