01.02.2015 Views

2010 Full Year Results Presentation - Antofagasta plc

2010 Full Year Results Presentation - Antofagasta plc

2010 Full Year Results Presentation - Antofagasta plc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Production and realised prices analysis – <strong>2010</strong><br />

Copper (‘000 tonnes)<br />

Copper, molybdenum and gold production<br />

2009 <strong>2010</strong> <strong>2010</strong>H1 <strong>2010</strong>H2 <strong>2010</strong>B* 2011E**<br />

Los Pelambres 311.6 384.6 186.1 198.5 407.3 419.2<br />

Esperanza - - - - - 159.1<br />

El Tesoro 90.2 95.3 47.3 48.0 96.3 96.1<br />

Michilla 40.6 41.2 19.5 21.7 40.1 40.5<br />

Group total 442.5 521.1 252.9 268.2 543.7 714.8<br />

Molybdenum (‘000<br />

tonnes)<br />

Los Pelambres 7.8 8.8 4.4 4.4 9.6 9.3<br />

Gold (‘000 ounces)<br />

Los Pelambres 23.5 35.1 15.5 19.6 14.3 37.6<br />

Esperanza 0.0 0.0 0.0 0.0 0.0 286.4<br />

Group total 23.5 35.1 15.5 19.6 14.3 324.0<br />

Realised copper price (c/lb) and molybdenum<br />

price (US$/lb)<br />

Copper 2009 <strong>2010</strong> <strong>2010</strong>H1 <strong>2010</strong>H2<br />

Los Pelambres 286.8 371.7 304.1 422.4<br />

El Tesoro 246.3 351.9 319.7 382.7<br />

Michilla 195.7 263.8 244.2 282.5<br />

LME price 234.2 342.0 323.4 350.4<br />

Molybdenum<br />

Los Pelambres 11.3 16.2 16.8 15.6<br />

Market price 11.1 15.7 16.1 15.4<br />

•Original forecast for <strong>2010</strong><br />

** Initial forecast for 2011 production depends on a number of factors including the precise timing of the completion of ramp-up at Esperanza<br />

35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!